ML20082U721

From kanterella
Jump to navigation Jump to search
Suppl to Application for Amend to License NPF-7,revising TS 6.9.1.9, Core Operating Limits Rept
ML20082U721
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/16/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082U725 List:
References
NUDOCS 9109200316
Download: ML20082U721 (3)


Text

W c.

lhdc IWi Gmrain At S h< wn j

' Aucleur 1%Iu:iwa ik ri ih e N onirnt t

l'Il flat 1%"

%i:e 0;rvu%n:

Char!rne, \\ i:iDi'i,W iN1%3.Wi DUKEPOWER September 16, 1991 U.-S. Nuclear Regulatory Commission ATTN: Document Control Desk 4

Washington, D.

C.

20555

Subject:

McGuire Nuclear Station, Unit 1 Docket Number 50-369 Cycle 8 Reload Submittal; Supplement By letter dated June-26,-1991, Duke Power Company submitted the

+

McGuire Unit-1 Cycle _8 -reload report.

This report contains Technical Specificacion changes which are required to startup Cycle 9

8.

Attached _is a

supplement to the revision to Technical i]';

Specification 6.9.1.9, as submitted by the June 26, 1991 letter.

3z Technical Specification 6.9.1.9 (Core Operating Limits Report)

,. m

'contains a - list cf Topical Reports which document methodologies K '

_used to develop cycle-specific variables. This supplement adds two

-~

Topical Reports to the listing.

These Topical Reports-are

' currently under review by the NRC staff.

During the course of the review -of ;the reload submittal and its contributing components,

.(Technical. Specifications, Topical Reports, FSAR mark-ups) it was

' (determined that inclusion of these Topical Reports in TS 6.9.1.9 would be. appropriate.

Please note that this' Technical' Specification amendment request is required' for the startup of McGuire Unit 1 Cycle 8,

which is scheduled-for-early. December, 1991. If there are any concerns identified'during the review please notify us-as soon as possible, s'o that-we may assist-in resolving them in a timely manner.

If there are any questions, please call Scott Gewehr at (704) 373-

-7581.

Very'truly yours, L

,gw

.M.

S. Tucknan rrsupp/ sag--

--: g 0 9 2 0 0 3 1 6 9 1 0 9 1 6 DR-ADOCKOSOOg9 g

7,'

h

U. - S. Nuclear Regulatory Commission June 26, 1991 Page 2 cc:

Mr. T.

A. Reed, Project Manager Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission Mail Stop 9H3, OWFN Washington, D.

C.-

20555 Mr.

S.

D.

Ebneter, Regional Administrator U.S.

Nuclear Regulatory Commission - Region II 101'Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 Mr.

P.

K.

Van Doorn Senior Resident Inspector McGuire Nuclear Station Mr. Dayne Brown, Chief Radiation Protection Branch Division of racility Services Department

'~ 'n Services 701 Barbout

+i Raleigh, Nors

.olina 27603-2008 l

n Attachment I Technical Specification 6.9.1.9 Supplement (Changes to June 26, 1991 submittal indicated by vertical line in right margin) 4

_ _ _ _ _ _ _ _