Corrected Page to Monthly Operating Rept for Feb 1984
ML20084E262
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/29/1984
From: Jun Lee
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20084E258 List:
References
NUDOCS 8405020209
Download: ML20084E262 (1)


Text

/',

L.

OPERATING DATA REPORT DOCKET NO. 50-339 DATE 03-04-84 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 '

OPERATING STATUS Notes.A This page re-submitted

1. Unit Name: North Anna 2
2. Reporting Period: do to error in calculation February 1984
3. Lice'nsed Thermal Power (MWt): 2775 in cumulative figures.
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907 '
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If- Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This M.onth Yr.-to-Date Cumulative 1 1 '. Hours In Reporting Period 696 1,440 28,152
12. Number of Hours Reactor Was Critical 621.7 1,365.7 21,012.6
13. Reactor Reserve Shutdown Hours 3.5 3.5 3,783.5
14. Hours Generator On-Line 584.5 1,328.5 20,835.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,474,396 3,431,253 53,847,294
17. Gross Electrical Energy Generated (MWH) 483,285 1,123,980 17,838,347
18. Net Electrical Energy Generated (MWH) 457,966 1,065,901 16,917,983
19. Unit Service Factor 84.0 92.3 74.0
20. Unit Availability Factor 84.0 92.3 74.0
21. Unit Capacity Factor (Using MDC Net) 73.9 83.2 67.6
22. Unit Capacity Factor (Using DER Net) 72.5 81.6 66.3
23. Unit Forced Outage Rate 6.2 6.2
  • 14.5 __
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Scheduled Maintenance 03-30-84 Unit 2 Refueling Outage 09-21-84

25. If Shut Down At End Of Report Period, Estimated Date of Startup:  ;
26. Units In Test Status (Prior to' Commercial Operation): l Forecast Achieved '

INITIAL CRITICALITY INITIAL ELECTRICITY -

COMMERCIAL OPERATION .

8405020209 840416 PDR ADOCK 05000338 -

R POWt ,