ML20083R490

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Undersized Structural Steel Shop Welds.Final Rept Will Be Submitted by 840629,per Extension Granted in 840330 Telcon
ML20083R490
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/05/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NMP2L-0024, NMP2L-24, NUDOCS 8404240166
Download: ML20083R490 (1)


Text

M V NIAGARA R UMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE. N.Y.13202/ TELEPHONE (315) 4741511 April 5, 1984 (NMP2L 0024)

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Comission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

The final report in accordance with 10CFR50.55(e) concerning undersized structural steel shop welds (55(e)-84-01) will be submitted to the Nuclear Regulatory Comission by June 29, 1984, rather than March 30, 1984, as previously comitted. This extension was granted via telecon between Mr. T. R. Loomis (Nine Mile Point Unit 2 Licensing) and Mr. S. Collins of your staff on March 30, 1984.

Very truly yours, NW &A^

C. V. Mangan-Vice President Nuclear Engineering and Licensing CVM/TRL:lf cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. Gram,' Resident Inspector 44