AO 3-2-18:on 731219,analysis of Monthly Pressurizer Pressure Tests Indicated Low Setting for One Bistable.Channel Recalibr & Detailed Rept Re Instrument Drift Underway
ML20084A207
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 12/21/1973
From: Cobean W
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084A196 List:
References
AO-3-2-18, NUDOCS 8304050128
Download: ML20084A207 (2)


Text

' m.

.. ) )

e J J

MEMO ROUTE SLIP 5ee mnwyt this. For concurrWe. For action.

Form AEC-96 (Rev. Stav 14.19 69 AILSI 0240 Neve and return For St reature. .

For Ieformation. l To (Name and ut4t) IN81tALS REMARKS R0 Chief, FS&EB A I OWAW RO:llQ (5) / IP-2 A0 3-2-18 RO Files V D^TE Central Mail & Files Rec.it l a tnrv Standards (3T Directorate of The above abnormal occurrence is forwarded Licensing (13) for information. Distribution will be OGC DATE Regional Directors (T T , TTT. TV) made by this office to the PDR, Local PDR, TO' (Nime and unit) HTIALS REMARKS .

NSIC, DTIE, and State Representatives

,,,, after review by the licensee for proprietary information.

hiM ARKS F RQfA

  • g .. ' amo aqd unst).fy,-,x '

E. J. Brunner Region I -

PHONE ML DATE 8-337-1246 12/21/73 USE OTHER SIDE FOR ADDITIONAL REMARKS CPO e 1911 O . 445 44) e t .

8304050128 740104 FDR ADOCK 05000247

,4 g PDR

EN 1

y - ~ ,-

< y

_ p._. .

r.sa ., K -

ud

  • t1 Consolidated Edison Company of New York,Inc.

.fy!/{g0,W

'a i

-i

! e l 'hl..y-6:T% A W., ni 4 Irving Place, New York, N i 10003

Q+

^

-goh ; lU_~

January 4, 1974 Re: Indian Point Unit No. 2 Facility Operating License DPR-26 A.O. 3-2-18 Mr. John F. O' Leary, Director Directorate of Licensing Office of Regulation U. S. Atomic Energy Commission Washington, D. C. 20545

Dear Mr. O' Leary,

The following report is provided pursuant to the requirements of Section 6.12.2 (a) of the Technical Specifications to Facility Operating License No. DPR-26.

On December 19, 1973 an analysis of the results of monthly periodic tests and calibration checks relating to pressurizer pressure in-dicated that the setting for one of the three pressure bistables associated with low pressurizer pressure coincident with low pres- .

surizer level safety injection was slightly below that required by Item 3 in Table 3-1 of the Technical Specificctions. At the time of these periodic tests and calibration checks,-the reactor was in the cold shutdown condition for maintenance work asscciated with repairs to the feedwater piping for No. 22 steam generator.-

In my letter to Mr. James P. O'Reilly on December 21, 1973 and the ,

report on A.O. .3-2-16 the bistable was referred to as part of a.

two out of three logic system. This particular bistable is actual-ly part of a two out of two logic system which provides for a safe- <

ty injection signal on coincidence of low pressurizer pressure and

  • low pressurizer level in any_one of three channels. The setpoint was found to be at 1680 psig instead of greater then or equal to 1700 psig as required by the Technical Specifications.- The bistable was recalibrated and the channel was retested satisfactorily.

Because this safety ' injection circuitry is actuated by any one of-three channels and since the other two pressure-bistables in the- '

remaining two channels of this' system were found to-be operating