Safety Evaluation DEC 2 91983 Supporting Amendments ik).

7__ to CPPR-126 and CPPR-127

_ Introduction ine fluclehr Regulatory connission (flRC) sothorized the construction of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 by issuing Construction Permits No. CPPR-126 and CPPR-127 to Texas dtilities Generating Compan.; (TUGCO), Dallas Power & Light Company (DP&L), Texas Electric Service Company (TESCO), and Texas Power and Light (TP&L).

Subsequently., the construction permits were amended to include the Texas Municipal Power Agency (TMPA), Brazos Electric Power Cooperative, Inc. (BEPC), and the Tex-La Electric Cooperative of Texas, Inc. (Tex-La) as co-owners.

By letter, dated August P.,1983 TUGC0 requested that the construction permits be amended to reflect a corporate reorganization which consolidates TESCO, YP&L, and DP&L into a new entity named Texas Utilities Electric Company (TVEC).

In addition, the plant operatien functions and TUGC0 personnel and plant engineering functions and personnel of Texas Utilities Services, Inc. (TUSI) will be transferred into a separate division of TUEC.

Entitlement to output will correspond to ownership shares which will be as follows:

TUEC 87 5/6%

TMPA 6 1/5%

BEPC 3 4/5%

Tex-La 2 1/6%

This safety evaluation is issued in support of Amendments Ho. 7 to CPPR-126 and CPPR-127.

It will address the resultant changes or lack of changes in the following:

1.

The design of the facility or requirements for safety-related information.

2.

The financial qualifications of the applicants.

3.

The conclusion concerning the common defense and security.

4.

The conclusions concerning the health and sa?ety of the public.

Evaluation Design of the Facility _

The staff has reviewed the application for amendments submitted by letter, dated August 2,1983 and finds no information which leads the staff to conclude that the requested amendments to the conttruction permits will result in design changes to the facility. The staff noted that the letter states

...the proposed amendments are pro forma, administrative in nature end have no safety or environmental significance-- " the, staff interprets this to be a statement of the applicants intent regarding the requested action.

8401120433 831230 FDR ADOCK 05000445 A

PDR C FFICE )

SURNAMEh oare y unc ronu sta tio-so> nacu oua OFFICIAL RECORD COPY usam mi-maa

t...

p.

DEC 2 91983 The staff.has also reviewed the reorganization submitted by the letter of August 2,1983 and finds no information which leads us to conclude that the requested amendments to construction permits will result in design changes to the facility.

In addition. TUGC0 stated in the August 2,1983 letter that the reorganizatior.

will not affect the present staffing or corporate channels of responsibility.

~for CPSES.

On the basis of its review of the applications for amendment, the staff concludes that the proposed reorganization will not result in any safety-significant design changes to the facility. Further, the staff finds that its conclusions in Section 21.0 of the Safety Evaluation Report (SER), issued September 1974 on the CPSES will not be altered by the issuance of the requested amendments.

Financial Qualifications of the Applicant Texas Utilities Electric Company will perform the utility functions of DPSL, TESCO and TP&L including filing rate cases with the Public Utility Comission of Texas to recover the costs of the generaticn of electricity. Therefore, TUEC is an electric utility as defined in 10 CFR 50.2 (x) and information regarding financial qualifications need not be provided in accordance with 10 CFR 50.33 (f).

Common Defense and Security The application states that TUEC is not owned, controlled, or dominated by an alien, foreign corporation, or a foreign government.

It further states that all of the principal officers are citizens of the United States. The applicant also agrees, in the application for amendment, that it will not allow any individual to have access to Restricted Data until the appropriate federal agencies have made an investigation and report to the tiRC on the character, associations, and loyalty of such individual and the flRC has determined that permitting such person to have access to the infccmation will not endanger the cor..on defense and security. Based on the above statement anet

'; eement, the staff concludes that the issuance of.the requested amendments

., 'he construction permits will not be ininical to the common defense and W ity. Further, the staff finds that its conclusions (7) regarding comon den...se and security in Section 21.0 of the Safety Evaluation Report for Comanche Peak Steam Electric Station, Units 1 and 2 issued September 1974 will not be altered by the issuance of the requested amendments to the construction permits.

Health and Safety of the Public Because the amendments do-not result in any safety-significant de31gn changes to the facility and the present staffing and corporate channels of responsibility

.renain the sane for CPSES, the staff concludes that the proposed amendments will not result in any changes to the conclusion in Section 21.0 of the September 1974. SER.

omce >

sunu4ue)

RATE)

NHC FORM 318 (10P) NRCM 02to OFFICIAL RECORD COPY uscmssi-mem

g

, DEC 2 91983

-Sumary of the Safety Evaluation The staff has reviewed the impact'on safety considerations of amending Construction Permits CPPR-126 and CPPR-127 to reflect a corporate reorganization to consolidate TESCO, TPSL, and DPSL into Texas Utilities Electric. Based on its review, the staff has concluded that:

1.

The requested amendments do not result in safety-significant design changes to the facility';

~2. ~The technical qualifications of the applicants will not be diminished; 3.

The proposed organization is not required to submit financial qualification information; and 4.

The requested amendnents will not endanger the common defense and security.

Based on the considerations discussed above the staff has concluded that:

(1) because the' amendments do not involve a significant increase in the probability or consequences of accidents previously considered; do not create the possibility of an accident of a type different from any previously evaluated; and do not involve a significant decrease in a safety nargin, the

_ amendments do not involve a significant hazards consideration (2) there is breasonable~ assurance that the health and safety of the public will not be endangered by operation in the proposed nanner, and (3) such activities will

'be in compliance with the Comission 's regulations and the issuance of the amendments will not be inimical to the comon defense and security or to the

~ health and safety of the public.

l$

i Spottswood B. Burwell, Project Manager B. J. Youngblood, Chief Licensing Branch No. 1 Licensing Branch Hn. 1 Division of Licensing Division of Licensing l