M V NIAGARA R UMOHAWK NIAGARA ISONAWK POWER CORPORAT10N/300 ERIE BOULEVARD WEST SYR.ACUSE N.Y.13202/ TELEPHONE (315) 474-1511 SAMUEL F. MANNO VIC3 PRESIDENT NUCLEAR CONSTRUCTION December 7, 1983 (7792)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs i
631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
The final report in accordance with 10CFR50.55(e) concerning Kerite control cable will be submitted to the Nuclear Regulatory Commission by l
January 31, 1984, rather than December 15, 1983, as previously committed.
l This extension was granted via telecon between Mr. T. Lcomis (Nine Mile Point l
Unit 2 Licensing) and Mr. R. Gallo of your staff on November 28, 1983.
I Very truly yours, f
\\/
l S.
. Manno SFM/TL:ja xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. Gramm, Resident Inspector I
l b8 8312230071 831207 gDRADOCK 05000410 PDR