ML20084Q069
| ML20084Q069 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 03/03/1974 |
| From: | Newkirk R COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084Q060 | List: |
| References | |
| NUDOCS 8306130110 | |
| Download: ML20084Q069 (2) | |
Text
em m o
O 888 2 03/03/~t WM 1
_E S,i O 'I C IPMBNGZ CSP mestem union a
5 OT=t A 3193558116 MGM TDBN BETTENDORF I A !!7 03-03 0518P EDT ZIP 60137 O
e O
e g>. JAMES KEPPLER US ATOMIC ENERGY COMMISSION 799 ROOSEVELT RD GLEN El. LYN IL 60137 O
e O
e
~
O
REFERENCE:
QUAD CITIES NUCLEAR POWER STATION DOCKET #50-254, g
DPR 29, APPENDIX A SECTION 1.0. A.3, 1.0.A.5 WITH UNIT ONE OPERATING AT ABOUT 425MWE AND EXPLOSION OCCURED Q I N THE OFF GAS HOLDUP LINE AT 2020 ON MARCH 2 1974. THE EFFECTED g1 AIR EJECTOR AND OFF GAS FILTER WERE ISOLATED BEFORE CONTINUING THE STARTUP. CHIMMNEY RELEASE RATE WAS LESS THAN 50 PERCENT j
O OF THE LIMITS OF SPECIFICATION 3.8. A AT ALL TIMES AND RETURNED g'
TO ABOUT 25 THOUSA ND MICR0 CURIES PER SECOND WITHIN TWO HOURS.
THE CAUSE OF THE EXPLOSION IS UNKNOWN AN INVESTIGATION IS IN O PROGRESS g
RA NEWKIRK Q 1719 EDT gl MGMCGBB CGO O
e, O
el O
e O
e O
e, O
el M^R O
i O
t l
- l
,. i k
e O
e30312o11o 74o3 2 1 <*
^
DRADOCK05000g
/_
O e
O e
UNITED STATES L.
ATOMIC ENERGY COMMISSION
~'
S, j
DIRECTOR ATE OF REGULATORY OPERATIONS 4
p REGION lit v
- 4Ef t 65 799 ROOSEVELT ROAD gegg GLEN ELLYN, ILLINOIS 60137 (312) 858-2660 A.
RO Inspection Report No.
Transmittal Date Dietribution:
Distribution:
RO Chief, FS&EB RO Chief, FS&EB RO:HQ (5)
RO:HQ (4)
DR Central Files L:D/D for Fuels & Materials Regulctory Standards (3)
DR Central Files Licensing (13)
RO Inquiry Report No.
Transmittal Date Distribution:
Distribution:
RO Chief, FS&EB RO Chief, FS&EB RO:HQ (5)
RO:HQ DR Central Files DR Central Files Regulatory Standards (3)
RO Files Licensing (13)
RO Files C.
Incident Notification From:
Com=onwealth Edison Co. Docket No. 50-254 (Licensee & Docket No. (or License No.)
1 Transmittal Date March 7, 1974 Distribution:
Distribution:
RO Chief, FS&EB RO Chief, FS&EB
=
RO:HQ (4)
RO:HQ (4)
Licensing (4)
L:D/D for Fuels & Materials
]
DR Central Files DR Central Files
]
R0 Files RO Files 1
4 5>_,,'[v. j,,,...
.?.-
f'. b
^
. ~ l'v - -'.. l T. A if..,,,j*-3}.... nr Q g -C Kr.,R.'Q 'S f _
w'; eg %
- u%j* ! :) $ f ^ f.'y L '
...-t 4
!^
w u
- gy m
_n-_--