ML20083Q102

From kanterella
Jump to navigation Jump to search

Notifies That Sample Plan 2 Selected for Snubber Functional Testing to Be Performed During Shutdown on 840225,per Tech Spec Figure 4.7.1
ML20083Q102
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/14/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20083Q093 List:
References
TAC-54882, TAC-54883, NUDOCS 8404200326
Download: ML20083Q102 (1)


Text

\\ _

y 7

r-i~

.A

~

/ I htr.chamnt 2.

A s

DeacPown Gonn m P.O. Box 33180

" ~

cit.ARLOrTE. N.C. 20242 ILU. D. TUCKER WKEPete. DENT (704) 373-4531 wveteam Paeocenon February 14', 1984 Mr. J. P. O'Reilly, Regional Mrdnistrator U. S. Nuclear Resulatory' Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Subject:

McGuire Nuclear Station, Unit 1 Docket No. 50.369 Snubber Funtrional Te.s.s Sampling Plan (T.S.4.7.8e)

Dear Mr. O'Reilly:

l Technical Specification Surveillance Requirement 4.7.8 states that each I

l snubber required ny T.S.3.7.8 shall be demonstrated operable by performance or an Augmented Inservice Inspection Program (na given in T.S.4.7.8a-1) and the requirements of Specification 4.0.5. Part of this Augmented Inspection l

Progrca (T.S.4.7.8e) is that during the first refueling shutdown and at least once per. refueling thereafter, a representative sample' of snubbers shall be tested using one of the thrae sample plans given.

The sample plan is to be selected and the NRC notified prior te the test period.

McGuire Unit 1 first refueling shutdown is currently scheduled for February 25, 1984.

Accordingly, this letter constitutes notification l

that Duko Power Company has selected sampic plan No. 2 for the functional testing which is to be performed.ejuring the shncdova.

This plan involves functionally testing a represearatite sample of the snubbers in accordance

'vith T.S. Figure 4.7.'i.

Very truly yours, Hal B. Tucker-

/

\\

l PBNigib.

l Mr. Harold R. Denton, Director Mr. W. T. Orders cc:

Office of Nuclear Reactor Regalation Sr. Resident 16spector-NRC

'Uc S. Nuclear Regulatory Commission McGuire Nuclear Station Washi49 ton D.- C; 20555 5

, Attention:, L. E. G.. den. sam

.-9 7 +- ' i

,s.

e k

e r.,

~';.,o -,

V 5

.f

  • y #2

. \\e

% q.

M'

-/

b[

O ep 5

PDR 4g

,J is x

/ f.y.

b

. y 4.I.

h

"