b TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. T ENN ESSEE 37401 400 Chestnut Street Tower II nq DEC16 A10 : 57 Decemter 14, 1983 BLRD-50-438/82-78 BLRD-50-439/82-72 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - IMPROPER USE OF ALTERNATE ANALYSIS ELBOLETS - BLRD-50-438/82-78, BLRD-50-439/82 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on November 18, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8231. This was followed by our interim reports dated December 17, 1982 and March 22, 1983. Enclosed is our third interim report. We expect to submit our next report by August 31, 1984.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
I Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills Manager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Records Center (Enclosure)
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8312200110 831214 PDR ADOCK 05000438 OFlf IM.mPV S
[;h23
- I 1983-TVA SOTH AN NIVERS ARY An Equal Opportunity Employer
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 IMPROPER USE OF ALTERNATE ANALYSIS FOR ELBOLETS NCR BLN BLP 8231 BLRD-50-438/82-78, BLRD-50-439/82-72 10 CFR 50.55(e)
THIRD INTERIM REPORT Description of Deficiency During design review, it was discovered that Bellefonte alternate analysis calculation BLN-KC-D053-11, which concerns the Component Cooling System, contains an elbolet. The Bellefonte Nuclear Plant Alternate Criteria for Piping Analysis and Support (CEB 76-11), which is the basis for this calculation, excludes any component from its scope which is not specifically listed in appendix E (Stress Intensification Factors).
Elbolets are not listed.
Interim Progress All cases where piping containing an elbolet was qualified by the Bellefonte Nuclear Plant Alternate Criteria for Piping Analysis and Support have been identified. In each case, the piping is being rerouted to eliminate the elbolet and the analysis is being revised to reflect the new pipe route.