ML20084E257

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept,Mar 1984, & Corrected Page to Unit 2 Monthly Operating Rept for Feb 1984
ML20084E257
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/16/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20084E258 List:
References
222, NUDOCS 8405020206
Download: ML20084E257 (1)


Text

_ _______.

O VIItOINIA 15LI!CTIlIC AN1) Powlin COSU'ANY lt ICIDI O N I), VI HG INI A 213 2 G I l

W. I.. MTH Wale 7 Var. Puames,mor x u ci.... o,...,,,, m Apri1 16, 1984 l

l Mr. N. M. Haller, Director Serial No. 222 l

Office of Management and Program Analysis N0/JHL:acm l

U. S. Nuclear Regulatory Commission Docket Nos. 50-338 Washington, D. C. 20555 50-139 License Nos. NPF-4 NPF-7 l

Dear Mr. Italler:

i I

Enclosed is the Monthly Operating Report for North Anna Power Station Unit i

Nos. I and 2 for the month of March, 1984. Also included is a corrected page from the North Anna Unit No. 2 Monthly Operating Report from February, 1984.

Very truly yours,

-4%

is W. L. Stewart Enclosure (3 copies) cc:

Mr. R. C. DeYoung, Director (12 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)

Regional Administrator l

Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station 8405020206 840416 PDR ADOCK 05000338 S.Q R

PDR 4