Telecopy Ao:On 750426,sample of Reactor Coolant Showed Conductivity & Chloride Concentration Exceeding Tech Spec Limit.Caused by Condenser Tube Leak.Correction of Tube Leak Planned
ML20084S634
Person / Time
Site: Quad Cities 
Issue date: 04/28/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S625 List:
References
NJK-75-226, NUDOCS 8306170141
Download: ML20084S634 (1)


Text

i s 1

_ ~

L..

a._

w

- ^

'M p

i Ouad-Cities Generating Station y - [f ") f((l. g[

Commonw.

h Edia::n f

Post Office Box 216 Cordova. tilinois 61242

.y Telephone 309/054-2241 s

'Ys NJK-75-226 4

p Q

(Q.Nij',.p ty I; ?

y TELECOPY: Region ill, Attention:

Mr. C. Felerabend n

v f3

,9 p

y NU f

April 28, 1975

/

m 5.-

3 g

, g.,

J. Keppler, Regional Director Directorate of Regulatory Operations - Region ill U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Elly, IL 60137

REFERENCE:

Quad-Ci ties Nuclear Power Station, Uni t 2 Docket No. 50-265, DPR-30 Appendix A, Sections 1.0.A.2, 3.6.C.3, 6.6.B.I.a

Dear Hr. Keppler:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.I.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

During the start-up test program on Unit 2 following the cycle i refuel outage, the reactor was shutdown to change control rod patterns.

Start-up commenced at 7:02 p.m. on April 26, 1975 An earlier (5 p.m.) sample of reactor coolant showed conductivity of 8.65 umbo and chloride concentration of 0.295 ppm.thus exceeding Technical Speci fication 3.6.C.3 Upon realization of this. occurrence, It an orderly shutdown'was commenced with the reactor subcritical at 8:32 p.m. Pre-is suspected that the high readings were caused by a condenser tube leak.

sent plans are to identify and correct the tube leaks during the present shutdown.

Latest reactor coolant samples show the chloride concentration to be.049 ppm.

This occurrence was discussed by telephone with Mr. Feierabend of your office Further information will be provided by Abnorma! Occurrence on April 27, 1975 Report A0 50-265/75-15 which wi11 be submitted within 10 days of the date of this occurrence.

Very truly yours, COMMONWEALTil EDISON COMPAl1Y QUAD-CITIES NUCLEAR POWER STATION Y

$5E='

N. J. Kalsvianakis C

Station Superintendent 8306170141 750505 PDR ADOCK 05000265 S

NJK:CWS/dkp PDR cc: Directorate of Licensing J. S. Abel 4859

'dk* i

,% k" '

Comme!

)al;h Edison

,r 3 Ound-Cithd n mating St@on l

4

// LI Post 0" cc Bo < 216 j l'.\\. / / Cordova, Lhnois 61242

\\ \\

j y Te:cphone303/G54-2241 flJK-75-226 TELECOPY: Region ill, Attention:

fir. C. Feierabend April 28, 1975 J. Keppler, Regional Di rector Directorate of Regulatory Operations - Region iII U. S. liUCLEAR REGULATORY COMttiSSION 799 Roosevelt Road Glen Elly, IL 60137

REFERENCE:

Quad-Ci ties fluclear Power Station, Uni t 2 Docket flo. 50-265, DPR-30 Appendix A, Sections 1.0.A.2, 3.6.C.3, 6.6.D.I.a

Dear Mr. Keppler:

letter is to provide you with notification of an Abnormal The purpose of this 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of Occurrence as required by Technical Speci fication 6.6.B. I.a within 2/

the occurrence.

lini t 7 followina the cycle I refuel outage, C o.- i. 3 uw ;te rt u;- *rt pr7= an the reactor was shutdown to change control red patterns.

Start-up commenced 02 p.m. on April 26, 1975 An earlier (5 p.m.) sample of reactor coolant at 7:

thus showed condor.tivity of 8.65 umho and chloride concentration of 0.295 ppm, exceeding Technical Speci fication 3.6.C.3 Upon realization of this occurrence, an orderly shutdown was cor.menced with the reactor subcritical at 8:32 p.m.

It e Lt K.

P I'e-is suspected that the high readings were caue.cd by a condenser tubt.

sent plans are to identify and correct the tube leaks during the prcsent shutdown.

l Latest reactor coolant samples show the chloride concentration to be.0i9 ppn.

This occurrence was discussed by telephone with Mr. Feierabend of your office on April 27, 1975 Further.information will be provided by Abnormal Occurrence Report A0 50-265/75-15 which wi1i be submitted within 10 days of the date of this occurrence.

Very truly yours, COMM0!! WEALTH EDIS0N COMPANY QUAD-CITIES NUCLEAR POWER STAT 10ft

's

[

5,d ti. J. Kalivianakis O

Station Superintendent cf

\\'/

NJK:CUS/dkp