Forwards Emergency Operating Procedures Generation Package, Rev 0 to Draft Procedure 1450.00, Emergency Procedure... & Rev 11 to Procedure 1005.01, Preparation..., Per Suppl 1 of NUREG-0737,Generic Ltr 82-33 & SER Confirmatory Issue 41
ML20084G926
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/01/1984
From: Herborn D
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20084G928 List:
References
RTR-NUREG-0737, RTR-NUREG-0853, RTR-NUREG-737, RTR-NUREG-853, TASK-1.C.1, TASK-1.C.7, TASK-1.C.8, TASK-TM 0210.6-L, 054-84(5-1)-L, 210.6-L, 54-84(5-1)-L, GL-82-33, U-0708, U-708, NUDOCS 8405070396
Download: ML20084G926 (2)


Text

~ j U- 0708 0210.6-L 054-84 ( 5.-1)-L ILLIN0/S POWER 00MPANY CLINTON PCnER STATION, P.o. BOX 678. CLINTON. ILLINOIS 61727 May 1, 1984 Docket No. 50-461 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief j Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Clinton Power Station Unit 1 Emergency Operating Procedures Generation Package ]

Generic Letter 82-33 and SER Confirmatory Issue #41,

(

NUREG-0853

Dear Mr. Schwencer:

In letter U-0647, dated July 5, 1983, Illinois Power sent to the NRC our schedule for activities associated with the Emergency Response Capability Implementation Plan that will satisfy the requirements of Generic Letter 82-33. The purpose of this letter is to submit our Emergency Operating Procedures Generation Package. The Clinton package satisfies the documentation needs outlined in Supplement I to NUREG-0737 and consists of the following attachments:

Draft CPS Procedure No. 1450.00, Rev. 0--CPS Emergency Procedure Guidelines CPS Procedure No. 1005.01, Rev. 11--Preparation, Review, and Approval of Station Procedures and Documents Draft Clinton Power Station Emergency Offnormal Procedures Verification and Validation Program Description of the Clinton Power Operator Training Program The CPS Emergency Procedure Guidelines (EPGs) have been prepared from generic ones developed by a BWR Owner's Group (BWROG). To facilitate your review of the Clinton Emergency Operating Procedures Generation Package, we are enclosing Revision 3J of the generic EPGs. The BWROG is still reviewing this material and is making revisions to accommodate a Combustible Gas Control Guideline. It is anticipated that the BWROG will submit Revision 4 of the generic EPGs to the NRC in the fall of 1984. Revisions to the CPS EPGs will be made as new generic information becomes available.

8405070396 840501 [

PDR ADOCK 05000461 PDR p

l

v

, g ,,

U-0708 0210.6-L 054-84(5-1)-L~

SER Confirmatory Issue #41 is associated with development of Emergency Operating Procedures that comply with TMI Action Plan Items I.C.1, I.C.7, and I.C.8. The Clinton Emergency Operating Procedures Generation-Package material establishes compliance with Item I.C.1.

Please contact us if you have any questions on the information provided in this submittal.

Sincerely yours,,

Daniel I. Herborn Director - Nuclear Licensing and Configuration Nuclear Station Engineering DIH/j gh Attachments cc: G. A. Harrison, NRC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety 1.