Forwards Amend 4 to Fsar,Consisting of Info Re Conformance W/Srp & Incorporating Mar-Nov 1983 Responses to NRC Requests for Addl Info
ML20082U594
Person / Time
Site: Satsop
Issue date: 12/06/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML20082U596 List:
References
GO3-83-925, NUDOCS 8312190070
Download: ML20082U594 (3)


Text

_

Washington Public Power Supply System Box 1223 Elma, Washington 98541 1223 Go6)482-4428 Docket No. 50-508 G03-83-925 December 6, 1983 Director of Nuclear Reactor Regulation Attention: Mr. G. W. Knighton, Chief Licensing Branch No. 3

(

Division of Licensing US Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

NUCLEAR PROJECT 3 AMENDMENT 4 TO THE FSAR

References:

a) Letter #G03-83-248, G. D. Bouchey to G. W. Knighton, dated March 24, 1983 b) Letter #G03-83-333, G. D. Bouchey to G. W. Knighton, dated April 20, 1983 I

c) Letter #G03-83-482, G. D. Bouchey to G. W. Knighton, dated June 16, 1983 d) Letter #G03-83-561, G. C. Sorensen to G. W. Knighton, dated July 15, 1983 e) Letter #G03-83-711, G. C. Sorensen to G. W. Knighton, dated September 2, 1983 f) Letter #G03-83-720, G. C. Sorensen to G. W. Knighton, dated September 8, 1983 g) Letter #G03-83-834, G. C. Sorensen to G. W. Knighton, dated November 3, 1983.

Pursuant to 10CFR2.101(a) and in accordance with the guidance contained in Generic Letter 82-14, the Washington Public Power Supply System (Supply System) is filing herewith sixty (60) copies of Amendment 4 to the FSAR for Nuclear Project 3 (WW-3).

This amendment contains supplemental information pertaining to the WNP-3 Review for Conformance with the Standard Review Plan (SRP) NUREG-0800, as required by 10CFR50.34(g). Also included is the material presented earlier in References a) through g) which transmitted marked up FSAR pages in re-sponse to NRC Requests for Additional Information.

8312190070 831206 PDR ADOCK 05000508

\\

K PDR

G. W. Knighton Page 2 NUCLEAR PROJECT 3, AMENDMENT 4 TO THE FSAR Finally, this amendment includes material intended to update the design and organizational descriptions and correct typographical errors.

Should you require further information or clarification, the Supply System point of contact for this matter is Mr. D. W. Coleman, Licensing Project Manager i

(206-482-4428 Ext: 5436).

Very truly yours, G. C. Sorensen Manager Regulatory Programs AJM/tn cc: JA Adams NESCO w/o WG Albert NRC w/o P Christofakis Ebasco w/o NS Reynolds D&L w/o I

D Smithpeter BPA w/o A Vietti NRC w/o Ebasco Elma w/o

. WNP-3 Files w/o i

o s

.=w e.

.-m-r

,n-en

,e---

-,,, - - - p y-,

4-w cmp _,-,, ~

v,, ----

3

STATE OF WASHINGTON)

Subject:

WNP-3 FSAR Amendment #4 ss COUNTY OF BENTON I G. C. Sorensen, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs for the the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowl-edge, information and belief the statements made in it are true.

A

,1983 DATED l(

l Q

+G. C. Sorensen, Manager Regulatory Programs On this day personally appeared before me G. C. SORENSEN, to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes there-b in mentioned.

GIVEN under my hand and seal this

.2.

day (T h e= % _-_ O 1983.

t d E.

W-A r i n A fiotary Public Qn and for the State of Washington Residing atJ.$85 M. h a 4

% Mwed 24x 8 5, N.