e VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1983 4.

l 1

APPROVED:

I - A gSTATIONMANAGER 1 8306020092 030405 PDR ADOCK 05000338

. R PDR

-, . _. = = - .

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 04-05-83 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 bPERATINGSTATUS Notes

1. Unit Name: -

North f.nna 1

2. Reporting Period: March 1983
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 918
7. Maximum Dependable Capacity (Net MWe): 865
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasors:

N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 2,160 42,241
12. Number of Hours Reactor Was Critical 522.6 522.6 27,645.6 i
13. Reactor Reserve Shutdown Hours 120.8 120.8 2,118.9
14. Hours Generator On-Line 443 443 26,825.2
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,021,878 1,021,878 69,281,232
17. Gross Electrical Energy Generated (MWH) 341,613 341,613 22,126,145
18. Net Electrical Energy Generated (MWH) 322,100 322,100 20,842,833
19. Unit Service Factor 59.5 20.5 62.5
20. Unit Availability Factor 59.5 20.5 62.5
21. Unit Capacity Factor (Using MDC Net) 50.0 17.2 57.0
22. Unit Capacity Factor (Using DER Net). 47.7 16.4 54.4
23. Unit Forced Outage Rate 40.5 79.5 -12.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITI COMMERCIAL OPERATION l

t UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338 UNIT NAME North Anna 1 DATE 04-05-83 REPORT MONTH March COMPLETED,BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 Type Duration Reason2 l

No. Date Method of Licensee System Component Cause & Corrective (Hours) Shutting 3

ven Code 4

Code Action to 5

Down Reactor Report # Prevent Recurrence 82-12 821205 F 180.2 A 3 82-85 SF INSTRU Replacement / Testing of Main Generator and Main Transformers is completed. Unit returned to service.

83-01 830308 F 120.8 H I NA NA NA Normal rampdown to off-line, followed by cooldown to in-vestigate " Loose Parts" Alarm on "C" Steam Generator.

Problem was resolved and unit returned to service.

I 2 3 4 F: Forced Reason: Method: -Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data l B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction .4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain) Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 04-05-83 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2117 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 448 2 0 18 762 3 0 19 879 4 0 20 869 5 0 21 845 6 0 22 870 7 0 23 '879 8 97 24 879 9 0 25 880 10 0 26 874 11 0 27 879 12 0 28 879 13 1 29 880 14 241 30 887 15 252 31 888 16 250 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH March UNIT NAME NA-1 YEAR 1983 DATE 04-05-83 COMPLETED BY G. D. Schmitendorf 82-12 (A) (3) At 1214 on March 8,1983 the unit was returned to on-line following replacement of the Main Generator and Main Transformers. Prior to placing the unit on-line, a

" Loose Parts" alarm was received indicating a loose part may exist in the secondary side of "C" steam generator.

The decision was made to place the unit on-line and escalate to 30% power to evaluate the loose part indication at higher feedwater flows and to allow completion of main generato- and main transformer testing under loaded conditions.

83-01 (H) (1) At 2120 on March 8, 1983, following completion of main generator and main transformer testing, the unit was ramped off-line and cooled down to Mode 5 for inspection of the "C" steam generator. Inspection of "C" steam generator was required as a precautionary measure due to

" Loose Parts" indication received prior to placing the unit on-line and which continued during operation at 30%.

A thorough inspection of the "C" steam generator determined that there were no loose parts in the steam generator. The unit was returned to power and placed on-line at 2330 on March 13, 1983 and reached 100% power at 2249 on March 18, 1983.

OPERATING DATA REPORT DOCKET NO. 50-339 DATE 04-05-83 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: .

North Anna 2

2. Reporting Period: March 1983
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe)
947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A

9. Power rel To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 2,160 20,112
12. Number of Hours Reactor Was Critical 741 2,073.1 14,576.2
13. Reactor Reserve Shutdown Hours 6.7 135.8 2,157.6
14. Hours Generator On-Line 737.3 2,024.2 14,476.9
15. Unit Reserve Shutdown Hours 0 ~~ 0 0
16. Gross Thermal Energy Generated (MWH) 2,015,669 5,337,014 37,063,034
17. Gross Electrical Energy Generated (MWH) 656,442 1,746,058 12,335,354
18. Net Electrical Energy Generated (MWH) 622,969 1,654,928 11,704,546
19. Unit Service Factor 99.1 93.7 72.0
20. Unit Availability Factor 99.1 93.7 72.0

, 21. Unit Capacity Factor (Using MDC Net) 94.1 86.1 65.4

22. Unit Capacity Factor (Using DER Net) 92.3 84.5 64.2
23. Unit Forced Outage Rate .9 6.3 18.3 l 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Scheduled Refueling, 4/1/83, 42 days i 25. If Shut Down At End Of Report Period, Estimated Date of Startup:

'26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved I. INITIAL CRITICALITY ,_

INITIAL ELECTRICITY COMMERCIAL OPERATION i

_.,,-._ _ - =- , _. ..m.- ..., , , , . . . _ . . , , _ _ , . . _ . ~ . ~ , _ . . , . . . . _ . . , _ _, - _ . _ . - - . _ . _ , _ . _ _ , ~ . . ~ ,_.__;._,__.- -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 DATE 04-05-83 REPORT MONTH March COMPLETED,BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting "*"' Code Action to Down Reactor3 Report # *4 5 Prevent Recurrence 83-05 830227 F 6.7 A 3 NA NA NA Repairs made to Main Feedwater Regulating valves and unit returned to service.

I 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) Fi)e D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339

. UNIT NA-2 DATE 04-01-83 COMPLETED BY G. Schmitendor TELEPHONE 703-894-5151X2117 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net) (NWe-Net) 1 139 17 862 2 823 18 864 3 863 19 858 4 864 20 866 5 858 21 866 6 859 22 863 7 859 23 863 8 861 24 863 9 858 25 863 10 862 26 857 11 860 27 563 12 861 28 863 13 864 29 862 14 864 30 862 l 15 864 31 861 1

16 864 INSTRUCTIONS i On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH March UNIT NAME NA-2

- YEAR 1983 DATE 04-05-83 COMPLETED BY G. D. Schmitendorf 83-05 (A) (3) At 0639 on 1 March, 1983 the unit was returned to on-line following completion of the necessary repairs to the "B" Main Feedwater Regulating valve along with making repairs to the "A" and "C" Main Feedwater Regulating valves to prevent occurrence of the air line shearing encountered on the "B" valve. No further problems were experienced and the unit was stable at 100% power at 0451 on 2 March, 1983.

VIItOINIA ELucruic AND l'OWElf CO)1PANY H rcit MoNI), VI NGINIA 2 3 2 61 W.L.STEWAMT wcN's".. o',"1"r$, Apri1 14, 1983 Mr. N. M. Haller, Director Serial No. 239 Office of Management and Program Analysis N0/JHL:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-338 Washington, D. C. 20555 50-339 License Nos. NPF-4 NPF-7

Dear Mr. Haller:

Enclosed is the Monthly Operating Report for North Anna Power Station Unit Nos. I and 2 for the month of March, 1983.

Very truly yours, m

. s W. L. Stewart Enclosure (3 copies) cc: Mr. R. C. DeYoung, Director (12 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)

Regional Administrator Region II

//