Y NIAGARA NuMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ER:E BOULEVARD WEST SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 April 18, 1984 (NMP2L 0033)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Starostecki:
SUBJECT:
Nine Mile Point Unit 2 Docket No. 50-410 Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning the single girder cranes in the diesel generator rooms (55(e)-84-13). This problem was reported via tel-con to Mr. S. Collins of your staff on March 21, 1984.
Very truly yours, h/N LW C. V. Mangan Vice President Nuclear Licensing and Engineering CVM/TRL:lf cc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. Gramm (NRC Resident Inspector) 8405010160 840418 p}
gDRADOCK05000 d
8 tb
1 I
s NIAGARA M0HWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 t
Interim Report for a Problem Concerning Cranes in the Diesel Generator Rooms (55(e)-84-13) i i
Description of the Problem The subject single girder cranes are located in 'the diesel ge'nerator rooms for servicing the diesel generators. The runway beams are designed as seismic Category I but the cranes are not seismically qualified.
i j
In its original parked position, the crane was designed such that if it had fallen as a result of seismic event, the crane or crane parts would not impact on the diesel generators.
This design was in accordance with Regulatory Guide 1.29 Rev. 3, Paragraph 2.
As the result of a design change in the parked position of the crane, the crane, or crane parts, could impact on the diesel generators if it would fall durin. a seismic event.
4 This matter is still under investigation. A final report will be submitted by October 15, 1984.