Telecopy Ro:On 730610,I-131 Release Rate Sample from 730607 Counted & Found to Exceed Limit.Cause Attributed to Steam Leakage Into Unit 2 Reactor Bldg from Cleanup Pump Seal Failure.Sample from 730608 Returned to Less than 30%
ML20084R365
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/11/1973
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084R350 List:
References
NUDOCS 8306150077
Download: ML20084R365 (2)


Text

O MGMCGBC CG0 #""'% O 2-046S19E162 06/11/

ICS 'IPMBNGZ CSP WM lI e

i h O 8096542241 MGM TDBN CORDOVA IL355 dh-S7Y43  ?*******

f fa2 3 9 ZIP 60137 O e O e D GRIER REGIONAL DIRECTOR O DIRECTORATE OF REGULATORY OPERATION BUREAU OF ATOMIC ENERGY COMMISSIO O N REGION 3 COMPLINCE 799 ROOSEVELT RD LEN ELLYN IL 60137 O

O e

_O RERERENCE REFERENCE QUAD CITIES NUCLEAR POWER STATION UNITS O ONE AND TWO DOCKET NUMBERS 50-254 AND 50-265 DPR 29 AND 30, APPENDIX A SECTION 1.0. A.2 AND 3.8.B.3. A TECHNICAL SPECIFICATION O 3.8.B .3. A SPECIFIES THE RELEASE RATE LIMIT FOR 10 DINE-131 AND O PARTICULATES WITH HALF LIVES LONGER THAN 8 DAYS FROM THE REACTOR BUILDING VENTILATIONS STACK. THE NORMAL PRACTICE IS TO COUNT O THE SAMPLE CARTRIDGE 48 HOURS AFTER REMOVAL TO DETERMINE A PRELIMINAR O Y ESTIMATE OF THE RELEASE RATE. THE ACTUAL RELEASE RATE IS BASED ON THE RESULTS OF A 7 DAY COUNT. ON JUNE 10 1973 THE JUNE 7TH O SAMeLE WAS C0uNTED AND DuE TO AN INCREASE IN THE ACTIVITY FROM O THE UNIT WO REACTOR BUILDING IT IS ESTIMATED THAT THE LCO WAS n EXCEEDED BY ABOUT 50 PER CENT. THIS INCREASE WAS ATTRIBUTED U TO STEAM LEAKAGE INTO THE UNIT TWO BUILDING FROM A CLEAN UP O PUMP SEAL FAILURE. THE 48 HOUR COUNT OF THE JUNE 8 1973 SAMPLE HAS RETURNED TO LESS THAN 30 PER CENT OF THE LCO.

O N TALIVIANAKIS QUAD CITY NUCLEAR POWER STATION CORD 0VA ILLIN0IS O 1635 ST O ,

MGMCGBC CG0 O e O e O e O e o

pmwa% yf/ O Vo O

JUli 131973 O e O e

m E

Q Q'

/sgttftp*% UNITED STATES gj j

l L.]

J. - ". i ATOMIC ENERGY COMMISSION DIVISION OF COMPLEANCE (W z-REGION til

} s/syg e 799 ROOSEVELT ROAD TELEPHONE

(

GLEN ELLYN, ILLINolS 60137 (312) ess-2sso m

i E

1 A. RO Inspection Report No. .,

g Transmittal Date  :

f Distribution:

Distribution:

P. R0 Chie f, FS&EB R0 Chie f, FS&EB i RO:HQ (5) RO:HQ (4)

. DR Central Files L:D/D for Fuel & Materials ..

p Regulatory Standards (3) DR Central Files Licensing (13) k ..

A B

I B. RO Inquiry Report No.

Transmittal Date  :

5 Distribution: Distribution: -

' R0 Chie f, FS&EB R0 Chie f, FS&EB RO:HQ (5)

RO:HQ 5 DR Central Files DR Central Files Regulatory Standards (3)

[

Licensing (13)

=

E ..

m I C. Incident Notification From: Commonwealth Edison 50-254 and 50-265

[ (Licensee & Docket No. (or License No.)

E j I Transmittal Date  : June 13, 1973 F .

m Distribution: Distribution:

g RO Chie f. FS&EB R0 Chie f, FS&EB _

? RO:HQ (4) RO:HQ (4) .

, Licensing (4) L:D/D for Fuel & Materials g DR Central Files DR Central FLles R0 Files ,

[ . ,

i:

v' g,

---m.=

3

@4 7 -

l- [' ,y r; ~- C ' -- - ' -