Ao:On 730306,hydrogen Explosion Caused Pressurization of Offgas Pipe Which Broke Rupture Disc in Air Ejector Room, Releasing Radioactivity Through Turbine Bldg Ventilation Sys.Cause Under Investigation.Filter Replaced
ML20084J237
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/16/1973
From: Stephenson B
COMMONWEALTH EDISON CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
BBS-73-44, NUDOCS 8305120263
Download: ML20084J237 (6)


Text

_____ _ _ _

l.

Com we:lth Edison

(")

{

Ourd as Nucl:ar Power Station v

r Post Olnce Box 216 Cordova, ll!inois 61242 Telephone 309/654 2241 gtCEl'/E0 5

.g C 'iC b"" \\ 0 BBS-73-44 U 3',ur;c ("W:Y JG gig r.

g' 3 QcUGH March 16, 1973 I

Mr. Angelo Giambusso Deputy Director for Reactor Projects Directorate of Licensing U. S. Atomic Energy Commission Washington, D. C. 20545

\\

Re ference :

Quad-Cities Nuclear Power Station, Unit 2 Docket No. 50-265; License DPR-30 Appendix'{ A, Section 1.0. A.3 and 1.0. A.5

Dear Mr. Giambusso:

The purpose of this letter is to inform you of a hydrogen explosion which occurred in the Unit 2 off gas hold up volume on March 6,1973 at about 9:25 PM.

The pres-surization of the off gas pipe broke the rupture disc in the 2B Air Ejector Room and resulted in an unplanned release of radioactivity through the turbine building ventilation system.

The release was determined to be well within the Technical Specification limits for gaseous and particulate effluents.

This abnormal occurrence was reported to Region III Compliance on March 7,1973 Description of Incident At 9: 24 PM on March 6,1973 OCB 2-6 in the 345 KV switch-yard tripped.

The cause of the trip was not immediately apparent, however, it war, believed to be the result of lightning from a storm in the area.

At approximately the same time the Unit 2 Control Room Operator noticed that the air ejector discharge flow recorder was oscillating in an erratic manner.

A power reduction was initiated and then stopped when the flow indication stablized af ter one minute.

At approximately 9:26 PM several Area Radiation Monitors in the turbine building began alarming in the control room k,W Q

8305120263 730316 PDR ADDCK 0500026S S

PDR 1857

G Mr. A. Ciambusso March 16,1973 and the Standby Gas Treatment System started automati-cally when its 2 mr/hr setpoint was exceeded.

The highest radiation appeared to be in the area of the air ejector rooms and ventilation exhaust f ans.

The radiati6n protection man on shift checked the Continuous Air Monitor which samples the Turbine Building exhaust air and saw that it was increasing.

At 9:40 PM the Shift Engineer received this report and ordered the evacuation of all personnel from the Turbine Building and the Radwaste Building.

As control room alarms were being investigated during this period, the operator observed that the off gas radiation monitors were de-creasing.

These monitors are located adjacent to the hold up pipe just outside the building.

Combined with the other indications the shift engineer was relatively certain that the off gas rupture disc had blown.

At approximately 9:50 PM the shift foreman and several operators entered the Turbine Building dressed in pro-tective clothing and full face masks.

An inspection of the 2B air ejector room confirmed that the rupture disc had in fact blown and at 10:00 PM the operators began placing the 2A air ejector in service and isolating the 2B ejector.

The change over was completed by about 10:05 PM and the turbine building radiation monitors began decreasing.

During the incident the chimney sample system monitor had increased by a factor of six and then returned to its original reading within ten minutes after the 2B air ejector was isolated.

The area outside the building was surveyed and no abnormal radiation levels or evidence of damage were detected that would indicate a failure of the hold up pipe.

Investigation On March 7,1973 samples were obtained before and after the off gas high efficiency filters and analyzed for particulate filtration and a DOP test was then conducted for confirmation of the filter efficiency.

These tests indicated 100% penetration or zero efficiency on both filters.

Chimney particulate samples pulled on the 7th were also counted at this time before the normal 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and 7 day decay periods had elapsed.

From these' samples it was determined that the concentration of particulate isotopes with half lives greater than 8 days would continue to be a small fraction of the Technical Speci-fication limit.

'\\

~

,r - -- k I

I

'Mr. A. Giambusso March 16,1973 i

/'though each filter is designed for 100% capacity, station valve lineups allowed ei.ther one or two filter At the time of the incident both filters were in ser-operation vice.

When the filters were removed, they were found to be charred and the upper support beams were deformed indicating that there definitely had been an explosive recombination of hydrogen and oxygen in the off gas line.

Some of the filter media had melted and was removed i

from the bottom of the filter vessel.

In order to verify that the filter material had been retained in the vessel, one of the damaged filters was weighed and found to be essentially the same (less than one pound difference) as that of a new filter.

of the material removed from the bottom of the vesselThe weight could not be determined since it was a mixture of the filter material and other substances such as dust, rust, etc.

It was therefore concluded that very little, if any, of the filter media had escaped the vessel.

that it could have been carried over to and up the 310 It foot chimney.

As a result of this incident it was discovered that failed filter element retainers had not been installed the in the Quad-Cities off gas filters during construction.

j After both filters had been replaced and DOP tested satis fact orily, the filter retainer baskets were found in the site warehouse along with spare parts from the construction period and other supplies.

Only two filters designed to hold the retainer were available at the site.

with one on UnitOne of the new Unit 2 filters was removed along 1 and the, modified filter retainer assemblies installed.

filter in service and the other filter valved out asEach unit will operate

{

a spare until more of the new design filters can be ob-i tained.

the remaining two filters.At that time the retainers will be installed in

)

[

.i The off gas system design incorporates temperature and 9

pressure switches to detect an explosion in the hold up pipe.

These switches alarm and automatically close the air ejector suction valves to stop the flow of com-bustible gas into the pipe.

During the incident the operator noticed the high temperature alarm, but could a

9 9

. March 16, 1973 Mr. A. Giambusso l

\\

not positively recall seeing the high pressure alarm.

He also did not observe any isolation of the off gas I

In the course of the investigation, all switches line.

were test, d by instrument mechanics and found to be e

functioning properly.

Since this isolation is designed only to prevent feeding any combustion taking place in Therefore, it can only the pipe, it does not seal-in.

and the valves be concluded that an isolation did start returned to their full open position immediately fol-lowing the explosion and that this was not detected by the operator.

The contamination and radiation levels throughout the turbine building were caused by the direct discharge of The off gas from the air ejectors into the building.

rapid rate at which the contamination was spread through-out the building was not due to a failure of the vent-ilation system design which vents the air from the air ejector rooms directly to the building exhaust fans.

At the time of the occurrence the 2A fan had been re-moved for maintenance and an opening existed on the discharge side allowing some of the flow from the op-This erating fans to return directly to the building.

was considered to be the major source of radiation inside the building.

In addition some gases probably entered the radwaste building basement from the off gas line drains.

These lines have loop seals which were more than likely olown clear by the explosion, however, the water formed by the recombination would have refilled the seals.

. Additional Conclusions and Corrective Action Although the exact cause of the detonation has not yet been positively identifie,d, it is believed to have been the result of lightning in the vicinity of the station.

The Commonwealth Edison Company Station Electrical Engineering Department is still investigating the in-They cident in order to determine the specific cause.

are :also reviewing the adequacy of the station grounding and lightning protection systems.

The off gas pipe and filter vessel are designed to with-No stand the force of an explosion of this nature.

physical evidence or signs of ' leakage have-been' detected; therefore, it can be concluded that the system satisfactorily meets this design requirement.

J

C

(

)

<U Mr. A. Giambusso March 16, 1973 1

The Station Review Board has reviewed all aspects of this incide'nt including the immediate actions taken by operating personnel.

We have concluded that their actions were.prudont and that should a similar situation occur in the fu'ure, the reactor should be maintained at a steady power level once the integrity of the off gas pipe has been verified.

In our opinion to immediately scram the reactor would disturb the equilibrium release rate and result in releasing long lived fission products unnecessarily.

We are in the process of writing an operating procedure which will provide guidance along these lines to operating personnel.

During the period following the incident and prior to the filter replacement, Unit 2 operated with essentially no filtration of off gas particulates.

This condition was reviewed and based on the extremely low particulate activity of the March 7th sample no power reduction was deemed necessary.

Although particulate levels increased, the margin between the actual release rate and the naximum allowable release rate for iodine-131 and parti-culates with half lives longer than 8 days was not significantly affected since iodine-131 was still the controlling factor.

This decision was further justified by the sample removed on March 8,1973.

This sample 3'

represented 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of operation without the Unit 2 filters and was found to be less than 1" of the Technical Specification limit.

Proper radiation protection procedures were observed by j

the operating personnel who entered the turbine building.

This resulted in no one being contaminated to any significant extent.

The personnel involved were also subjected to a whole body count following the incident; the results of which were negative.

a A review of the chimney sample system noble gas recorder revealed a spike at the time of the incident from approxi-mately 24,000 uc/see to about 175,000 uc/sec.

The duration of this spike was about 1 to 2 minutes and the h

magnitude less thar. one half the Technical Specification i

-limit.

The cause of the spike is attributed to the rapid

{

~cxpulsion of the noble gases and relatively short lived

]

gases such as N 3 from the hold up pipe by the pressuri-

)

1 zation.

Af ter the spike the release rate gradually l

L 1

-l o

Mr. A. Giambusso March 16, 1973

\\

returned to about the same level due to the direct path via the ventilation system instead of the holdup volume.

After about 30 minutes the release rate returned to normal when the air ejector was isolated.

Although the probability of any significant release y

of radioactivity is extremely remote, samples from the j

i environs monitoring stations were collected on March 13, 1973 These airborne particulate and iodine-131 samples are now being counted and the results should be available

?,

to the station by March 22, 1973 We do not expect these J

samples to indicate any increase above normal levels, 4

however, we shall keep you advised of any significant F

results.

Very truly yours,

COMIJONWEALTH EDISON COf@ANY QUAD-CITIES NUCLEA POWER STATION j

7

,/

/

n (f (fLfh

,y

'B. B. Step enson Superintendent RAN/BBS/1k cc:

Director of Compliance, Region III 1

Directorate of Regulatory, Operations j

i I

l l

l r

k i

i o}