VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH November YEAR 1983 Y

APPROVED:

<. >I STATION MANAGER W -

8401120253 831130 PDR ADOCK 05000338 R PDR

' ' ' + pyy , , - , .~ p., , , , , - , _ , , .

r OPERATING DATA REPORT DOCKET NO. 50-338 DATE __11-04-83 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 >

OPERATING STATUS Notes: " Revised due to 1

1. Unit Name: North Anna 1 administrative

~2. -Reporting Period: October 1983 errors on line

3. Licensed Thermal Power (MWt): 2775 13, and line 22.
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907

.6. -Maximum Dependable Capacity (Gross MWe): 930

7. Maximum Dependable Capacity (Net MWe): 877
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MVa): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cuwilative
11. Hours In Reporting Period 745 7,296 46,977
12. Number of Hours Reactor Was Critical 215.9 5,006.1 32,129.1
1513 . Reactor Reserve Shutdown Hours 0 1,760.8 3,014.9
14. Hours Generator On-Line 212.3 4,832.3 31,214.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 458,553.0 12,922,810 81,123,164
17. Gross Electrical Energy Generated (MWH) 153,724 4,279,100 26,063,632
18. Net Electrical Energy Generated (MWH) 144,349 4,055,518 24,576,251 L

j 19. Unit Service Factor 28.5 66.2 66.4

, 20. Unit Availability Factor 28.5 66.2 66.4

-21. Unit Capacity Factor (Using MDC Net) 22.1 63.4 59.7 C 22. Unit Capacity Factor (Using DER Net) 21.4 61.3 57.7

23. Unit Forced Outage Rate 0 29.4 11.4 l 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage 05-25-84 1

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

l Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY _

COMMERCIAL OPERATION

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 12-04-83 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS Notes:

1. Unit Name: North Anna 1
2. Reporting Period: November 1983
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 930
7. Maximum Dependable Capacity (Net MWe): 877
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 8,016 47,697
12. Number of Hours Reactor Was Critical 713.4 5,719.5 32,842.5
13. -Reactor Reserve Shutdown Hours 6.6 1,767.4 3,021.5
14. Hours Generator On-Line 703.1 5,535.4 31,917.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,869,061 14,791,871 82,992,225
17. Gross Electrical Energy Generated (MWH) 625,200 4,904,300 26,688,832 l 18. Net Electrical Energy Generated (MWH) 593,649 4,649,167 25,169.900 l 19. Unit Service Factor 98.0 69.1 66.9 l 20. Unit Availability Factor 98.0 69.1 66.9
21. Unit Capacity Factor (Using MDC Net) 94.0 66.1 60.2
22. Unit Capacity Factor (Using DER Net) 90.9 63.9 58.2 26.0 11.1
23. Unit Forced Outage Rate 2.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Scheduled Refueling Outage 05-25-84

25. If Shut Down At End Of Report Period, Estimated Date of Startup
.

l 26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

(

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT -

NA-1 DATE 12-04-83 COMPLETED BY Joan N. Lee TELEPHONE 703-894-5151X2527 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) , (MWe-Net) 1 333 17 891 2 818 18 293 3 866 19 442 4 866 20 879 5 859 21 890 6 866 22 891 7 848 23 891 6 859 24 892 9 851 25 892 10 838 26 887 11 882 27 882 12 888 28 891 13 884 29 891 14 891 30 891 15 887 31

~

16 892 INSTRUCTIONS .

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH November UNIT NAME NA-1 YEAR 1983 DATE 12-04-83 COMPLETED BY Joan Lee 63-10 F (1) At 0645 on November 18, 1983-a rampdown of Unit I was commenced. The rampdown was due to a malfunction of the cooling fans on "C" Main Transformer. At 0815 on November 18, 1983 a manual reactor trip was initiated.

The repairs were made and re.ector start-up commenced at 1334 and by 1451 on November 18, 1983, the reactor was critical. On November 19, 1933 at 0112, Unit I was on line, and at 0425, November 20, 1983, Unit I was at 100%

power. Ended this month with power at 100%.

6 I

l I

i.

l

_ _ . - . ~ . _ . , _

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338 UNIT NAME North Anna 1 DATE 12-04-83 REPORT MONTH November COMPLETED BY Joan Lee TELEPHONE (703) 894-5151 X2527-l No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting 3

  • 4 Code 5

^" "

Down Reactor Report # Prevent Recurrence 83-10 831118 F 16.9 A 1 NA NA NA Unit I was ramped down manually and tripped due to loss of g cooling fans on "C" Main Transformer. Repairs were made and Unit was returned to 100% power.

1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administra tive 9-Other G-Operational Error (Explain)

H-Other (Explain) Exhibit H - Same Socree

[

L VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 1 MONTH November

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

DATE- TIME DATA November 1, 1983 0000 Started this month with Unit at 30% power with chemistry hold.

0620 Commenced ramping up to 100% power at 3%

per hour.

November 2, 1983 0944 Stabilizing power at 100%.

November 4, 1983 2301 Started rampdown to 850 MW for Turbine Valve Freedom Test.

November 5,1983 0115 Commencing Turbine Valve Freedom Test. Unit at 97% power - 850 MW.

0157 Turbine Valve Freedom Test complete.

0205 Commenced rampup to 100% at 3% per hour.

0700 Unit at 100% power.

( November 7, 1983 0900 Commenced ramping down at 3% per hour due to feed train problems.

1040 Holding at 95% power.

1330 Increasing power at 3% per hour until limited by FW pump suction pressure.

1415 Holding power at 98% suction pressure 315 psig.

f 2153 Commenced ramping up at 3% hour.

l .

l November 8, 1983 1030 Unit at 100% power.

November 9,1983 0847 Commenced ramping down at 3% per hr to 95%

to raise feed pump suction pressure.

l 1

L

r-November 9, 1983 0950 Stabilizing power at 96%, 880 MW. Feed pump suction is 320 - 325 psig.

November 10, 1983 2247 Commenced rampup at 3% per hour.

0640 Unit at 100% power. -

November 12, 1983 2132 Commenced rampdown to perform Turbine Valve Freedom Test at 3% per hour.

November 13, 1983 0120 Completed Turbine Valve Freedom Test. Commenced power increase to 100%.

0400 Unit at 100%.

November 18, 1983 0645 Commenced rampdown due to loss of "C" main transformer cooling fans.

0815 Manually tripped reactor due to malfunction of "C" main transformer cooling fans.

0951 Reclosed reactor trip breakers.

1334 Commenced reactor start-up.

1451 Reactor critical.

November 19, 1983 0112 Unit 1 on line.

0245 Holding at 250 MW approximately 30% power for chemistry.

0528 Commenced rampup to 100% at 3% per hour.

November 20, 1983 0425 - Unit at 100% power.

l November 26, 1983 2102 Commenced rampdown at 3% per hour for Turbine l Valve Freedom Test.

2345 Stabilizing at approximately 855 MW.

! November 27, 1983 0045 Turbine Valve Freedom Test complete.

L 0055 Commenced rampup to 100% at 3% per hour.

! 0459 Unit at 100% power.

November 30, 1983 2400 Ended this month with Unit at 100% power.

t i

i 2

l - -_ ._. . - - _ -_- _ - _ - - . - . _ _ _ _ , . - ,

V OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-04-83 COMPLETED BY Joan Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS Notes

-1. Unit Name: __ North Anna 2

2. Reporting Period: November 1983
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. . Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A -

9. Power Level To Which Restricted, If Any (Net NWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 8,016 25,968
12. Number of Hours Reactor Was Critical 720 6,481.2 18,924.3
13. Reactor Reserve Shutdown Hours 0 1,753.4 3,752
14. Hours Generator On-Line 720 6,338.4 18,791.1
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,992,940 16,782,838 48,508,858
17. Gross Electrical Energy Generated (MWH) 658,720 5,505,019 16,094,332
18. Net Electrical Energy Generated (MWH) 626,592 5,214,455 15,264,073
19. Unit Service Factor 100 79.1 72.4
20. Unit Availability Factor 100 79.1 72.4
21. Unit Capacity Factor (Using MDC Net) 97.8 73.9 66.5
22. Unit Capacity Factor (Using DER Net) 96.0 71.7 64.8
23. Unit Forced Outage Rate 0 5.3 16.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Scheduled Maintenance Outage 03-17-84

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
25. Units In Test Status (Prior to Commercial Operation): -

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

f-~

h AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT ~ NA-2 DATE 12-04-83 COMPLETED BY J. N. Lee TELEPHONE 703-894-5151X2527 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 872 17 872 2 872 18 870 3 874 19 871 4 872 23 869 5 872 21 870 6 868 22 870 7 873 23 872 8 873 24 875 9 872 25 838 10 873 26 874 11 873 27 864 l

12 871 28 873

! 13 868 29 874 i 14 870 30 875 15 867 31 16 872 INSTRUCTIONS l

On this format, list the average daily unit power level in MWe-Net for each l

day in the reporting month. Compute to the nearest whole megawatt.

I

lr Page 1 of 1

. UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH November UNIT NAME NA-2 YEAR 1983 DATE 12-04-83 COMPLETED BY Joan Lee No entries this month ,

.,,-r ----,.,--w.- - . , . - . - - - - . - ,,-r..---,- --,. - . m .-. - - - . -- .--

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NC. 50-339-UNIT NAME North Anna-2 DATE 12-04-83 REPORT MONTH November COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 No. Date TypeI . Duration Reason Method of Licensee System Component Cause & Corrective

^**I "

(Hours) Shutting 3

Down Reactor Report #

  • 4 *5 Prevent Recurrence 83-25 831124 0 H S NA NA NA Rampdown for load following.

Unit returned to full power.

i l

l s

1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) Fil'e D , Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F- Administrative 9-Other 5 G-Operational Error (Explain)

H-Other (Explain) Exhibit H - Same Source

~

,.s - -

~ 7%. VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 2 y

c MONTH November /

~

SUMNkRYOFOPERATINGEXPERIENCE

.- c Listed below in chronological sequence-is a summary of operating experiences for this month which required , load reductions or resulted in significant non-load related incidents.

DATE TIME DATA November 1, 1983 0000 Started this month with Ur.it at 100% power.

November 6, 1983 0005 ~ commenced rampdown ito 860 MW for Turbine Valve Freedom Test:. ,

0152 Complet'ed Turbine Valve Freedom Test, increasing power to 100%.

0230 Unit at 100% power.

November 12,.1983 2335 Commenced rampdown for Turbine Valve Freedom -

Test.

2352_ Holding at 872'MW.

November 13, 1983- 0055 Completed Turbine Valve Freedom Test.

i 0100 Commenced rampup to 100%.

l 0117.! Unit at 100% power.

I November 20, 1983 0019 Commenced unit rampdo'wn for Turbine Valve j Freedom Test.

l-0038 Holding power at approxicutely 865 MW for Turbine Valve Freedom Test.

0015 Turbine Valve Freedom Test complete sat.

l Commenced rampup to 100% power.

0150 Unit at 100% power.

! November 24, 1983 2353 Commenced rampdown for load follow.

1 1

v;

( ...

~

l I , . ,

November 25, 1983 0057 Holding power at 81% approximately 780

<. MW per System Operator.

0648 Completed load following commenced power increase to 100%. .

0655 Unit at 100% power.

November 27, 1983 0004 Commenced rampdown for Turbine Valve Freedom Test.

0028 Holding at approximately 860 MW.

0048 Commenced Turbine Valve Freedom Test.

0343 Turbine Valve Freedom Test complete, commenced rampup per System Operator.

'< 0419 Unit at 100% power.

November 30, 1983 2400 Ended this month with Unit at 100% power.

f 4

2

i VIHoIn1A ELECTRIC AND POWER COMPANY t- Ricunown, VIRGINIA 20L61 t

U5v.i.sfBWANT Vica Passionwr NUCLEAM OramAnone December 14, 1983 Mr. N. M. IIaller, Director Serial N . 709 Office of Management and Program Analysis N0 /JllL: acm U. S. Nuclear Regulatory Commission 20555 Docket Nos. 50-338 Washington, D. C. 20555 50-339

~L icense Nos. NPF-4 s

s .

( NPF-7

Dear Mr. Italler:

Enclosed iis the Monthly Operating Report of North Anna Power Station Unit Nos.

I and 2 for the month of November, 1983.

m Very truly yours, t

S j i L , 3% vh

> W. L. Stewart Enclosure (3 copies) cc: Mr. R. C. DeYoung, Director (12 copies)'-

Office of Inspection and Enforcement s Mr. James P. O'Reilly (1 copy)

Regional Administrator Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station 67 i ,s