Preliminary AO-73-21:on 730908,several Hydraulic Shock & Sway Arrestors on Piping Sys in Drywell Failed.Caused by Inoperable Snubbers Due to Hydraulic Fluid Loss.Hydraulic Shock & Sway Arrestors Replaced
ML20084J079
Person / Time
Site: Oyster Creek
Issue date: 09/10/1973
From: Carroll J
JERSEY CENTRAL POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-73-21, NUDOCS 8305100033
Download: ML20084J079 (4)


Text

-

I.

O-o

g. c

,e f

Tot Jancs P. O'Rollly Directorato of Regulatory Operations Region I 631 Park Avenuo King of Prussia, Pennsylvania, 19406 From Jerscy Central Power & Light Company Oyster Czcek Nuc1 car Generating Station Docket 150-219 Forked River, New Jctsey 08731

Subject:

Abnornal Occurrence Report 73-21 Following is a preliminary report being submitted in compliance with the Technical Specifications paragraph G.6.2.

Preliminary Approyal:

0_- [, <!nfr#G.9/10/73

. T. Carroll, Jr. V 'Dato cc Mr. A. Giambusso e

/

~

i

(',

p

/,q}

I b

8305100033 730910 PDR ADOCK 05000219 PDR S

9 e

A

- ~

~

Dato: 9/10/73 Tine: 3:00 a.c.

\\_J

+

6 i

ABNOR!1\\L OCCURRENCE REPORT NO. 73-21

SUBJECT:

Failure of 21 liydraulic Shock and Sway Arrestors on piping systems in the Drywell, including units on both Core Spray and both Isolation Condenser loops.

O This event is considered to be an abnormal occurrence as defined in the Technical Specifications, paragraph 1.15.D.

Notification of this event as required by the Technical Specifications, para-t i

graph 6.6.2.a, was made to AEC Regipn I, Directorate of Regulatory l

l I

Operations, by telephone on Monday, September 10, 1973, at 12:45 p.m., and personally to Mr. E. Greeman on bbnday, September 10, 1973.

SITUATION:

The p1 ant was shutdown on September 8,1973 for the purpose of inspecting the llydraulic Shock and Sway Arrestors located on piping systens throughout the Drywell.

l CAUSE:

The snubbers were made inoperable due to a loss of hydraulic fluid.

REMEDIAL ACTION:

The failed Ilydrauli'c Shock and Sway Arrestors were replaced using snubbers ' rebuilt with seal kits supplied by the Bergen Paterson Pipe Support Company.

The new seals are of'a different type, which according to Bergen Paterson, will provide a longer seal life.

6

x O

Abnomal Occurrence Esport No. 73-21 Srptonber 10, 1973-o SAFE'IY ' SIGNI FI CANCE :

The loss of snubber operability resulted in a reduction in the ability of the plant to safely survive a design bases carthquake.

'Ihc failures were such that they affected both Core Spray and both Emergency Condenser Systems, f

e 0

0 e

e a 4 e

e O

O e

0 6

m 9

e

).

4

~ y e

~

g O.,o/,I/

O t.Me-Date:

9/10/73 Prepared by: [-

/

h

MEMO ROUTE SLIP e.. Mc-,,<%. sin u.swiansi<gn 5:2 => a mi th'..

r.< c.au,,:ac2 r o, tcii.

,,ar,,a4,,,,,a r

,,3,..,,,

r, ia,1,m., ion.

io et m2.ncuan; imiiAt.

traux 5 Licensce:

Jersey Centr E Pow *r & Light Comp;ny H. D. Thornburg, cArc Docket No.:

50-219 Chief, FS&EB Abnomal Occurrence:

AO 73-21 TO (Name and unst)

I"8 fl AA 5 R i u a R,.5 RO:HQ (5)

DR Central Files (1)

The attached report from the subject licensee is DATE Regulatory Standards

3)

Dir. of Licensing (13 forwarded in accordance with RO Manual Chanter 1000 i

1O (NI,ne and unit)/

IMllAL$

StMARKS R0 Files v The action taken by the licensee is considered J. Tillou, RO:I oATE appropriate.

Followup will be performed during the next inspection as appropriate.

Copies of r pea e4.m ana ua )

atwAR=s i

the report have been forwarded to the PDR, Local D, L. Caphton, Senior PDR, NSIC, DTIE and State representatives. The Rractor Inspector, BWR Section licensee will submit a 10 day writteti report to FHDN E.04 CATE 9/18/73 Licensing.

USE OTHLR $IDE FOR ADDITION AL REMARKS CPO 19110 - 445-4(9

.S' o

(

I

~ I it.

ija 1

. 7,7 L 5;.

t

, e n

Og'*

ss I$

he e

e

&