Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20042E5841990-04-12012 April 1990 Urges Commission to Consider Citizens for Fair Util Regulation Request to Delay Full Power Licensing of Plant Until Issue Raised by Residents Can Be Further Investigated & Resolved.Related Correspondence ML20012D2101990-02-26026 February 1990 Expresses Concerns Re SALP Process & NRC Decision to Issue SALP Rept W/O Adequate Consideration of Negative Findings ML20006B6471990-01-25025 January 1990 Forwards 900124 Ltr to Util Re Licensee 900122 Response to Case 900110 Ltr & Advises That Ltr self-explanatory & Contains Info Needed to Resolve Matters Raised in Case 900110 Ltr from Bp Garde to Recipient ML20005G6931990-01-10010 January 1990 Forwards Corrected 900109 Ltr Re Analytical Evaluation of Station Svc Water Sys by Case Consultant J Doyle ML19354D7651990-01-10010 January 1990 Forwards Revised Pages to Analytical Evaluation of Station Svc Water Sys for Comanche Peak & Requests That Previously Sent Pages ES-32 & ES-33 Be Replaced W/Revised ES-32 & ES-33 & Pages 208 & 209 W/Revised Pages 208,209 & 210 ML19332C6211989-10-20020 October 1989 FOIA Request for Documents Re Down Grading of Severity Level III Violation at Plant in Insp Rept 50-445/88-47 & 50-445/88-42 & Hs Phillips June 1989 Memo to NRC ML20248J3561989-10-15015 October 1989 Request for Stay Filed by Citizens for Fair Util Regulation CLI-88-12.* Forwards Stay for Filing ML19332E3191989-10-12012 October 1989 Requests Opportunity to Make Brief Presentation Re Plant at Commission Informational Meeting on 891019 in Rockville,Md, Per 891011 Telcon W/B Hill.Dallas Morning News 890612 Article Encl ML19332F8181989-10-10010 October 1989 Requests Appearance Before Commission 891019 Briefing to Address Concerns Re Pending NRC Decision on Plant Licensing. Request for Stay of Fuel Load & Low Power Testing Until Appellate Review Complete,Being Forwarded Separately ML19327A9161989-09-0808 September 1989 FOIA Request for Ofc of Investigations Rept Re Testing of Fasteners Installed at Facility ML20247B5241989-07-14014 July 1989 Forwards Certificate of Svc as Replacement for Certificate Signed on 890713 by M Lyons & Signature Page to Replace Original.W/Certificate of Svc ML20246A6581989-06-28028 June 1989 Requests Verification of Evacuation Time Estimates as Stated in 1987 Nuclear Power Safety Rept for Plant by 890717 ML20236D7961989-03-13013 March 1989 Submits First Formal Request for NRC Action Re Unit 1 1982 RCS Primary Cold Hydrostatic Test,Per 880630 Joint Stipulation Among Case,Util & Nrc.Documented Request for Action Encl ML20236C5001989-03-13013 March 1989 Forwards Technical Evaluation of Comanche Peak Steam Electric Station 1982 Hydro Test & ASME Section XI VT-2 Test ML20196F7431988-11-11011 November 1988 Responds to 881007 Correspondence from NUMARC to NRC Re Beliefs & Interpretation of Plant Settlement.Numarc Attempts to Influence Commission Inappropriate.Served on 881201 ML20154G7291988-09-12012 September 1988 Forwards Citizens for Fair Util Regulation First Suppl to 880811 Request for Hearing & Petition for Leave to Intervene ML20206H4821988-09-0909 September 1988 FOIA Request for Documents in Connection W/Insp Repts 50-445/88-51 & 50-446/88-47 Between 880707-0802 ML20205E9471988-08-22022 August 1988 FOIA Request for Documents Re NRC 880707-0802 Insp of Activities Authorized by NRC CPs CPPR-126 & CPPR-127 ML20207E5641988-08-12012 August 1988 Forwards Corrected Page 6 to 880811 Petition for Hearing & Petition for Leave to Intervene ML20207E5151988-08-11011 August 1988 Forwards Request for Hearing & Petition for Leave to Intervene by Citizens for Fair Util Regulation ML20244D9801988-07-0808 July 1988 Clarifies Position Re Notices of Intent to File Motion for Intervention & Substitution of Parties,Motion to Proceed as J Doe & Motion to Make Public Any Settlement Agreements Enacted by Parties in above-styled Case ML20150D5031988-07-0808 July 1988 Forwards Motions to Intervene & for Sua Sponte Filed on Behalf of Citizens for Fair Util Regulation & Individual Residents ML20150D5091988-07-0707 July 1988 Forwards Substitute Pleadings of Petitioner J Doe ML20196G8441988-06-29029 June 1988 Expresses Opposition to Licensee Request for Extension of CP Completion Date for Unit.Three CP Application Dockets Urged to Be Consolidated for All Matters Since Underlying Issue Identical to All ML20206E7601988-06-0909 June 1988 FOIA Request for Documents Generated by NRC Re Findings of Comanche Peak Rept Review Group (CPRRG/NUREG-1257) ML20154H6491988-05-21021 May 1988 Requests to Be Advised of Projected Schedule for Issuance of Sser Re Each Remaining Project Status Repts,Including Collective Evaluation Rept & Collective Significance Rept. Related Correspondence ML20154H7561988-05-17017 May 1988 Forwards Pf Mckee on Technical Concerns Re Pipe Support Design Issues ML20154F0061988-05-11011 May 1988 Forwards Listed Documents,Per Roisman ,Including Technical Analysis Corp QA Program at Comanche Peak Steam Electric Station & Southern Engineering Rept on Rural Electric Cooperatives. W/Svc List.Related Correspondence ML20154E4821988-05-0606 May 1988 Advises That Listed Documents Received Per Agreement Reached W/Minority Owners Re Discovery in Proceeding.Summary & Conclusions of Technical Analysis Corp Document Encl.Related Correspondence ML20206C1651988-04-21021 April 1988 Forwards Notarized & Signed Authorization Granting MD Kohn Access to Any & All Documents Re Request ML20151P0461988-04-15015 April 1988 Forwards Initial Complaint of J Goese & Amended Complaint of R Radelich in Order to Keep Board Informed of Potentially Significant Info Re Proceedings.Questions Raised Re How Applicant Reinsp Program Being Implemented ML20206C1591988-02-29029 February 1988 FOIA Request for Documents Re Correspondence Between Util & NRC Regarding Use of Incorrect Stiffness Values for Class I Stress Analysis Performed by Westinghouse,Allegations & Improper or Unethical Conduct ML20148J7511988-01-0505 January 1988 FOIA Request for Documents Re 871231 Insp Repts 50-445/87-27 & 50-446/87-20 & Notice of Violation ML20147A7281987-12-10010 December 1987 Appeals Denial of FOIA Request for Documents Re Rf Warnick to Wg Counsil Forwarding Insp Repts 50-445/87-11 & 50-446/87-09 on 870605-0707 ML20237B6531987-12-0909 December 1987 Advises That Proposed Procedure in Does Not Solve Problem of Accessing Documents.Nothing in Ltr Obviates Need for Continuing W/Foia Requests.Related Correspondence ML20196F6651987-12-0808 December 1987 FOIA Request for Documents Re Insp Repts 50-445/87-23 & 50-446/87-17.Info Required as Part of Ongoing Monitoring Project ML20236P8811987-11-0909 November 1987 Submits Case Comments on ASLB 871103 Scheduling Order. Time Frames Less than in NRC Regulations Would Be Great Injustice & Applicants Should Produce Documents in Timely Manner ML20236V6331987-11-0606 November 1987 Appeals Denial of FOIA Request for Documents Re V Stello 870121 Memo Establishing Comanche Peak Rept Review Group, Notes of Stello Meeting W/Involved Individuals & region-wide Training Program & Guidance Plan ML20236V5851987-11-0606 November 1987 Appeals Denial of FOIA Request for Documents Re Stello 870121 Memo Establishing Comanche Peak Rept Review Group, Notes of Stello Meeting W/Involved Individuals & region-wide Training Program & Guidance Plan ML20236C2791987-10-19019 October 1987 Forwards Potential 10CFR50.55(e) Items Case Has Received Since Info Initially Provided to Board on 871001 to Keep Board up-to-date on Matters of Potential Significance. Related Correspondence ML20236L7211987-10-0707 October 1987 FOIA Request for Records on Summary of 870902-04 Audit Re Implementation of Piping Generic Technical Issue Resolutions ML20235R4561987-10-0101 October 1987 Potential 10CFR50.55(e) Items.* Forwards Significant Deficiency Analysis Repts Received Since 870814.Related Correspondence ML20235R4691987-09-28028 September 1987 Fowards Case Answer to Applicants 870820 Motion for Establishment of Schedule ML20147A9131987-09-16016 September 1987 FOIA Request for All Agency Records & Info in Connection W/Rf Warnick to Wg Counsil Forwarding Insp Repts 50-445/87-11 & 50-446/87-09 on 870605-0707 ML20238E5051987-09-0909 September 1987 Forwards Intervenors Response to Util Motion to Quash Discovery Request.Ref Attachment Will Be Sent Under Separate Cover.Exhibit Is Informational Only ML20236D8601987-09-0303 September 1987 FOIA Request for Documents in Connection W/Jg Keppler to Wg Counsil Re Withdrawal of Violation ML20235E8381987-09-0101 September 1987 FOIA Request for Records Re C Grimes to ASLB Concerning Ofc of Inspector & Auditor Rept of Investigation 86-10 ML20245C4191987-09-0101 September 1987 FOIA Request for Documents Generated in Connection W/Stello 870121 Memo Establishing Comanche Peak Rept Review Group, Notes of Stello Meeting W/Involved Individuals & region-wide Training Program & Guidance Plan ML20238E5411987-09-0101 September 1987 Comments on Board Notification 87-12,rept of Investigation by Ofc of Inspector & Auditor,NUREG-1257 & V Stello 870414 Memo to Chairman Zech.Further Motions Will Be Filed After Reviewing Records & Appropriate Action Taken ML20237J7161987-08-24024 August 1987 Requests Author Name Be Added to Region IV Ofc of Special Projects Mailing List 1990-04-12
[Table view] |
Text
b ga g wim"GNE CASEf==-
(CITIZENS ASSN. FOR SOUND ENERGY) a4/946-9hh6 00NETED ustmc i
- April 25, 1984 l
'84 APR 30 Pl2:24 Administrative Judge Peter B. Bloch Dr. Kenneth A. McCollom, Dean U. S. Nuclear Regulatory Commission Division of Engineering, Architecture 4350 East / West Highway, 4th Floor and Technology Bethesda, Maryland 20014 Cklahoma State University Stillwater, Oklahoma 74074 Dr. Walter H. Jordan 881 W. Outer Drive Oak Ridge, Tennessee 37830 Gentlemen:
SUBJECT:
In the Matter of Application of Texas Utilities Generating Company, et al. for An Operating License for Comanche Peak Steam Electric Station Units #1 and #2 (CPSES)
Docket Nos. 50-445 and 50-446-1 ASME Code of Record As the Board is aware, Applicants have repeatedly made a big point in these proceedings about the ASME Code of record.
Information has just come into CASE's hands, as part of the Applicants' updating of past discovery requests, which indicates that Applicants have been playing games with the Board and other parties in these proceedings in this regard.
As indicated in the attached pages from CPSES Quarterly Reports on QA Department and QA Program Activities for several quarters, Applicants have been constantly and continually changing selected portions of the Code to suit their own purposes.
Further, as is clearly irdicated that (in some instances at least) the thrust of these changes is to allow Applicants to use less restrictive portions of the
! Code (see, for instance, the third page of CASE Exhibit 1,005 attached, which states, in part: "NCA-8230 of Summer 1982 Addenda eliminates the requirement for showing the location of the component support location on the drawing.").
CASE is unable to evaluate the effect of the additional changes which Applicants have made (even if we were able to obtain the many different codes involved, we simply don't have time due to the tremendous amount of documents we currently have to deal with regarding Cygna). However, this is of great concern to us, and appears to CASE to be contrary to ASME Code provisions, specifically NA-ll40 (g).* As far as CASE knows, the NRC has not given such assurance.
Respectfully submitted, e405010167 840425 CASE (Citizens Association for Sound Energy)
PDR ADOCK 05000445 PDR I g W %
cc: Service List (Hand Exhibit delivered ~to Board rs.) Juanita Ellis, President and partifromN7kthekrin0s)
/D 1 *See CASE 1,003 attached, ASM Co e. @7 ~
t
I CASE EXHIBIT 1,003 -
l 1
N A ll40 N A.12 20 Si t'llON lli, lilVISION I SUllSifilON NA )
.I NA140 sci s IriivE inAlie.s one code the nuclear powei plani io be constructed in ac- [
EijillONS. Ai)DENDA. ANI) coidance wnh this secunn. :t CASES y N A-1200 GENERAL REQUIREMENTS y fai (' ode i shuons become mandatory on Julv I of FOR AND DEFINITIONS OF f the publaauon ycar punted on the coven. Addenda II EM5 AND INS I Al.i.A IION 4 may be used on and af ter the date of issue and become
~
i mandatory sa months af ter the date of issue. N A.1210 COMPONENTS g-(b) Code Cases may be used begmning with the 9 date of appioval by the ASME Council and, being The components of a nuclear power plant mclude i permissive. do not become mandatory. Only Code items such as. vessels. piping systems. pumps valves. -
and storage tanks. Each component shall bear the j Cases that are specihcally idenufied as bemg ap- '
pbcable to Secuon lit may be used for construcuon in required Code N-type Symboli and Manufacturer's
~
Data Reports shall be prepared for them (N A-3370 I
accordance with this Secuon.
f a The Code Edit on.includmg Addenda.which is and N A-8400). The installer of such components or I mandatoi) on the contract date for a component shall any associated appurtenances shall complete Data y deternune the mandatory rules for the manufacture Report Form N-5 which serves to indicate that each i and mstallatmn of that component. including its component or appurtenance assembled into the ,
matenals. parts, and appurtenances. Earber editions nuclear power plant and the instalianon meet the h shall not be used, requirements of tlus Section, q fJJ l he Code 1.dmon, msluthng Addenda, whitn n mandamrv on the contract date for core support j su ut tmr> . uni t ompuncut supposts nliall dele Hiuie N A l2' 20 M NI F RlAl.S the mandatory tules for manulactuie and mstallauon of core support structures and component supports Matenals are manufactured to an SA. SIL or SFA i moludmg their matenals. Earher editions shali not h: Specificauon5 or any oth::r matenal specificahon i
used. permitted by this Secuon. Such matenal shall be I fc) t he con'rast date for .an enure nuclear power manufactured and certified m accordance with the 9 stem does not govern the Code Edaion. Addenda. requirements of this Section. Malenal3 produced i and Cases apphcable to the s ompiments. core suppoit under an ASTM designanon may be accepted as ,
i structur es. and component supports. complying with the correspondmp ASME spec-ff> Code Editmns. Addenda.and Cases which have incation provided the ASME specihcanon is de3-not become mandatory on the contract date for a ignated as bemg identical wah the ASI M spec-somponem may he used I y mutual consent of the incanon for the grade, class, or type produced and Owner 8 or hn agent and Manuf acturer; or instalicP provided that the matenal is confirmed as complymg on or af ter the dates perrmited by (a) through (d) with the ASTM specification by a Certified Materials above. It is permitted to use specific provisions within Test Report or Certihcauon from the Matenal .
an Edition or Addenda provided that all related Manufacturer. Weldmg matenal produced under an ,
AWS designation may be accepted as complymg with j requiremenis are met.
(gj Caunon n advned when usmg Addenda or the correspondmg ASME specihcanon provided the '
Ca3es that are less restricove than former re- latter specificauon is indicated to be idenucal with the quirements without havmp assu.ance that they aie AWS specification and provided the welding matenal acceptable to the enforetment authonties havn.g is conbrmed as complymg wah the AWS specihcation junsdahon at the nuclear plant sue. by a Certihed Matenal Test Report or Certihcanon th) The Owner or his agent shall obtam a Cei- from the Materials Manufacturer. <
tihcate of Authont.ation (N A-3230 and N A 824 I) i pnor to the held mstallation-(N A 1250)of any item of il
- The term Narpe symbut means any one of the symbols shown in layuic N A 3:22n 1 A of Pedauons lated uWer tk heading &n. M. j BSee N A 3210 or r dehnsiton of Ow ner Shapes. forgenys may be used as matenal for any of these product 8See N A.3310 for definition of M..nufacturer. forms even though nos all product forms are lated m the SA or SB 3See N A-Miu for defmiiron of in ialler. Specificauon.
4 q
- CASE EXHIBIT 1,005 - Pega 1.cf 6 T. - .
1 1
QA PROGRAM ACTIVITIES
)
i A. QA MANUAL MAINTENANCE During this report period a general rewrite of the Brown and Root CPSES QA Manual was complaced in preparation for the scheduled January 1982.
/ ASME resurvey. Prior to the resurvey, one minor revision was issued' to' the QA Manual to " clean-up" editorial errors. The QA Manual was reis. sued
[ on January 19, 1982 following incorporation of the ASME Resurvey'Teani',s.-
comments.
M Qi:N."
, y: . . ' I 7: , :
Subsequent to. the ASME resurvey, 2 revisions have been issued 'to the, f, '.T" ~
Brown and Root CPSES QA Manual. Of the changes included in these> revisions only the following activities constitute action other than routine 'QA F.,..
.. Manualmaintenance1,, ,c. ,.. . _. _, s.Q .. ., a . _ ..- -_ M ,,
. . ;{ ' - '
. ' . .~ T ' 7ti 1.
The manual was revised to permit vendors to be placed on #'
~ ~
aniASE*D.R .
- 1. y (Approved Suppliers List). on the b'asisJof NPT Certific'atei'ofj AuthoYliaEion 4.cf.yor.QA Manual .anddrogran review, .provided the'. item'being:fithished(gh --- ' "-
" ' - ^ ..,.. .1. is. with in the7 cope-duircribed% the Gau.ific.a6. ei Audun is nivu. .n h*kif.? M i;$ W : . .L y,o.3.AQ:3MGh'QT W W QA'.Hnaual; 50: . 42.,$: Ad .Yd W '..&&_ .!b2.$:h.U.:'.p;, 5 ?.$ $ ,5' & $ ger,7 9$C$.-.h.
' i.$e.' 5"?.' ..
Control of;Special Process now allows;:the ' Power Group or. Site-QAv ^ ~
. '- -.toireview. welding:proca' dure >specificationsland.the MaterialsiEnginE'Eingf' [
' , : Manager or Project Welding Engineer:t6 approve-Welding procedure $'$7Fl.y~ '
- < - * ..~ ' ' n "?! NOD.EIS L ..
a
. . ' + . . .;C ?l,;::.:F::
,;-J.@.% ,;.~specifications...' W '.g:rfa w .:1.: yly ,M, y .! . e :;.t.4,.m . = ~ p-: p%
' '. c.h z; . c m.. . . - . %. . ?e2- .; . . .
...~..a JYM.#x.W.M%,7...:
..~ -i.. 2Q. . . :. .u..-:#_g vw ,.m
@ ::M. W.. W # 4e .nu . . INSTRUCTIONS . _. .'.s r ,,. ~.t l.A. m% . . A. n.,:.B.a -
. ,%,-w:.@ . W.
. f ~ M.J.
f;C ap .
. . m M :tM.y vh=,M,wi.g... W 7;
-~;,f.w.n :. :3.J'30
A. PROCEDURE
S'* 62.gU ep.yWryt4Q 3 q '%.:P. %..,,., y as,;@
. ' > . .1
- t .., m .,. TN.A, dNM, . .:TheNolloiiring7aitiilt'i'7s a . " lati ~
.- were'-c ., ,,
- v. . -~ =
[B7 < cjpp
,'. Instruct _ _,Is,su .
w ln.:,,-
F, . 7 .-- m ._
_ew s.
.,r .w i.
L..];d 3
[% S ;'.T
~. - .. . :::
- pp l 7.
- u' rificat kM'h
~ ..d At M h y,. J^AP-=m.,,k.. .1 .,y
-P'etdanen
, Mu,.W* MM:.,
Trans a v:
, ..h.b.:.1, .
c
, gg..i I
QI-QAP-.11's 3,Insp.y;Nerificat
.-. q. n r
>4 bn a -
l w
kig. .~,Q8 :
\ % rov SofhT , DJ
Q:
p#m,.. -.,p s w I-QAP, L .e...r Inst.4fo o ecit*W
~..
4 ..
&. 0% h:3 .; M,rm "v ,9 iMa tenanceCofrMac uipment:y.
E~
L
'M.
Qg, f'*?4.:,'.;Nr>M.@e n.; Q . a... +..-.;. .; , ,.
. .p. -
0 CP-QAP-1 c.Q g, .u.y.9:y..
.f0f.
.e,.~. .gg..&'7&a.ier5.
...<..,--..g;- Storage.'s: -
p s,q GInsp$
y .,
qgc ;u ...y w.
. 3 ::'
mKvg.,u; q f ,;u',p
. g:0! K A
,. ' M *. g, . t:.'.L. ; CP-QAP.r.2.'.3.%.gt%m
~- .
. ..g.: ?.y "Q.A+Manu.y,,.! , . , - al
,. . : ,..z . . .. . Control'.*,* ; 2 .' .w
' . ->M m ... u..
CP-QAP-6.1 Preparation,' Approval;and Control'of Procedures
.. - y :q.
CP-QAP-8.5 Material Reclassification ~
~ '.' ;
CP-QAP-10.3 '
QC Surveillance of Walder . .g' Performance Qualification :.
CP-QAP-18.2 QA Review of ASME III Documentation .
[
~
Pags 1,of 4
. .3 ..
I i
~~ - . . _
~ ~-
QA PROGRAM ACTIVITIES ,
\
A. QA MANUAL MAINTENANCE . . _ . _ . . _ . _
_ __ ~
l NCA-8200 1980 thru Sunsner 1981 addenda was approvea ana includea
/ in the Code editions and addenda applicable at this site. 'This paragraph eliminates the need for reattachment of Code nas2 plates, i
when they are lost or removed from installed components, provided traceability of the component to the Data Report has been amintained.
.' :i.s ~
It was approved that material produced and certified to later edition
. and addenda of Section .II than 1974 Edition thru Winter:1974.is' acceptalbe for use, provided the material meets the additional re-quirements of applicable edition and addenda of Section III; ' - . .
w- m :a . . . -. ::,:: - . : .- .
~
Manual was revised to alfo.: .. . . .w preoperational test bytthe-owneir**prioc4W /' W.y to Brown & Root Code stamping the system.
. . i] lM. . : . s. - v:'., M.'&v:.g.3 iii. V2,
~'A.
. The pr..o.ce,..d..ure. .f.or. non.co.nf..o..rm.
. anean with 4 nntEC9_3_3 repair;.procedu.,res; in-;;Y"M ing items. .swas revise. dto al.. low.,r.e ., r.,s . . <
a;y - gg._ggi,41,. .4n
. .neene t- 5"..C"
-stead of! by:means of.adiNCR[2.M.This;. ~
permits?,repairstand' documen . .p
. ' . ~;,> - ., .-/.
1.tionIsf a,re.Fstr. .ika inliiifeW ed.u,ious m.a,.nn'ih."MJ@dWF.jg'C'~' -
- m. i . - .
. :,oO ..
-. w .y+,.p it
. . . s .,
E gpg.;; .. y.; ,. % .. . ..
...w~. . ,7. .v, . .
...- M .- .
-Also thi NCR procedure now.%e... quiresiremoval"of. hold ta'g's following3 ?'ffb W,' ~ .the.$pprovalI of'disposiHo Ciaseda'dlof removal;afthr? @!P?'V thefinip Y
<: ~ ;..-
-]2- .catlon of disposition. W Mt' W ii M .N , W :.
.a... ,. 7'f]ft $*s L.'...% --W- % -:?.d.9:&
.' .' C *.yT . .. . .
. .. ,. . .m . .
H. .yn;n.; . .;.,.,c_m...,;
- 3,,g.gy. y~a;,'Gm,v:.yh.. . d3 geen revised.,.t.o.m+1ndic wwp. -J C. . *g..;.r: .: W.:.D. 4 ... .
, m .. ., , ~-
E . c M y g,.. w, .- r.g ,. ..ati.o.n. .< . ch.ar.
- ,t- .... ~ -
n ic.acest h tSite
.. "wi yf. Jl . ..yy r. . ~.The.
A*T eerings. reporting;to Towert Groupe
- 5. i~ ,MM wmu .
1PSG. h .g!.,j.pM M
{S ~ s. ~ i s -
?.<.m - s g*JY. .Q..Mwi..thTthreel.grddpsd,.1'.IfQE?
c-
_. . . . _ m.g;e,. . . .;:q . p':
q> . . , , . . ; .:g g ,
+-+.
jwp. , c g m ,,
. _ rs u .., j e 7g,AL -
forr. upgrading to . pater procure "
rovmw ~
- / 700 not titiriddft'o'insi .
1 auuc.uumr.s sectivit es " r et cor.
~ "
2__
M- $ ,@ T; OT 19
'82. *$ truct
~
Isssedi ^S -
r.s i y.q,Mqesp 1.'f_tNew: 'Proced$res-or-Mer.M v.". 74 ' ~ ITLE,-Z P "1 .4lg .-
w -
m __ _ ,
f..y-ERo et j .4.'
% . ,, 'e s
~'
4 .
I -7. b r4 34 (a s._su.a_nce m . 2.o i ..: Pr.C._o.nt..
!Instruc c .. a
, **f e
I tion). ocedure b.9 ha*ga1[. M,7 [%, -
- n. W
?
h% ~p: :~;b,.~ n v 2 5
&,'w. ,.. . ::. . :. W
' yn;3N'
'5 t %"~y % L w WGft 'd -* >!. .. . . , . ;
g
-n g: ..
%.- l Revised: . k,. ! w:: w a e g.. y .a
- .f b
- s.'3.;p{~. Y D.,.
- ' ..g
- 4. '2.
.; -Q.NProcedures
.<ym.ngy :. .i 3 '...:<e.p or Instruct g gj %.y;w;y.. .
'
- 4. Q. +p
J dfe s.
,s J,b.htREVISIO '<*'
f . < !* . . ' ? ; p,.-. ,, . - gggu.. g. j f ,. TITLE ?. e.*a- - *
- w. ' t.' n & .
.~.:,. .; -
s a .%. .
.4 ..a-. .*'s.
Personnel Training and Qualification .n.6 i. . ,
CP-QAP-2.1 ,. , ,
Training and Certification of . . ,
QI-QAP-2.1-5 Inspection Personnel 1 11
- a. .
9 m
,m .
9-
- .:: D v 1 ~ ,,,. , 2 O
T'
.:.. Page 1 of 5 OA PIOGMM ACTIV"M .-
I A. OA'MANtmMAImmobbq ' M thi.s qu=. % . ;
~- . ~ . . . _ . ., . '
Mrre were three rev4=4em to the OA Mamsal.Aw4-.
. ='dd._
NK-5342 armi NX-5352 of 1977 Biiticn =1 =*---*4m in r=mmi* to theShae+-4m NB and ND had de finiticn of relevert ird_4*4m. finedd=*4niticn the relevent was im44-=+ 4m as an i d4 4m greater than 1/16", where as this .-~ w: ,, . .. .. . . , .
=i==4m frca ahden NC. .
N3e . . -8230 of Surmer 1982 Mia~h =14mientes the requimm.J fag., .
--? : w t l~-a+-im' c.
en :. : the . ..
shcwirg the 1~ a*4m.of th,e m
, .n :.. . .. ...r.~.... .
- . .~, w ,. -
~.
.a, ,q m. .n.. :n ..
._ ., . __ .. . 3.~
7' , --
the me,,,
i m===r 1581 M4arda '=14=4 n=+== i .. _
. NK-6125 of 1980 B11t ca gh=ne 'for hydro testirq of ' flangedMJoints.at which bl ndsthe hyer arel,ia to blank off other err 4:-nep..m4 a: E
.:..i ,% Y :,.~ t v. - ...
.m .4 w.2 . < .. .'
RK-4433 of 1980 Bitticn Summer or int1981 M9arda welds permits 1 e use a
=u -ti m mr*4nmus J
==4++ane -
fillet or partial.y=in. figure uc-4433-1. 6 uaw - ::* -
ether than as sha.n j;,,e 4
. .'. JZWiU.?MMNW.'4 4& Wi M FA & % T W 5 5 '.'.' ~ revi
...,s...
4 i '.
. . ... ~ . 'l y .:IC-4436 of Wintar-1981E4=n * ! ld. a nott-mts-to :=maadi pipirq system after.M P.'.K@A.s
' -:y m. js'iitissuce'6aIs'tisg'.".jhkifpcidedieziinitsia n f,7p]p, 'are.=11~=4.to be:used e
we fu11fori Q n attac c:
.W lEih.Q,,, dt.dw' gtti7afs24he+=m1forifillets6uxi012tir
~ ' ' ~ ~ ^ ^ ~ ^ ~ ~
' * '._.5 -
P- .
e'*+""'., ~~
ir
+4RY6ifftiii7a' ++aenE4 Ml4 ef'
- 2hE
- ; ;.. ll.y rh.
'J,'ge 5
.was immyi+.
iM
" ,.' 1 y,#
f TE : >
[f. .c.1 M mm ternate,metted% the requirWannt Y II- perm' , u
6ft 30ffar'A. - =W14id Dat:$WE@f9flYiGBar kf14S& w.*74Q.dtnf%yg { - 'M * :17 ~ ' "
L .:C..A .f'Er 65hkJ455 e C-O
~ i,;f<3s'? ~ 310 provided#alternata,t rules far,me =114mbolting%
M$ y .:.:
' hais,lisen'6.*sittoui'i.m5irtingiNCA-3800 we gp$! 0 w$
JJ'.F"2.!+l;
$$$$.t-gp ';;C. Ji1, -
we f w?.
4
- m. aw n
cd.f.oes.w, 4 h e: 1.hh.h bo %.c$., a,em'i _ _;14 =,J.=s st id' A=#fe-4=r .-
-4==.was TMWD cissued U.W as:mipart E.WgM. a-of m w /~ r_NEMEI$6M2IGMp/MM*@ft s . .
Y -e the JW -=*4 m ' changes % [. j..<MP min.
- '".?y'2.U, /h .;. ANanumi was reviset
- Fr+. .3.5, .s -- to .f . .*_ r= . . _.m ,..
m - uw,,: ,,4 _
9J.the Gu.ru.=6 ,-
a u ~.no level. -
e .. u E
. .4%. .,
, - ~, , m.. ,.~ .
Q 9
9.g , . --
8 p.,
%, 6
.' Ig *
'D . .
s,e* .. ., '
' ':.p. .
, . 7. ,s ..
-. . , .:.,u- .
. ' . .% ; "*- C - .
- - , s . -6 . ..r.,, .
, . , ' e M:..H ,
'.'4 p
.,:..- ~ - - . .
.: .:J : . . .J . . , . . .,..-.>..cu,....... se:.2... .u x., u m.- .r . ..w..._.:..... .. .. . , , . . .
Enclosure 2 Page 1 of 5 -
/
OA PPOGIW4 ICTIVITIES A. CA MANUAL man 7rENA?G
/ Pevision 12 of CA Manual was issued on FebrL1ary 28,1983. 'Ihe follow-ing p%&ds of Secticn III ASME Cbde here adopted:
ICA ll40(a) 1980 Editica, Ib 7AAanch NF-4424 (c) 1980 Edition through Winter 82 A:1denda NF-4711 1980 Edition throtsh Winter 82 Addenda 10C-4123 1980 Biition throtgh Winter 82 Addenda NX-4427 1980 Edition thumgh Winter 82 Addenda NX-4453.4 1980 Edition throtyh Sixmer 81 Addenda NX-6114.2 1980 Edition thret gh Stzmer 81 Addenda Cbde Cases N-237-1 N-274 AdciJtion of thsss'Ihter di5de TxFraEfrzqts pernitif~tW thWi followiliigi-
~ ~ -
- a. Fillet welds unaam4 re than spa <-ifiaA as lors as tridersire does not exceed certain parsteters.
- b. Weld repcirs to welds and base material after hydro testing provided the depth of repair does rot exceed, so that the repair requires radirmmphir examinatica.
Cbde Case N-237-1 vums ham testing requirtsnents for t'im 2 or Class 3 piping *aminating in sparges or spray devices provided the piping welds have been av=4nad to the requiumr_nt s of Class 2.
Cbde Case N-274 M ha the alternate rules for av=4n*4m of 2d repatrs.
. CA m.uuww AND HunuunCNS
'Ihe following activities wre crz:pleted or in the .s u..r.ss as of March 31, 1983:
- 1. New QA PWm or hL.C icns Issued:
NCMEER TITIE OI-OAP-11.1-39 }4a<+=4<-aT B;uipnent Installatica Inspection QI-OAP-18.3 OA ASME III N-5 Certifirmtion
- 2. CA Prode or Instructions Pavised:
TITIE REVISIQ7 NUMEER .
5
) QI-OAP-2.1-1 Nmdestructive Examination Fe.xsuaal Certification 4
~~
,,,,,,m ,.
. - - . - - . . - . - .. ...:...l.. .. .
Enclosure 2
- Page 1 of 4 OA PROGRAM ACTIVITIES A. OA MANUAL MAINTENANCE
- 1. Rev. 13 of OA Manual was issued on June 20. 1983. The following para-I graphs of Section III ASME Code were adoptedI
- a. NF-ll31.6 1980 Edition
- b. NF-1133 1980 Edition
- c. NX-5521 1980 Edition
- 2. Adoption of these later code paragraphs permits us the following:
- a. NF-ll31.6 and NF-ll33 was adopted to allow ASME pipe supports to be attached to an intervening element.
- b. NX-5521 was adopted to allow Level 1 individual to independently accept the results of Nondestructive Examination when the specific acceptance criteria are defined in written instruction.
~3. Section III ASME Code Table was also adopted:
- NF-3324.5(a)-1 1980 Edition through Winter 1982 Addenda _ ,,
- a. .
- 4. Adoption of this later code permits us the following:
- a. To allow welds to be proportioned to meet the stress requirements given in Table NF-3324.5(a)-1 for Class 1, 2, 3 and MC Linear type supports.
h B. OA PROCEDURES AND INSTRUCTIONS '
The following activities were completed or were in the process as of .
i . June 30, 1983:
. * . ..y
.; , ! , , . ,, 1. New QA Procedures .-
or Instructions issued:
.s ... ' 'I 't f TITLE [~.[y'[." ;
,N,.
d.5,[.t.$... NUMBER .g.,
'O! ' i.'lC.
e i '";2 ^ ~.ib..L }{ppsrqikgn AP-ll'.f4391*
Q w . W:: : . ' ;~Idiv'
. ;4 wm c'Disassendly/Rea'ssemblyarf 2 ' - o:ia us:::. -
Q: %i:6: E.n m - :?MQ::.q~M.: .
[ :. lY E;i :n.4. *!:b g .c-
.. m5 4
- g. ftl72:
.O 4-QA~s.
- ;.p r, ,';-w--a..-
5'if. J.;,....
4r.;.:.mi..,...
7 NUMBER. -
hm -
Procedures
%vr- - t ITLE-'"""*or s
9-a H.
y Instruction o .73... ~; ' ) . ,--revise
!"/g. .
> r.. . mREVISION .
e 1:
" '.ar n t- .I x - . . .
Training and Certification of 3-e.4 M. s - QI-QAP-2.1-5
- Mechanical Inspection Personnel y 2 Program for Repair or Alteration *
- . CP -Q AP-2 6 4 of ASME N-Stamped Components
- F . j k. .,,.
3'
' '~
QI-QAP-10.2-4A Ultransonic,D'igital Thickness
! ..[- -
Measurements 3
QI-QAP-10.2-4B Ultrasonic Examination of Hilti Bolts
. T' .
b .
D
? + _ - , - - ._ ,m _ ..-_.- ,=- m &._ --_-m . y . ._ . . ,..g- _ _
/
- /
! nclosure E 2 ,
Pas;e 1 of 3 4 I j M PRCCRAM ACTIVITIES A. O A MANUAL MAINTENANCE
'; Revisions to the QA Manual were issued on June 20, 1983 and August 3, 1983. ASME Section III paragraphs were adopted as follows:
Code Editions:
NF-ll31.6 1980 Edition NF-ll33 1980 Edition NX-5521 1980 Edition Table:
NF-3324.5 (a)-1 J980 Edition through Winter 1982 Addenda Revision August 3, 1983 - No Code paragraphs or code case adopted with the issue of this revisien.
4
- 3. 0A PROCEDURES A4D INSTRUCTIONS
- The following activities were ccmpleted or were in process as of September 30, 1983.
- 1. New QA Procedures or Instructions Issued:
NUMBER TITLE QI-Q AP-10. 2-4 E Ultrasonic Examination of ASME Se:: tion III Class 1 plate QI-QAP-11.1-40 Insulation Installation Inspection
- 2. QA Procedures or Instructions Revised:
1 NUMBER TITLE REVISION l CP-QAP-2.1 Personnel Training and Qualification 9
- CP-QAP-2.3 QA Manual Revision and Control 2 CP-QAP-2.4 Program for repair or alterations of ASME N-Stamped Components 3 l
- CP-Q AP-5.1 QA Review of Procurement Documents 4 CP-QAP-6.1 Preparation of QA Procedures &
Instructions 5 CP-QAP-8.1 Receiving Inspections 6 CP-QAP-8.2 Evaluation and Selection of Supplies 4 CP-QAP-8.3 Source Surveillance 4 CP-QAP-8.4 Supplier Audits 2 CP-QAP-ll.1 Fabrication and Installation of Components Component Supports and Piping 3 C?-QAP-12.1 Inspection Criteria and Documentation Requirements prior to N-5 Certifications 9
MOlogure. /.
~ ..
,. ?cg3 1 of 3
~
./ '
OA PROGRAM AC*IVI*IES_
OA MANUAL MAINTENANCE _ October 12.. 1983, adopting the A.
A revision to the QA Manual was issued on following ASME Section III Code Editions and Addenda 1977 Edition Addenda through Sumner 1977 NC-2300 1974 Edition through Winter 1974 NC-4335.2 NCA-8200 1980 Edition through Winter 1981 Addenda 1 NF-2610 1983 Edition - No Addenda NF-4453.1 1980 Zdition - No Addenda NI-2610 NI-4430 1980 Edition through 1950Winter'1981 Addenda Addenda 1 NI-6000 NB/C/0 2420(d) 1980 Edition through Summer 1974 Edition th NP-4622.3.1 Code Cases _
W-274 N-275 N-310 1751 E. OA PROCEDURES AND INSTRUCTICNS in process as of December The following activities were completed or were 31, 1983:
- 1. New QA Procedures or instructions Issued NUMBER _
E Identification, Traceability and Retention of ASME CP-QAP-12.4 Code Nameplates RWIstog
- 2. QA Procedures or Instructions Revised NUMBER E 20 ,
CP-QAP-2.1 Personnel Training and QualificationTraining 4 QI-QAP-2.1-5 Inspection Personnel 5 3
CP-QAP-3 1 Site ASME QA OrganizationControl of 3QA Procedu CP-QAP-7.1 Evaluation and Selection of Suppliers 3 CP-QAP-8.2 2 CP-QAP-8.4 Supplier AuditsPermanent Equipment f Transf er Verification CP-QAP-9.1 2g3 QI-QAP-11.1-28 Pabrication, ASME Component Installation Supports, Class 1,2Inspections
& 3 ;5 o QI-QAP-11.1-28A Installation Inspections of ASME Class 1, 2 & 3 Snubbers ime i e
88& .
4 eh
.