Telecopy Ao:On 730406,while Returning Cleanup Demineralizer Sys to Svc,Increase in Water Conductivity & Offgas Activity Observed.Caused by Air Trapped in Cleanup Demineralizer
ML20084J184
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/06/1973
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084J178 List:
References
NUDOCS 8305120223
Download: ML20084J184 (1)


Text

_ __ _ - - - - _ _ - - - - - - - - - - - - - - - - - - - -

D*

q fE5 m5tz, O M3MCGBA CGO V M dij ea ifi g 2-2317$1 E096 04/06/73 tuestern union Lass s L4 5ma g ICS IPMBNGZ CSP , /--

  • 7[

3096542241 M3M TDBN CORDOVA IL 100 04-06 0617P EST ,y, heta

) ZIP 60137 - g ((-~~ g p-hI,l ,

D gs[ j 'O d31r. ( l:i?

I MR B G7EIR RE.i10N THREE COMPLI ANCE US ATOMIC ENERGY COMMISSION 799 ROOSEVELT g RD g 1LEN ELLYN IL 60137 9 e U e AT 1500 ON DATE 4-6-73 WHILE RETURNING THE CLEA NUP DEMINERALIZER O SYSTEM TO SERVICE AN INCREASE IN UNIT NUMBER ONE REACTOR WATER CONDUCTIVITY AND OFF GAS ACTIVITY WAS OBSERVED. FURTHER INVESTIGATIO g;

N REVEALED THE CUASE TO BE AIR TRAPPED IN THE CLEANUP DEMINERALIZER.

O THE REtCTC3 WATER CONDUCTIVITY EXCEEDED THE TECHNICAL SPECIFICATIONS gi LIMIT OF TEN MICR0 MHOS AND IN ACCORDANCE WITH SECTION 3.6.4 THE REACTOR WAS PLACED IN AN ORDERLY SHUT DOWN MODEREFERENCE O OUAD CITY NUCLEAR POWER STATION DOCKET NUMBER 50-254 DPR 29 g APPENDIX A SECTION 1.0.A.2 AND 3.6.4 i N K, LIVI A NAKIS l O e' 1819 . EST O MGMCGBA CG0 g O e O e o e O e O e Q ly 0 [dh.

v e

O e 9305120223 730418 '

n PDR ADOCK 05000254 S PDR e O Apa 3 g3 e