Deficiency Rept DER 83-56 Re Discrepancies w/Anchor-Darling Msivs.Initially Reported on 830808.Extension Until 840221 for Final Rept Requested Due to Extensive Evaluation Required
ML20083G855
Person / Time
Site: Palo Verde  
Issue date: 11/30/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28319-BSK, DER-83-56, NUDOCS 8401040366
Download: ML20083G855 (2)


Text

.

Q-S&

x F

RECEIVED s',:tf l

tmc

$3 O l-Arizona Public Service Company P O. BOX 21666 + PHOENIX. ARIZONA November 30, 1983 ANPP-28319-BSK/KCP REG 10N Vi',E U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-56 A 50.55(e) Potentially Reportable Condition Relating To Discrepancies With Main Steam Isolation Valves By Anchor-Darling File: 83-019-026; D.4.33.2

Reference:

(A) Telephone Conversation between P. Narbut and R. Tucker on August 8, 1983.

(B) ANPP-27606, dated August 22, 1983 (Interim Report)

Dear Sir:

j The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by November 30, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 21, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

{

h

/\\ LLL E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr/KCP:ru cc: See Page 2 8401040366 831130 PDR ADOCK 05000520 S

PDR t

1g97 RD

y Mr. T. W. Bishop DER 83-56 Page 2:

cc:'

- Richard DeYoung, Director Of fice of ' Inspection and Enforcement -

U. S.-Nuclear Regulatory Commission Washington, D. C. 20555 iT.-G. Woods, Jr.

G. C. Andognini

- J. ~ A. Roedel D. B. Fasnacht A.-

C.' Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D..D. Green /P. P. Klute A. C. 'Gehr W. J. Stubblefield

_ W. G. Bingham R. L.-Patterson R.-W.' Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S.-R.

Frost J. Self D. Canady Records Center Institute of-Nuclear Power Operations-1100 circle 75 P&rkway - Suite 1500 Atlanta, Georgia 30339 1

n-.-..

e

,.yg.

-e

. ~

-e.v-

..-v--

n, e--.

-m.,--

,