ML20084H912

From kanterella
Jump to navigation Jump to search
Telecopy AO BFAO-7416T:on 740312,HPCI Turbine Failed to Reach Rated Speed During Manual Initiation Test. Investigation Underway to Determine Cause
ML20084H912
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/13/1974
From: Green H
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20084H906 List:
References
AO-BFAO-7416T, NUDOCS 8305060143
Download: ML20084H912 (1)


Text

_

! Qg"2?ci!qG3pMQg@qq@q@qpyyjits E9 sed 64 6 ;

c3 W A %" W N

o q

+.t g

L2 TBBl36(1307)(2-016456E072)PD 03/13/74 1307 cd W O

ICS IPt1DNGZ CSP D

2057298316 TDBN ATHENS AL 50 03-13 0107P EDT FON 4045264503 US AUTOMIC ENERGY COMMISSION, FONE AND MAIL D

REGION II DIRECT 0RETTE OF REGULATORY OPERATIONS 230 PEACH TREE ST NORTHWEST D

1 ATL A NT A CA 30303 SUBJECT BFA0-7416T ON MARCH 12 1974 THE HPCI TURBINE FAILED 3

TO REACH RATED SPEED DURING A MANUAL INITIATION TEST THE TEST VAS BEING MADE TO RESOLVE SOME QUESTIONS CONCERNING OPERABILITY

)

DURING THE LOAD REJECTION TEST CONDUCTED ON MARCN 11 1974 INVESTIGATI ON IS UNDERWAY TO DETERMINE THE CAUSE OF FAILURE D

H J GREEN BROWNSFERRY NUCLEAR PLANT g

NNUN O

w.mm O

! [

6 4

s

(

~.

J

[

"o 4

.meo-

~o-m.

t.

00PY SDIT TO:' R

! I

~.

~

L?cR /

D d

NSIC 1

TIC'~

.\\

t j

esoso60t43 74o912 VJ PDR ADOCK 0500025 4

S

.