OPERATING DATA REPORT

_ _ _ _ _ DOCKEL NO. _.50-317.

DATE 4-12-84 COMPLETED BY EVELY;4 BEWLEY TELEPHONE (301) 767-5365 OPERATING STATUS

                • NMMMN
1. UflIT HAME : CALVERT CLIFFS HO. 1

_2._ REPORTING. PERIOD M MARCH 1984._

3. LICENSED THERMAL POWER (MWT) M 2,700

_4.

HAMEPLATE_ RATING.(GROSS MWE) M 918

5. DESIGN ELECTRICAL RATING (HET MWE) : 845

_6. MAXIMUM DEPENDABLE CAPACITY GROSS MWE M 860

7. MAXIMUM DEPENDABLE CAPACITY (HET MWE) M 825 8._IF_ CHANGES 0CCUR IH CAPACITY RATINGS (ITEMS,HUMBER.3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS M
9. POWER LEVEL TO WHICH RESTRICTED (HET MW) M 10._ REASONS.FOR_ RESTRICTIONS.

MO,NTHLY

.YRMTOMDATE.

, CUMULATIVE g

11. hiOURS IN REPORTING PERIOD 744.0 2184.0 78013.0
12. CUMBER OF HOURS REACTOR WAS CRITICAL

~~13.' REACTOR' RESERVE SHUTDOWN HOURS 618.4 2013.9 61980.8 O.0~

0.0 1887.9

14. HOURS GENERATOR ON LINE 607.5 1997.1 60743.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1620646.

5290193.

149432488.

~17'.~ GROSS ELECTRICAL ENERGY GENERATED (MWH)

" 547785.

1810454.

49237939.

'^

18. NET ELECTRICAL EHERGY GENERATED (MWH) 523596.

1734680.

46969645.

19. UNIT SERVICE FACTOR 81.7 91.4 77.9
20. UNIT AVAILABILITY FACTOR 81.7 91.4 77.9 "21~.' UNIT CAPACITY FACTOR-(USING~MDC HET)

'~

' 8 5 '. 3

~96.3 73.9 22, UNIT CAPACITY FACTOR (USING DER NET) 83.3 94.0 71.3

23. UNIT FORCED OUTAGE RATE 18.3 8.6 7.5
24..SHUTD_0WNS S_CHEDULED OVER THE HEXT 6 MONTHS (TYPE, DATE, AHD DURATION)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :
26. UEIT IN TEST STATUS (PRIOR COMMERCIAL OPERATION)

"'~

' INITIAL CRITICALITY ~ ~

FORECAST ACHIEVED

~

IHITIAL ELECTRICITY COMMERCIAL OPERATION

_ _. _.. _ _ _..__. ~ ~ ~

8404190371 840331 PDR ADOCK 05000317 R

PDR

l u-L O'

O O

OPERATING DATA REPORT o

DOCKET. NO.

50-318 - - -

l

^

COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5365

~ _ _ _

l

'OPERATINS STATUS

-c = muunummunuma

1. UNIT NAME : CALVERT CLIFFS'HO. 2
2. REPORTI_N_G PERI _0.D_M_MA,RC_H_198_4__,

l3,' LICENSED THERMAL POWER (PBdT) M 2,700 L -

~

911

. 4.- NAMEPL ATE. RATING (GROSS P54E)' N

5. DESIGN ELECTRICAL RATING (HET MWE).: 845
6. M_5,XI_ MUM _DEPE.- N.D. A.B. L E, CA,_P AC. IT. Y,- GR_ OSS_MWE_M.._86 0__

7.' MAXIMUM DEPENDABLE CAPACITY:(HET MWE).M 825 i S. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS HUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS M 9.< POWER LEVEL'TO WHICH RESTRICTED (NET MW) N 1,0.-REASONS FOR RESTRICTIONS.

MONTHLY.-. _YRMTONDATE,.-. CUMULATIVE g,g g

L11. NOURS IN REPORTING PERIOD

744.0 2184.0 61368.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2184.0 52111.8 737 REACTOR' RESERVE SHUTDOWN HOURS ~'~-

~ '--~"~0.~0 '- ~ '~~ ~ ~0.'0'- - ~ ~

~ ~'957.8~ ~~ ~~~ ~ ~~ ' ~ ~

-~ - ~ - ~

' 14. NOURS. GENERATOR ON LINE-O.0 0.0.

0.0 744.0 2184.0 51299.2 15.'ONIT, RESERVE SHUTDOWN HOURS

. ~ 16. GROSS THERMAL' ENERGY GENERATED (MWH).

1995055.

'5773913.

127615607.

~

~

~

~ ~ ~ ' ~ ~ ~ " ' " - ~ ~ ~.

17~~ GROS $~ ELECTRICAL ENERGY ~ GENERATED (MWH)'

~~652581.

'~ 18 9 7 8 8 3 ^. ' ~ ' -

'41967169.

,18.' NET ELECTRICAL ENERGY GENERATED (MWH) 625072.

1817597.

40021359.

! 19. UNIT SERVICE FACTOR 100.0 100.0 83.6

20. UNIT AVAILABILITY. FACTOR 100.0 100.0 83.6 DITUNIT'CAPACITT FACTORT(USING MDC' NET)1 101'8 10 0.~ 9 ^

7 9. 6~

~ ~ ~ ~

~ '~~

~ ~ ~~ '

f22.LUNIT CAPACITY FACTOR (USING DER NET)-

.99.4

.98.5 77.2 23.:DNIT FORCED OUTAGE RATE.

0.0 0.0 5.6

24. SNUTDOWNS SCHEDULED OVER=THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION)

Ns. 2 Plant is. scheduled to begin a 10 week outage in April 1984 for refueling and a unit general inspection.

.25. IF SHUTDOWN AT END OF. REPORT PERIOD, ESTIMATED DATE OF START-UP

- 26. UN.I_T.._I_N_TES. T.~ST ATUS (PRIOR COMMERCI AL OPERATION)

~ INITIALJCRITICALITY T~~ '~'~ ~

~~ FORECAST' ~ ~ ' ' ~ ~

~~ ACHIEVED" ~ ~ ' - ~ - ~ ~

~

~ "

" ~ ~ ' '

~ ~ ~ - '

~

i -

' INITIAL ELECTRICITY' COMMERCIAL OPERATION ~

w w..

a w - --

a.--..-.:~-

.... ~

h


m

AVERAGE DAILY UNIT POWER LEVEL

._ DOCKET NO.

50-317 DATE 4-12-84 COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5365 MARCH 1984 MMMMMMMMMMMMMMMMMMMMMMMMM

~~

DAY ~~~ ~~ AVER A GE ~ DAILY ' POWEP.' L EV EL"'

~ ~~ ~' "~ '~" ~

~

~'

~ ' '

' ~~~~

~ ~ ~ '

(FWE - HET)-

,1

-,,.-.~.-_-_.-

,8.

g,

.3 0.

4 0.

5__.____..

-... _ _. _ 3 3 __ ___

0.

7 777.

8 881.

9-882.

~~~~~

~~~ '~~~'~ ~~~~~~~

' ~

~~ ~ ~ -

' ~ ~ ~

10 881.

-11 881.

12-

.883.

13 882.

^ ~ 14

~

- ~~ 8 8 2.

15 882.

16

882, 17 883.

"~~

~

~~~ -

867.

19

-884.

20 883.

21 883.

..~

23 883.

24 883.

_ _ _ -25 _....

882.

~~~

~~~ ~ ~~ ~

~

~

~ ~~~ ~

882.~~~~~~~~~~~~""~~~~'

27 882.

28'

883,

._._ 2 9.__

- _797. _-... -__ _._ _ _-... _.

31 880.

y x..

76_

-Neh.F*h ed. r$a6re tw*.6 h-e

.*We v e k.

.h9-m**<W4-

<e*--

+i-44--

e, y

g

.L_....'.r.n

_ ie u,~,. n,.w m

s i n.,,

un w

a m,..+,sn._,..

b'

~. ~

L O

O O

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-318..

--_..__ UNIT CALVERT CLIFFS NO. 2

. a._

DATE 4-12-84 COMPLETED-BY EVELYN BEWLEY

- -._ _. _._ _.._ -.- _.___. _.. -.__.__ _,__ TELEPHONE - J 301)_.787-5365 MARCH 1984' MMMMMMMMMMMMMMMMMMMMMMMMM w-J _.

.a.

.2.

~..

_.. ~ _ _ - _

(MWE NET) 1 _ _.,_ _

840.,,__,._._.-_.--.._._.-.-_._,-..

3

- 840, 4

838.

5

_._.. _-, 836. _ _ _.., _._ __._ _. ~-__.___.

--_._,_.__a

-7 841.

8 842.

9'.

. - _., _.. _ -841._ _._,_-___..._._ _-_..-.

-11 842.

'I

-12

- 840.

_ _ _._ 1 3 _. -_.. __.. -.

840. - _-._. _ - -.. _.-

15 843.

16..

845.

17 844.

19

- 845.

-20 844.

~21

.22

_m_843. _ _ __ _ _.__...__

844, 23 845.

24 844.

... -842.~

25 27 843.

28 840.

29

___;8 2 6.__

30 818.

31 827

_m_,

= -.. _. -...

p

.ed.'mNw-'.u---%e.5ug.D.r+.*wg'd.d.-MN*-w-

_M..e y.4e._r r.Ew.g-'8i i.=_'

e.*E-e'N 4.-

L-

.w._,4.-u.-.--_._..,--~_.,.4.-

- ~-

k (i

N

^

~.

50-317 DOCKEfNO.

UNII SHUTDOWNS AND POWER REDUCTIONS -

t cliffs No. 1 UNIT NAME

  • / " # ""

DATE COMPLETED BY E' 8'"l'Y March 301-181-5365 REIVRT MONTH MLLPHONE -

3 E

No.

Ihte k

)

3 {E5 Licensee E,

Ea cauw & roeecctive d

Ewas

($

Ei Astion se ac 3ge Repuet a en v E'

Peevent Resueeer.st f2 4

s v

b 84-03 840228 F

136.'5 A

4' CB PUMPXX Due to loss of two charging pumps and repair leaking pressurizer safety valve.

2 I

3

-1 F Forced Reason.

MethoJ:

EzJi: tit G Insievetions

. S. Scheduled A Equipment Failvee(Esplain)

I Manuel foe Feeparation of Data 8 Maintenance eiTett 2 Manual Scram.

Enerv Sheets fut Licensee r R: Fuel.c3

.t. Avionaiec Scram.

Esen Repos ILERIFile(NURE(

D-Regulatoe) Retisi,;sion b0ontints.it ton 03 t83 3 1; Operater Tsaining & Laccuse l'samasiation bl.o.W Redm t ' M.

F Adecennteatise 5

%0t t.n G4)pe,2: ion.1 Ereue t Esplam)

Ecibis ! Sasac Son <c t*7/77)

Il4'ther iE ss tain) s a

m

. I DOC W No.

50-318 UNIT SHUTDOWNS AND POWER ret >UC110NS gf gg y 3 4 g g. Calvert Cliffs #2 DATE 4/12/84 NTED SV - E. Be @

March 301-187-5365 REPORT MONTH TELE. PHONE

{

    • L w

C E E

  • Ih Licensee E

E*,,

Caew & Coe cetiw j

No.

Date 5i 3%sE Ewat gg h

Atium se -

$E eE 3$7 Repuet a e tw E'

Peevent Resteence

+

G e-

)

l

)

NOTE: No. 2 Unit experienced load reduction at various loads due to soisture separator reheater!

~

tube leaks.

4 t

3 4

F: Forced Reason.

Method:

Embet st C. Instemeties S. Scheduled A-Equipment Failure (Esplain) t -Manual for Feepaesteen of Dass i

B-Mainterance of Te:t 24tanual Stram.

Ensiv Sheets foe tscensee r-R:Fuet.r; 1-Avionesse scram.

Esens Repues it.E RI File tNUREC D Regulator) Resen.seun Ju00ntinu.1 tion 01634 1.-Opceator Tsaining d Lxeng Esarnisiation

$ g,g gg.g g,

F Adminntratne 4

-od.e r G Operation.1 Etsi.e tEspI4m)

Esh&e I - $ww Some l'7/77)

Il4'the r (F srlain)

?

7%

y

a.

EE 3-UNir5HUTDOWNS ANDPOWER REDUCTIONS

,, N yg I

t cliffs #2 DAE 4/12/84 NMED W E. My March 301-787-5365 REPORT MONTH TT.LifHONE "L

c E

5: l 'i

  • E$

Licensee f*

E%

Cauw & forecctiu No.

Omfe

$)

3$E Ewas

[$

$T Asti = to g2 sc 3 ;f, s Repues e in L, 5'

Peevent Recereer.w L

g 4

O i

NOTE:

No. 2 Unit experienced load reduction at various loads due to moisture separator reheater tube leaks.

t 3

4 F Forced Reason.

Metteud:

Exhit si C. inst ewetions

5. Scheduled A Equiprnent Failvec(Esplaint I Manual for Prepasavion of Data 8.Mainte asoce of Te.t 24tanual Scram.

Ents, Sheets fo IAensee f'-Re fnet.r; 1-Autonetsc Scraen.

Esens Reposi tt.ERI File tNUREC D.Negulator) Resisisseun Jacon t inuit t t on

('l6II l-Opceanor T...ning A License Esarnination

' 1.o.H Redic: ion F. Administrat ne 9-Ott.cr G4)pevainon.1 Eevi.e t Esplain)

Ecitne t $ sow 5onece l's/77)

Il4'the:(F s taint

April 4,1984 REFUELING IN!'ORMATION REQUEST 1.

Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.

Scheduled date for next Refueling Shutdown: March 23,1985 3.

Scheduled date for restart following refueling: May 26,1985 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5.

Scheduled date(s) for submitting proposed lleensing action and supporting information.

February 20,1985 6.

Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuelinserted into the previous cycle.

.7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 796 -

Spent Fuel Pools are common to Units 1 and 2

- 8.'

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any

-inercase in 1leensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830 (b)0 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present lleensed capacity and maintaining space for one full core off

. load.'

April,1991

c April 4,1984 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2, 1
2. Scheduled date for next refueling shutdown: April 21,1984.
3. Scheduled date for restart following refueling: June 10,1984.
4.. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will not require changes to Technical Specifications.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

March 3,1984

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted in the previous cycle.

[

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

'( ) 217 (b) 796 a

Spent Fuel Poolis common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capaelty, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

(a) 1830 (b)0

9. - The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off ~

load.

1 1

April,1991 I

h 1

4

. t

- 9 1

-4

~

v-m

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE MARCH 1984 3/1 At the beginning of this reporting period, Unit I was shutdown while performing planned maintenance on one Pressurizer Safety Valve.

3/6 The Reactor was brought critical at 0534 and paralleled at 1628.

3/7 Resumed full load operation (875 MWe) at 1020.

3/18 Reduced load to 722 MWe at 0009 to test Main Turbine Control Valves. Resumed full load operation (882 MWe) at 0500.

3/29 Heavy wave action caused significant quantities of grass to be dislodged from the intake structure and collect in the condenser water boxes. The resulting increase in Condenser Delta T necessitated a power reduction (440 MWe) at 0220 to clean main condenser water boxes. Resumed full load operation (880 MWe) at 0500.

3/31 At the end of this reporting period, Unit I was operating at 882 MWe with the reactor at 100% power.

L

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE MARCH 1984 3/1 At the beginning of this reporting period, Unit 2 was operating at 835 MWe with the reactor at 100% power.

3/29 Decreased load to 815 MWe at 0800 for Moderator Temperature Coefficient i

measurement.

3/31 Resumed full load operations (880 MWe) at 1650. At the end of this reporting period, Unit ;! was operating at 839 MWe with the reactor at 100%

i t

o l

e

BALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 FOSSIL POWER DEPARTMENT April 13,1984 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20055 ATTENTION: Document Control Desk Gentlemen Enclosed herewith is the March 1984 - Operation Status Report for Calvert Clif f s No. I Unit, (Docket 50-317) and Calvert Clif f s No. 2 Unit, (Docket 50-318).

Sincerely, AL4 AY E. K. Bowley

[

Economy C1erk V

Production Economy and Results Unit Fossil Power Department Enclosure cca Messrs C. McCabe, Jr.

R. Archltrol R. R. Mills L. Russell P. Ross P. Storer, Jr.

M. Beebe C. Shoemaker D. Rollly R. Ash T. Megette V. Stricklin J. Tiernan A. Lundvall W. L. Lavallee EML/bew up/(9840)

+