Deficiency Rept Rdc 45(82) Re Location of Governor Lube Oil Cooler/Standby Diesel Generator.Tubing Relocation in Progress.Work Expected to Be Completed by 840629 for Unit 1 & 840901 for Unit 2
ML20084K180
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/30/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-45(82), NUDOCS 8405110134
Download: ML20084K180 (1)


Text

F, O. box 5000 - CLEVELAND, OH UARE

< ~

,L t,

t'

, f F.

Serving The Best Location in the Nation MURR'4Y R. EDELMAN VICE PRESIDENT

~

~-'7

_~~'___!

NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement

-]

m

-- l U.S. Nuclear Regulatory Commission 799 Roosevelt Poad 1_

b Glen Ellyn, 1.111nois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Location of Governor Lube Oil Cooler / Standby Diesel Generator

[RDC 45(82)]

Dear Mr. Keppler:

Our letter to you dated January 25, 1984, indicated that Governor Lube Oil Cooler relocation was complete for both units and associated tubing rework was expected to be finished by April 30, 1984.

Tubing relocation is currently in progress on the Unit 1 engines. Work is now anticipated to be complete by June 29, 1984, for Unit 1 and September 1, 1984, for Unit 2.

Sincerely, f$

Murray R. Edelman Vice President Nuclear Group MRE:pab cc:

Mr. M. L. Gildner NRC Site Office Director

~

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Qh y]

di b

h 8405110134 840430 PDR ADOCK 05000440

\\M h

l S

PDR fg