ML20083D827

From kanterella
Jump to navigation Jump to search
Amend 155 to License DPR-16,revising Tech Specs,Table 4.15.2,items 2.a & 3.a Re Channel Functional Test Requirements for Main Stack & Turbine Bldg Vent Radioactive Gaseous Effluent Monitoring Sys
ML20083D827
Person / Time
Site: Oyster Creek
Issue date: 09/18/1991
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Jersey Central Power & Light Co, GPU Nuclear Corp
Shared Package
ML20083D830 List:
References
DPR-16-A-155 NUDOCS 9110010275
Download: ML20083D827 (5)


Text

. _....

en arog e

o UNITED STATES l'

'n NUCLEAR REGULATORY COMMISSION 3n i

W ASHINGTON. D. C. 20555 9

gw.....f GPil FUCLEAR COMORA110tl App JERSEY CEt! TRAL PCiER & LIGHT COMPANY DOCKET NO. 50-219 OYSTER CREEK t!,UCL, EAR,GEpER,ATipG S,TATI,0N Af'Eh0 MENT TO FACILITY CPERATING LICENSE Amendment No. 155 License flo. DPR-16 1.

The Nuclear Regulatory Corraission (the Commission) has found that:

1 A.

The application for amendment by GPt' !!uclear Corporation, et al.,

(the licenfee), dated April 25, 1991, complies with the standards I

and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR l

Chapter I; I

B.

The f acility will operate in conformity with the application, I

the provisions of the Act, and the rules and regulations of the Commission; l-C.

There is reasonable assurar:ce (i) that the activities authorized by this an.endment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9110010275 910910 PDR ADOCK 0500 9

P

2-1 2.

Accordingly, the license is aoended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(?) af Facility Operatir.g License flo. OPR-16 is hereby arrtrded to read as follows:

(2) Technical Sp,ecif_ications The Technical Specifications contained in Appendices A and E, as revised through Amendment No.155, are hereby incorporated in the license.

GPU Nuclear Corporation shall operate the f acility in acccidance with the Technical Specifications.

2.

This license amendment is effective as of the date of issuance, to be implenented within 30 days nf issuance.

FOR THE NUCLEAR REGULATORY COMMISS10t1

~

i Joh F. Stoir, Direct I@ Pro ect Directorate 1-4,Wision of Peactor Projects - 1/11 Office of I;uclear Reactor Regulation

Attachment:

Chariges to the Technical Specifications Date of Issuance: September 18, 1991 w..

ATTACHMEt;T TO LICEtiSE At'E! Dt1E.t 1. t:0 155

.F.A.C.i.t.I.TY..O.P.E.P.A.T.i.t.G..l. l.C.E.tl.5. _E. t!0. DP R-16 00CKE1 110. 50..719 Poplace the foll(ming reges of the Apperdix A Technical Specifications with the enclosed pages as indicated.

The revised pages are identified by an4r.dr'ent nur.ber and contain verticci lines indicating the areas of change.

Perove Insert Table 4.15.2 Table 4.15.2 Table 4.15.2 tiotations Table 4.15.T t'otations c

7 l

TABLE 4.14tR 1

RADIOACTIVE LIQUID EFFLUENT MONITORINO INSTRUMENTATION SURVEILLANCE REQUIREMENTS CRANNEL j

CHANNEL SOURCE CHANNEL FUNCTIONAL SURVEILLANCE INSTRUKENT CHECK CHECK CALIBRATION TEST REQUIRED" 9

1.

Main Condenser D

N/A Q

M c

Offgas Treatment System Hydrogen Monitor 2.

Main Stack Monitoring System f

h l

a. Radioactive D

M 1/24 Q

b Noble Gas Monitor (Low Range)

b. Iodine Sampler W

N/A N/A N/A b

c. Particulate W

N/A N/A N/A b

Sampler

d. Effluent Flow D

N/A 1/24 Q

b Measuring Device

e. Sample Flow D

N/A R

Q b

Measuring Device 3.

Turbine Building ventilation Monitoring System f

I

a. Radioactive D

M 1/24 Q

b Noble Gas Monitor (Low Hange) b.

Iodine Sampler W

N/A N/A N/A b

c. Particulate W

N/A N/A N/A b

Sampler

d. Effluent Flow D

N/A 1/24 Q

b Measuring Device

e. Sample Flow D

N/A R

Q b

Measuring Device 4.

Offgas Building Exhaust Ventilation Monitoring System f

a. Radioactive D

M R

Q*

b Noble Gas Monitor

b. Iodine Sampler W

N/A N/A N/A b

Cartridge

c. Particulate W

N/A N/A N/A b

sampler

d. Sample Flow D

N/A R

N/A b

Measuring Device Leaends S = once per 12 hrs; D = once per 24 hrs; W = once per 7 days; M = once per 31 days; O = once per 92 days; SA = once per 184 days; R = once per 18 mos; S/U = before each reactor startup; P = completed before each release; N/A = Not Applicable.

1/24 = once per 24 months Amendments 137, 145, 155

TABLE 4.15 3 NOTAT80NS i

a.

Instrumentation shall be OPERABLE and in service except that a channel may be taken out of service for the purpose of a check, calibration, test or maintenance without declaring it to be inoperable.

b.

During releases via this pathway.

c.

During main condenser offgas treatment system operation.

d.

During operation of the condenser air ejector.

e.

The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:

1. Instrument indicates measured levels above the alarm setpoint.
2. Instrument indicates a downscale failure.
3. Instrument controle not set in operate mode.
4. Instrument electrical power loss.

f.

The CHANNEL CALIBRATION shall be performed according to established station calibration procedures.

g.

A CHANNEL CALIBRATION shall include the use of at least two standard gas samples, each containing a known volume percent hydrogen in the range of the instrument, balance nitrogen.

h.

The CHANNEL FUNCTIONAL TEST shall also demonstrate that control toom alarm annunciation occurs if any of the following conditions exists:

1. Instrument indicates measured levels above the alarm setpoint.
2. Instrument indicates a low countrate/ monitor failure.
3. Switch Cover alarm shall be verified to alarm when the cover is opened; and clear when the cover is closed after the faceplate switches are verified in their correct positions,
i. The CRANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions existsi
1. Instrument indicates measured levels above the alarm setpoint.
2. Instrument indicates a low countrate/ monitor failure.

Amendments 108, 155

~