ML20084Q078
| ML20084Q078 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 03/03/1974 |
| From: | Newkirk R COMMONWEALTH EDISON CO. |
| To: | Oleary J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084Q060 | List: |
| References | |
| NUDOCS 8306130114 | |
| Download: ML20084Q078 (1) | |
Text
-. - - - -.
N O
O e:::v:s MGHUSHT4HSB
- Da mestern union u dl' ;h ([p'hy y R e3 A '
- .% #l
[
=k D
' ' '.' p~n } -
c"
- t i ^ {E
~
2=011922E062 03/03/74
- iM M Q
3193558116 MGM TOBN BETTENDORF IA 117 03=03 0520P EDT ZIP 20545 0
.x \\
~
t c)
- )[
J 0 LEARY b h,g O
7 Vg dg g
DIRECTOR OF LICENSING V $ ATOMIC ENERGY COMMISSIONi i
'1h\\p (/)# 3 [<e 3
WASHINGTON DC 20545 b
O REFERENCE QUA0 CITIES NUCLEAR POWER STATION DOCKET e50-254, O-OPR 29, APPEN0!X A SECTION 1.0,A 3, 1.0,A.5 WITH UNIT OLE OPERATING AT ABOUT 425MWE AND EXPLOSION OCCURED i
IN THE OFF GAS HOLOUP LINE AT 2020 ON MARCH 2 1974 THE EFFECTED 0
&!R EJECTOR AND OFF GAS FILTER WERE ISOLATED BEFORE CONTINUING THE STARTUP, CHIMMNEY RELEASE RATE WAS LESS THAN 50 PERCENT 4
0F THE LIMITS OF SPECIFICATION 3.8.A AT ALL TIMES AND RETURNED O
TO ABOUT 25 THOUSAND MICR0 CURIES PER SECOND WITHIN Two HOURS.
THE CAUSE OF THE EXPLOSION IS UNKN0nN AN INVESTIGATION IS IN t
PROGRESS R A NEWKIRK L
17:20 EST O
MGMWSHT HSB O
O O
O O
t
/
O
}j&p' t
s
\\\\
8306130114 740312
- il T
b r
PDR ADDCK 05000254
\\
c S
PDR O
L 0
M L
COPY SENT REGION g
d299
,