AO 4-2-8:on 740215,during Reactor Coolant Temp Channel Test, Limiting Safety Sys Setting Read Below Required Tech Spec for Channels II & Iv.Cause Under Investigation
ML20083R663
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/19/1974
From: Cobean W
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20083R668 List:
References
AO-4-2-8, NUDOCS 8304040603
Download: ML20083R663 (2)


Text

N x x ' -

,J.

O O l

1 l

l R ~ .m

)tetehw.rw-=.

3, ,, Conschdaied Edfron Company o' New York, Inc.

irr,Lsd[f 2 @ 4 kving Mece, New York, N Y 10003 February 19, 1974

' l'

- Re: Indian Point Unit No. 2 AEC Doc;h e t iha . 50-247 Operat.ing License DPR-2f, A.O.-4-2 8 .

Mr James P. O'Reilly, Director Regulatory Operations, Region I U. S, Atomic Energy Commienion t,31 Park Avenue King of Prussia, Pennsylvania 19406 Dear Mr. O'Reilly; In accorde.nce With the requirements of section 6.12.2a of the Technical Spoo.ifications of Facility Operating License No.

DPR-26, the fol10 wing report is submitted.

Periodic survei13ance test PT-M2, " Reactor Coolant Temperature hhalog Channel Functional Tee,b -L\T Overtemperature and T QVer-power", was performed on Februnry 13/16, 1974 with Unit No. 2 .

in the cold shut.down condition. The limiting safety systen set- e: j t.$ nga of Cha nnhl.a. 11 and IV of the Dvertemperature AT Re&otor  ?.9 ;

Trip circuitry were found to be be10e thht h9 quired by Technical ).j:[ .?

Specification 2.3.).B (4). Channal.; 1 and 111 were f ound to be  ;

Operhting om rently. Channele 11 and IV were recalibrated and 'QiQ('l tested satisfactorily, f Se*

Q :-

Safety Jwp).iostione of thie discrepancy are considered rJ ight "d 9 sinon the reactor was in a cold shutdown condition and the re- yC maining' trip circuits would have provided complete reactor pro- fii41s tection ogninnt an excecnive flux tilt even if this had not boon ,.; M the eace. The maximum error f ound would havn rnaulted in the ac- 1 -k tual reactor 4T exceeding the limit by 0.30 0 P in achieving an U '. f overtomparatt,arnA T trip for channele 11 cud IV. hC kN in an effort. to data.rmine the cause of these deviationr, and pre-viously repor Wd onee of a similar natore, our investigation into this matter as discussed in our letter to Mr. John F, O ' 7..- a r y dated January 25, 1974 is continuing.

k ,

3 8304040603 740219 L\ ,;!

PDR ADOCK 05000 g

= ,

J

%\ ta ..

'r" O'Reilly ..w.a.. As J A L l -

L. L - U d Febn dry 19, 1974 d

.. S ' g James P.

  • x 0 Est Indian Point Unit No. 2
~

AEC Docket. No. 50-247

_ - . Operating LicenSt) DPP.-26 A,0.-4-2-8  ;

=

=T Mr. Anthony Pasano of your office was notified of this occur- 2 rence by Mr, Jchri Mahepeace by t.elephone on February 16, 1974, }

Voly tru)y yours, 3 3

,s h,b.hha.p.. D -. on(t. , ,

Warren R. Cohean, Jr.,dinnager D- ,

i Ifuelear l'ower Generation 1 1 Mr. ohn P. O' Luis.ry $-

1

=T 1

z

?

. d 5

. ==

s 4

a

'i i.. .

E.

d E-4 Y

, i +

_1 ,.

a -