Interim Deficiency Rept Re Kerite Control Cable.Final Rept Will Be Submitted by 840131,not by Previously Agreed Upon Date of 831215
ML20083C340
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/07/1983
From: Manno S
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.553, 10CFR-50.553, 772, NUDOCS 8312230071
Download: ML20083C340 (1)


Text

M V NIAGARA R UMOHAWK NIAGARA ISONAWK POWER CORPORAT10N/300 ERIE BOULEVARD WEST SYR.ACUSE N.Y.13202/ TELEPHONE (315) 474-1511 SAMUEL F. MANNO VIC3 PRESIDENT NUCLEAR CONSTRUCTION December 7, 1983 (7792)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs i

631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

The final report in accordance with 10CFR50.55(e) concerning Kerite control cable will be submitted to the Nuclear Regulatory Commission by l

January 31, 1984, rather than December 15, 1983, as previously committed.

l This extension was granted via telecon between Mr. T. Lcomis (Nine Mile Point l

Unit 2 Licensing) and Mr. R. Gallo of your staff on November 28, 1983.

I Very truly yours, f

\\/

l S.

. Manno SFM/TL:ja xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. Gramm, Resident Inspector I

l b8 8312230071 831207 gDRADOCK 05000410 PDR