EMERGENCY CORE COOLING SYSTEMS N
ECCS SUBSYSTEMS - T vq 2 300*F a
LIMITING CONDITION FOR OPERATION 3.5.2 Two independent ECCS subsystems shall be OPERABLE with each subsystem comprised of a.
One OPERABLE high-pressure safety injection pump, b.
One OPERABLE low-pressure safety injection pump, and c.
An independent OPERABLE flow path capable of taking suction from the refueling water tank on a Safety Injection Actuation Signal and automatically transferring suction to the containment sump on a Recirculation Actuation Signal.
APPLICABILITY: MODES 1, 2 and 3*.
ACTION:
a.
With one ECCS subsystem inoperable as a result of an inoperable train of low pressure safety injection, restore the inoperable train to OPERABLE status within seven days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b.
With one ECCS subsystem inoperable for reasons other than ACTION a, restore the inoperable subsystem to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
In the event the ECCS is actuated and injects water into the l
Reactor Coolant System, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date.
SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:
a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves are in the indicated positions with power to the valve operators removed:
Valve Number Valve Function Valve Position 2CV-5101 HPSI Hot Leg Injection Closed Isolation 2CV-5102 HPSI Hot Leg Injection Closed Isolation 2BS-26 RWT Return Line Open l
- With pressurizer pressure 2 1700 psia.
N 9505260262 950519 PDR ADOCK 05000368 P
PDR ARKANSAS - UNIT 2 3/4 5-3 Amendment No.
(
1 MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS (FORINFO ONLY) t,
EMER*ENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS ~- T yg 2 300*F LIMITING CONDITION FOR OFERATION 3.5.2 Two independent ECCS subsystems shall be OPERABLE with each subsystem comprised of:
a.
One OPERABLE high-pressure safety injection pump, b.
One OPERABLE low-pressure safety injection pump, and c.
An independent OPERABLE flow path capable of taking sucttut from the refueling water tank on a safety Injection Actuation db.aal and automatically transferring suction to the containment Sump on a Recirculation Actuation Signal.
APPLICABILITY: MODES 1, 2 and 3*.
ACTION:
With,one ECCS subsystem inoperable as a result of an inoperable a.
train of low pressure safety iniection, restore the inoperable train to OPERABLE status within seven days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
erks With one ECCS subsystem inoperable for reasons other than ACTION a, restore the inoperable subsystem to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s-or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
hvg4 In the event the ECCS is actuated and injects water into the l
Reactor Coolant System, a Special Report shall be prepared and submitted to the Commission pursuant to specification 6.9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date.
SURVEILLANCE REQUIREM gTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves a.
are in the indicated positions with power to the valve operators removed:
Valve Number Valve Function Valve Position 1
2CV-5101 HPSI Hot Leg Injection Closed Isolation 2CV-5102 HPSI Hot Leg Injection Closed
)
Isolation i
2BS-26eBG24 RWT Return Line Open l
- With pressurizer pressure 2 1700 psia.
1 i
ARKANSAS - UNIT 2 3/4 5-3 Amendment No.