50-254 Commonwealth Edison Company Q U A D.CITIE S N U C L E A R POWER STAttOH Address Reply to:
POST CfflCE BOX 216
- CORDOVA, ILUNOIS 61242 S'
.',[ t 's g M ','s.
FAP-72-86
,y
,i..,
t f:.
/ip'p?gl9),~_ f i.,
't v
a
'/ i~ '
i. ';
. ~..
. April 19, 1972 s.
~ \\[.
p..
,\\ k, e y'
Dr. Peter.A. Morris, Director U. S. Atomic Energy Commission k.Q!'h. s, '
Division of Reactor Licensing
.M Washington, D.
C.
20545 License DPR Quad-Cities nuclear
Reference:
Power Station Unit 1 - Section 6.6.A.3 6.6.B.3
Dear Mr. Morris:
This is to report a condition relating to test operation of the Reactor Core Isolation Cooling System on Quad-Cities Muclear Power Station Unit 1.during start up testinr.
The Recctor Core Isolntion Coolinr Sy'-tem failed to perform its intended function at a reactor pressure of 950 psic.
This incident 1-72-5 is reported as an abnormal occurrence.
Incident Descrintion 'and Immediate Action - At 4:30 p.m.
on April ll, 19 7 2, St artup Tes t lio, 14 on the Reactor Core Isolation Coolinr System was being performed at rated reactor pressure.
The "RCIC" sys' tem failed to deliver
. 400 gnn in less than or ecual to 30 seconds.
The system was declared inonerable and the HiFh Pressure Coolant Inj e ction System was satinf actorily teste d imic.cdiatelv and daily aa recuired by the Technical Specification, Seet$en 3 5.E.2.
- ij f ~
Inventication and Corrective Acticn - Investigation revealed
/
th at the electrical to hydraulic transducer was not f un c tion--
I ing' properly.
This unit is called the EGR ACTUATOR in the Des cription Manual GEK-9597 - Page 27-16.
The response was slow and believed to be due to shorted turns on a magnetic amplifier.
A new EGR unit was obtained, tested, and RCIC was declared operable on April 18, 1972.
l 8305190101 720419 PDR ADOCK 05000954 nnno s
(,( A sso
/
COPY SEKr REGION _ b i
(
o Dr. Peter A. fiorris April 19,1972 Conclusion - The Reactor Core Isolation Cooling System was tested in accordance with the Quad-Cities !!uclear Power Station Startup Test' Instructions and was found deficient.
The cause of the incident 'f as a defective EGR unit which was replaced, tested, and the system was declared operable.
Very truly yours, COW"0!!'dEALTH EDISO'! COMPA!IY Quad-Cities flucicar Power Station
,y
=7 ;' h$.,'
?.4. Palmer Superintendent FAP/zm I