Telecopy AO 3-2-9:on 730702,first Stage Turbine Pressure Setting Discovered Slightly in Excess of Tech Spec Limits. Cause Unknown.Investigation Underway
ML20084A969
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 07/03/1973
From:
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-3-2-9, NUDOCS 8304060046
Download: ML20084A969 (2)


Text

M$ ((;[$}N Jh,h[kQ N[M dbM/@y lD ' _ M. N T/;; W W<~- d e %

'f;W).':g O

o

, N,. M. # <E6'[..lOM!

.s.q.,e.g % sq;.'.7 m "E44 m.,;y #,

. &c

.w m,>-

.~

~

NKd539(2127)(1-05E217A1E4)PD 07/03/73 2124 ICS IPMDCNC NYK 030E5 FR DC PEWYORK NY 22E C7-03 5CEP EDT PMS JAMES P OREILLY, DIRECTOR REGULATORY OPER ATIONS REGION 1,US ATOMIC ENGEGY COMMISSION (DELIVER) 7' 970 BROAD ST NEWN1K NJ 07102 DEAR MR O'REILLY/

3 IN ACCORDANCE WITH THE REQUIREMENTS.0F TECHNICAL SPECIFICATION.6.6.1.B, THE FOLLOWING ABNORMAL OCCURRENCE REPORT ( A.0 3-2-9) IS PROVIDED/ DURING THE PERFORMANCE OF PERIODIC TEST AND CALIBRATION PROCEDURE PTM-12 ON JULY 2, 1973, IT WAS DISCOVERED THAT THE FIRST STAGE' TURBINE PRESSURE SETTING WAS SLIGHTLY IN EXCESS OF THE LIMIT DEFINED BY FACILITY TECHNICAL SPECIFICATION 2 3 2. A.2. INSTEAD OF 3

THE TRIP BECOMING UNBLOCKED AT THE PRESCRIBED 10/ OF FULL POWER, MAXIMUM, ONE OF THE TWO CHANNELS WAS

,m msm M

FOUND T0 SE SET AT 10 3 / ADDITIONALLY, THE PERIODIC TEST REVE ALED THAT ONE OF EIGHT SAFETY INJECTION STEAM FLOW Q

BI-STABLES VAS SET 0 3/ HIGHER THAN THAT PRESCRIBED IN TABLF 3 10F THE TECHNICAL SPECIFICATIONS. THE PROPER

)

SETTINGS FOR THESE TWO DEVICES VERE ESTABLISHED DURING THE COURSE OF THE CALIBRATION CHECK.

3 AN INVESTIGATION AS TO THE CAUSE OF THE SETTING

)

DEVI ATIONS IS PRESENTLY BEING CONDUCTED. THE RESULTS OF THE INVESTIGATION, AND ANY MEASURES TAKEN TO PREVENT

-)

RECURRENCE, WILL BE REPORTED IN A LETTER PROVIDED WITH IN TEN (10 ) DAYS AS REQUIRED BY THE FACILITY LICENSE.

J IN ACCORDANCE WITH THE REQUIREMENTS OF TECHNICAL SPECIFICATION 6.2, NOTIFICATION TO THE CHAIRMAN OF THE NUCLEAR a

pv<

.)

,m m>m B!

.,t b 730703 S

05000247 PDR

O O.

~

en,,.,

.,,. YAW 7?b?m M W,, f "l','l W,$~ 3 %a:,;lS}w[m$2X fff fI~

p.w

~'

. n

x. :,.,

,7....--

,y e;w

,;+.

,;2 MiA R

~. R l. ;:

I

> i[.../c SrfG5 TefM
.$$$%$$$$Yh

!s;.

lll.-

(

- 3.[. -

i I?.2@3hu!;Lh}]llei

,p

.m

., 7 9 x,'y ;;s:ggyptguln s,t y?:>y a y:;;;:n@.2

,,h

.. : cr A.

l M.

T

'N n' :' J 1

L,,<.

3 n

F ACILITIES SAFETY COMMITTEE 1:AS TAKEN PLACE. MR C OBERG OF THE U.S. ATOMIC ENERGY COMMISSION, REGION 1, REGULATORY OPER ATIONS, WAS ALSO NOTIFIED BY TELEPHONE, OF THE OCCURRENCE BY MR JOHN M MAKEPE ACE, CHIEF' ENGINEER OF

~3 UNIT NO 2, ON JULY 2,1973 CON EDISON NYC i

=

C

@F 1201 (RM9)

MEMO ROUTE SLIP S*e me about this.

For Concurr For action, g

a Fornr AEC-9th Rev. May 14.1947) AECM 0240 Note and return.

For signature.

For leformation.

I TO (Name and unit)

IMTIALS REMARKS I

CONSOLIDATED EDISON COMPANY

41. D. Thornbur e f" DOCKET No. 50-247 p FS&CB, RO ABNORMAL OCCURRENCE: TWX DATED 6/8/73 TO (Name and unat)

' (N'6MarlALS REMARKS The attached report from the sub_iect licensee is cc: RO:llQ (5)

DR Central Files forwarded in accordance with R0 Manual Chapter 1000.

l uit RO Files Reg. Standards (.5)

The action taken by the licensee is considered

}

TO (Name and unit)

INTLALS REMARKS Dir. of Licensin ; (13) appropriate. An RO inspector is presently at ths

{

site. Copies of the report have been forwarded

}

urs 1

to the PDR, Local PDR, NSIC, DTIE and State j;

FRoM (Name and unet)

REMARKS representatives. The licensee will submit a 10 i

f day written report to Licensing r.

g l'e1.,. J. Brunner, RO:I h