ML20084Q018

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept 84-05 Re Feedwater Piping Spools. Final Rept Will Be Submitted by 840608 Rather than 840427 Per 840423 Telcon
ML20084Q018
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/04/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
84-05, 84-5, NMP2L-0046, NMP2L-46, NUDOCS 8405210066
Download: ML20084Q018 (1)


Text

M V NIAGARA R UMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 May 4, 1984 (NMP2L 0046)

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Starostecki:

SUBJECT:

Nine Mile Point Unit 2 Docket No. 50-410 The final report in accordance with 10CFR50.55(e) concerning Feedwater Piping Spools (55(e)-84-05) will be submitted to the Nuclear Regulatory Commission by June 8,.1984, rather than April 27, 1984, as previously committed. This extension was granted via telecon between Mr. T. Loomis (Nine Mile Point Unit 2 Licensing) and W. Lazerus of your staff on April 23, 1984.

Very truly yours, C. V. Mangan Vice President Nuclear Engineering and Licensing CVM/TRL:lf cc: Director of Inspection and Enfprcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. Gram, Resident Inspector

~

8405210066 840504

~

PDR ADOCK 05000410 S

PDR is 2-