ML20084K137
| ML20084K137 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 08/31/1974 |
| From: | Kalivianakis N COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084K129 | List: |
| References | |
| NJK-74-255, NUDOCS 8305190166 | |
| Download: ML20084K137 (1) | |
Text
,
l l
4hr pV ound Staton.
Post Offic 218e.
Cordows;tilinoisO24r Telephone 309/85461i mix /-74-255 Telecopyr, Ragion.111 Attentione :Mr. C....Eeierabendr Auguet. 31,,1974.
Em KepPler; Region'sl' Ditectop' Directorate oft Regulatory-Operati' ns.-
o Regiost lll' U?. Sa. Atenni'c: Energy-Conunission-7992 Roosevelt-Road-Gletr Ellyn, Illinois 60137~
Reference Qued-Cities. Ncclear' Poster-Station.., Unit 2~
Docket No4 50-265,, DPR-30'-
Appendix:A,. Sections: 1.0. A.2,.3.7..A.3.a.,
6 *6.B ; 1.a,
Dear Mr. Keppler -
The. purposes of this-letter ist to: provide you-with..nettificatior_.of aG, Abnormal Occurrence
- as. required:.by-Techrtical Specification 6.6 R.l.C withint.24-hours of the occurrenee.
Witile perforsnistar.. quarterly surveillance tents: ow the Unit 2 Torus-Reacton Building vaccuum breaker valves,. AO-2-1601-20A..woulde not.
operate from. the. control roce..
Ther Unit was inttha process. of-starting;up: following-a scrara,. and/ control' rod withdrawal was-termina.ted.
Maintenenes found: a. defective pilot solenoid-'valvew and: it was. replaced.
The 2'1601-20A. valve-was then operated.
successfully" frota the control roces.
This: occurrence was discussed-by-telephone _ withiMr.. Feierabend of your - office on August-31,. 19741 Further-informationr.Will be provided:by' Abnorinal occurrence Report AO-50'265/74-21 which will be. submittedr witnirt 10t dayer.of the date of this-occurrenee.
Verg-truly yours, COMMONMEAIEYr. EDISON COMPANY QUAD-CITIES NUCTEAR. POWE -. STATION fY
/
N;.J KaliVianakis.
station.. Superintendant N3R/IPG-/lp a cc:
Directorate of Licensing:
J.
S. Abel
?
Cd 8305190166 740910 PDR ADOCK 05000265 S
pop SEP 3 3974 o
o m_mn