MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
r ,-
VIH01NIA ELuc nic Ann Powan COMPANY RICHMOND,VIHUINIA 202 61 l l
May 11, 1995 U. S. Nuclear Regulatory Commission Serial No.95-234 i Attention: Document Control Desk NL&P/JHUCMC I
Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of April 1995.
Very truly yours, h '
M. L. Bowling, Manager Nuclear-Licensing and Programs Enclosure i
cc: U.S. Nuclear Regulatory Commission '
Region ll 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 95o518o290 95o43o PDR ADOCK 05000338 R PDR
/
. i
.. <- . j VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: ADril YEAR: 1995 e
l l
l Approved:
d Station Manager
$R$
i -- -
t -
q l
l OPERATING DATA REPORT DOCKET NO.: 50-338 DATE: May 5, 1995 l CONTACT: J. A. Stall PHONE: (703) 894-2101 .
1 OPERATING STATUS '
1 Uni t N ame: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . North Anna 1
- 2. Reporting Period:......................... April 1995
- 3. Licensed Thermal Power (MWt):............. 2,893 4 Nameplate Rating (Gross MWe):............. 994
- 5. Design Electrical Rating (Net MWe) ....... 907
- 6. Maxinsn Deperdable Capacity (Gross MWe):.. 948
- 7. Maxinun Dependable Capacity (Net MWe):.... 900
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons: _N/A
- 9. Power level to which restricted, if any (Net "We): N/A
- 10. Reasons for restrictions, if any: N/A This Month Y-t-D Cumulative
- 11. Hours i n R epor t ing Per i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 719.0 2,879.0 147,755.0
- 12. Number of Hours Reactor was Critical...................... 719.0 2,857.6 111,305.4
- 13. Reactor Reserve Shutdown Hours............................ 0.0 20.9 6,951.4
- 16. Hours Generator 0n-Line................................... 719.0 2,852.8 108,306.5
- 15. Uni t R eserve Shutdown Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)...................... 2,079,473.9 8,187,253.8 288,372,833.7
- 17. Gross Electrical Energy Generated (MWH)................... 685,279.0 2,694,326.0 94,769,946.0
- 18. Net Electrical Energy Generated (MWH)..................... 652,214.0 2,564,257.0 89,766,543.0
- 19. Unit Service Factor....................................... 100.0% 99.1% 73.3%
- 20. Uni t Avai l abi l i t y F ac t or . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100.0% 99.1% 73.3%
- 21. Unit Capacity Factor (using MDC Net)...................... 100.8% 99.0% 68.0%
- 22. Unit Capacity Factor (using DER Net)...................... 100.0% 98.2% 67.0%
- 23. Forced Outage Rate........................................ 0.0% 0.9% 9.8%
- 26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_N/A
- 23. If Shutdown at end of Report Period, estimated time of Startup:_N/A
- 26. Units in Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.~. -
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit NA-1 Date:- May 5. 1995
Contact:
J. A. Stall Phone: (703) 894-2101 F
MONTH: April 1995 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 909 17 908 2 908 18 908 3 909 19 908 4 907 20 909 5 906 21 908 6 906 22 906 l 7 906 23 907 8 905 24 907 9 906 25 908 10 906 26 908 11 906 27 907 12 908 28 900 13 906 29 907 14 906 30 910 15 909 16 909 i
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I
i
- , , , NORTH ANNA POWER STATION UNIT NO.
- 1 ;
MONTH: Acril ,
SUMMARY
OF OPERATING EXPERIENCE I
Page 1 of 1 :
Listed below in chronological sequence is a summary' of operating '
enperiences for ' this month which required load reductions or resulted in significant non-load related incidents. :
.Date Time Data !
April 01, 1995 0000 Began month with unit at 100% power, 954 MWe. ;
April 28, 1995 1114. Commence rampdown to 91% power for Turbine Valve .;
Freedom Test (TVFT).
April 28, 1995 1214 Unit stable at 90.9% power, 870 MWe. ,
April 28, 1995 1310 Commence ramp. to 100% power following satisfactory completion of TVFT. i April 28, 1995 1518 Unit stable at 100% power, 945.5 MWe, l
April 30, 1995 2400 Ended month with unit at 100% power, 954 MWe. .
e i
t i
e 1
J i
s f
I
- = ,
t
-I
- s. . >. .
.j
. j C.
Page 1 of _.1
. UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet i l
Docket No.: 50-338 Report Month ADril Unit-Name: NA-1 Year 1995 Date: May 5, 1995 3
Contact:
J. A. Stall'
l
'i.i
?
i j
i
UNIT SHUTDOWNS AND POWER REDUCTIONS -
DOCKET NO.:- 50-338 UNIT NAME: NA-1 DATE: May 5, 1995 REPORT MONTH: April 1995 CONTACT: J. A. Stall.
PHONE: (703) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Dowm Reactor Report # Prevent Recurrence o No Entry This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5=Lcad Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source 4
9
. . - _ , e m.-- - _ _ _ _ _ _ _ _ _ _ _
OPERATICG DATA REPORT DOCKET No.: 50-339 i DATE: May 5, 1995 I
CONTACT: J. A. Stall PHONE: (703) 894 2101 OPERATINO STATUS
- 1. Uni t Name: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . North Anna 2 '
2.' Reporting Perlodi......................... April 1995 3.1 Licensed Thermal Power (MWt) ............. 2893
'h.
~
i Nameplate Rating (Gross MWe) ............. 979
- 5. Design Electtfcal Rating (Net MWe) ....... 907
-.6.
Maximum Dependable Capacity (Gross MWe):.. 935
- 7. Maxlaun Dependable Capacity (Net MWe):.... 887 F
' 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give ressons: _ N/A
~
- 9. Power level to bAlch restricted, If any (Net MWe): N/A
- 10. Reasons for restrictlons, If any: N/A >
This Month Y t-D Cumulative
- 11. Hours in Reporting Period................................. 719.0 2,879.0 126,023.0
- 12. NLnber of Hours Reactor was Critical...................... 0.0 1,994.0 104,927.5
- 13. Reactor Reserve Shutdown Hours............................ 0.0 1.3 6,510.2 r
- 16. Hours Generator 0n Lfne................................... 0.0 1,993.5 103,829.2 C : <". , m - l
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0 !
- 16. Gross Thermal Energy Generated (MWH) . . . . . . . . . . . . . . . . . . . . . 0.0 4,874,638.6 281,490,602.6
- 17. Gross Electrical Energy Generated (MWH). ...... .. .. .. ... ... 0.0 1,587,700.0 92,064,557.0
- 18. Net Electrical Energy Generated (MWH)..................... 0.0 1,500,859.0 88,040,827.0
- 19. Unit Service Factor....................................... 0.0%
69.2% 82.4%
- 20. Un I t A va i l ab t 1 i ty Fac t or. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0% 69.2% 82.4% !
- 21. Unit Capacity Factor (using MDC Net)...................... 0.0% 58.8% 77.6%
- 32. Unit Capacity Factor (using DER Net)...................... 0.0% 57.5% 77.0%
- 23. Forced Outage Rate........................................ i 0.0% 0.0% 5.1%
' 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): . Refueling / Steam Generator Replacement, 03/25/95, 80 days '
i i
- 25. If Shutdown at end of Report Period, estimated time of Startup: 06/16/95
- 26. Units in Test Status (Prior to Coronercial Operation):
Forecast Achieved
!NITIAL CRITICAllTY INtilAL ELECTRICITY !
COMMERCIAL OPERATION
, - - , . ~ . - - . . . -.,--.e,4 , - - - - --- -
-.g..
j AVERAGE DAILY UNIT POWER LEVEL l Docket No.: 50-339 Unit NA-2 Date May 5, 1995
Contact:
J. A. Stall Phone: (703) 894-2101 MONTH: April 1995 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Nst) LEVEL (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 ___
9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0 Instructions:
On this format, list the average daily unit power level in MWe- ;
Net for each day in the reporting month. Compute to the nearest ,
whole megawatt. l l
l l
. ,, *i -
NORTH ANNA POWER STATION UNIT NO.: 2-MONTH: ADril
SUMMARY
OF OPERATING EXPERIENCE Page.1 of 1
-Listed below in chronological sequence is a summary of operating '
experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data April 01, 1995 0000 Began month with unit in Mode 6 for scheduled Refueling and Steam Generator Replacement Outage.
- April 30, 1995 2400 Ended month with unit defueled for Refueling.
and Steam Generator' Replacement Outage.
4 e
i 5
F 8
-i-,-- --
,, ,n-,-,, .. .,e-.. . _ , - - , .. -
.m - m -
+
. J
- s:
,r . *. .
)
i' ,
Page 1 of 1 i
UNIT SHUTDOWN AND POWER REDUCTIONS '
Explanation Sheet Docket No.: 50-339 .
Report Month Anril Unit Name: NA-2 Year 1995 Date: May 5. 1995 :
Contact J. A. Stall
- 95 Unit shutdown for scheduled Refueling /SGRP outage March 24, 1995 at 2038 hours0.0236 days <br />0.566 hours <br />0.00337 weeks <br />7.75459e-4 months <br />.
h t
l r
F 9
h b
b I
P
- q DOCKET NO.: 50-339.
UNIT NAME: NA-2.
DATE: May 5, 1995-REPORT MONTH: April 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence-95-01 950325 S 720 C/H 1 N/A N/A N/A N/A 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual ' Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling '3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Snme Source t