_

}

l

)

x DPERAllNS DATA REPORT 4

DOCrET NO

~50-=13 De I hpt der 13. 1991 t

._OFERATINS STATilS CDMPLETED BY R.A. Willitti,,,,

2 TELEPHONE 704-373 5987

! DutRase: Catamba 1

~2i Reprting Period: August 1,- 1991-Av;ust 31,1991

3. Licensed Ibersal Poner (NWt):

3411-4'.NineglateRating(StossNKeli 13055-Notes thaseplate Rating

'5.telignElectricalRating(NetMWe):

1145 (6 tots He) calculated as

6. Masieue Dependable Capacity (Bross MWeh 1192 1450.000 WA

.90 pcmer

17. Manicus Dependable Capacity (Net MWelt _

1129 factor per Page til,

- 8. If Changes Dccur in Capacity Ratings (Iteas heber 3 Through 7) Since test-W E6-0020.

'Regrt.-6iveReasens:-

_J

-9. Power Level le Which Restricted, If Any (Net MWe):

10. Reason For Restrictions, If anp This Morth Yr.-to-Dat?-

Cuaulative.

11. Hours in Reporting Period 76.0 M11'.0 5i120.0
12. Esser Df Hours !tratter Was Co tical 732.2 3495.7 39513.4

~13. Reactor Reserve Shutdcwn Hours

--0--

--0--

--0--

,14. Hours Generator On-Line 722.1 33H,9

-38524.9 15' Unit Feserve thutdown Houra-

-+-

' - 16. Bron Thersal Energy Senerated (NH) -

2414337 10542198 123B4?942.

17. Eress Electrical; Energy Generated (NH) 648149 3?06333 43470867
19. Net Electrical Energy Senerated (MW)

_B0217!

3450221 4071M50

~19. Unit Service Facter 97.1 57.7 71.2

-20. Unit Availability Factor 97.1 57.7 71.2 -

21. Unit Capacity Fa: tor (Using MDC Net!

?$.5 52.4 66.3 E2.-Unit Capacity factor (Using DER Net) 51.?

-65.7-

'23. Unit Forced Outage Rate 2.9 5.7 -

12.1

__24. Shutdoun Scheduled Over Next_6 Months IType, Date, ud Duration of Ea:hh' j'

'~

- None --

g

-25. If Shut Dcwn At End Of Report Ferted, Estisited Date of Starta s.

I

_.26. Units.In Test Status (Prior to Ccasercial Operation, Forecast A:nieved l :--

INITIAL CRITICALITY-l s.

INITife ELECTRICin -

I?

COMMERCIAL 0FEFATION 9109170220.910913 PDR ADOCK 05000413 R

PDR-l i-~u

... ~.

. ~.

. - - ~

.~-... -..

.... - -.. -.. - ~ - -,, ~ - -

..-. ~. -.... -.

J

.[

_s-

- :s s i

Of(RAT!NG DATA FRORT -

L g

5 D00 El NO 50-413-

'LHII-Estada 1 DATE ferteeer 13. [9.1L COMPLETE 0 CV R.A, Willhet IELEPHONE 704 373 $987 t

-ECNTH-Aurust. 1991 E-AVERASE IAILY KWER LEVEL M1 AVERASE LAILY F0WER LEVEL We-Net)

IMWe-Net) 1 1130-17

'I!34

' 2-11?! '

1E 1133-

_:3'-

1119

9 JUI 4_ _

ll20 20 1106

'5 1123 21 15 i

6 1110 22' 692 7

1130-23 1133

~

.8-1191 24 li33

~

-9 1130 25 1151

_10 _ '

!!05 26 UL 11:

112B '

- 27 1134 12 1132-28 11S3 13 J 1132 29 1132

14 1132-30 1135 15 1135

- 31

!)34

. 14

!!36-l~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

5C-413 UNIT NAME CATAwuA 1 DATE uv/13/ v1 REPORT MONTH August 1991 COMPLETED BY s.

w.

Musta TELEPHONE

( / v4 J -J i a-:> / dz (1)

A) flEt-(2 (31 (4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 10 91-8-21 F

21.72-A 1

CG VALVEX.

REACTOR COOLANT S'ISTEM LETDOWN ISOLATION VALVE FAILED CLOSE I

(1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)

S Schedulcd 1-Manual for Preparation of, Data 2-Manual Scram Entry' Sheets For Licensee C-Refueling 3-Automatic Scram Event Report jLER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-OA61)

E-Operator iraining & License Examination F-Administrative (5)

H-Other (Explain) (Explain)

C-Operator Error Exhibit I - Same Source

i'~

DOCKET No:

50 413 UNIT:

Catawba 1 DATE:

9/13/91 NARRATIVE

SUMMARY

MONTH:

August 1991 Catawba Unit 1 began the month of August operating at 100% full power.

The unit operated at or near 100% full power until 2000 on 08/20, when.

a unit shutdown was commenced to repair an air line to the actuator on the reactor coolant system letdown isolation valve '1NV-1A'.

The unit was taken_off line at 0346 on 08/21. The unit was returned on-line at 0129 on 08/22,-and: reached 100% full power at 2053 on 08/22.

The unit operated at 100% full power for the remainder-of the month.

Prepared by:

S. W. Moser Telephone:

704-373 5762 4

~

MONTHLY REFUELING INFORMATION REOUEST i

1.

Facility name: Catawba. Unit 1 2.

Scheduled _next refueling shutdown: June 1992 3.

Scheduled restart following refueling: Aucust 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T. S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations (new or different design or supplier, _unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 235 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase:

-9.

Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE: ERPlember 13, 1991 Name of

Contact:

J.

A. Reavis Phone:

704-373-7567

, _.. g a

l 1

c OPERATINS DATA REf0RT DOCIET NO 50-414 1

DATE Sectester 13,1991

-OPERATINB STAit's COMPLETEDSY R.A. Willipes-l TELEPHDNE' - 704-373 5987-1 = Unit hase: Catanta 2

-2. Reporting Period August 1, 1991-August 31,1991

. 3. Licensed Thereal Fower (MWt):

3411

4. Nateplate Pattrig (Bress MWe):

13051 Notes #Nastplate Rating

5. Design Electrital Rati.ng (Net Me):

1A5 (Gross Mel calculated as

6. Maxteus Dependable Capacity (5 ess ?We h 1192

- 1450.000 WA 90 peser E7. Maxieus Dependable Capacity (Net We):

1129 facter per Page ill, B. If Changes Occur in Capacity Ratings (items Nusber 3 Through 7) Since Last NLfRE6-0020.

Report. Give Reasons

19. Power Level To Which Restricted,Lif Any (Net Ne):

-10. Reason For_ Restrictions,-if any -

This Month Yr.-to-Date Coeulative Ell. Hours In Reporting Fetted 744.0 5831.0

-44136.0

12. Number Of Hours Reacter Was Critical 744.0 5570.0 33168.7
13. Reactor Reserve Shutdonn Hours

--0--

--0--

--0--

14.-hours Benerator On-Line 744.0 5536.5 32477.5

15. Unit Resene Shutdown Hours

--0--

--0--

--0--

-~16. Bross Thereal Energy Benerated ( WW1 2503357 18395563' 101764663 17; Gross Electrical Energy Generated (MWH)

E35201.

6527228 3%?0653

18. Net Ele:trical Energy Generated (MWU -

839726 6179559 33762172

19.UnitServiceFattor 100,0~

95.0 73.6-

20. Unit Availability facter.

100.0 95.0 73.6

21. Unit Capacity Facter (Using MDC Net)-

100.0 93.9 67,5

22. Unit Capacity factor tusing DER Net) 98.6 92.6 64.8

' 23. Unit Forced Outage Rate 0.0 3.3 12.9

24. Shutdown Scheduled Dyer Next 6 Months (Type Date and Duration of Each):'

Refueling - October 18,1491,9 weeks 25.'!f Shut Down At End 01 Report Period. Estimated Date of Startup:

i 26._ Units-In Test Status (Prior-to Cos$ercial Operatioo t Forecast Achieved'

-INITAAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OFEPATION

. A_ ;

OPEFATINS LATA REPORT y

~

DOCIET NO 50-414 UNil Catada P DATE Septesber 13. 1991 COMPLETED BY R.A. Willigu

- TELEFh0NE 704-373-5987 i

[-

MONTN Auaust. 1991

.p

- A'VERA6E DAILY POWER LEVEL RAI A'iERABE DAILY POWER LEVEL

[11 F

(Ne-Net) _

(Ne-Net)

J=

4

}-

L1-1131 -

17 1130 4

-2 1131 IB 1131 3

1126 19 1128 s-i-

{

'4" 1121 20

!!33 51-

!!E9 --

21 1134 1

6

!!?7 22

'!136 i-t 7

1127 ~-

23

--1133

'S 1127 24 1109

'9 1126 25 1129 r

10

!!28 26

-1132 11 '

'1131 27 1130

'12:

~

!132-29 1127

- 13 1134 29 1125

-~ 14 -

1132 30 1126 15 '

,1133 31.

I127

- 16 1186 Pw-tq-

  • cv--=:3MSt--M=*$ rtK' W + m T' W"$-*r'--7 4T

'F*-*NP'f*"9W T'

%DTW9'I7*i

4

. UNIT SHUTDOWNS ~AND POWER' REDUCTIONS DOCKET NO.

50-414 UNIT NAME CATAwisA z DATE v'3/13/ 91 REPORT MONTH August 1991 COMPLETED BY s.

w.

Must;x TELEPHONE

(/ue)-J/J-aidz (1) 2)

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P

. DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS H

R/X

' NO. -

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason

  • Method:

Exhibit G - Instructions A-EquimentFailure{ Explain)

EntW Sgaration of, Data S Scheduled 1-Manual for Pre B-Main enance or tes 2-Manual Scram eets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restrictiory 4-Other (Explain)

File (NUREG-Ol61))

E-Operator Training 0: License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

~ -

".y*

e d

i DOCKET NO:

50 414 UNIT:

Catawba 2 t

DATE:

9/13/91 i

f NARRATIVE JUMMARY a

MONTH: l August 1991

-l

- Catawba Unit 2 began the month of August operating-at 100% full power, j

The unit operated at or near 100% full power for the entire month, F

i and ended the month operating at 100% full power.

l

)

i b

b i

4 Ih I

i I

i P

I Prepared by:

S. W. Moser Telephone:

704-373-5762

[

t I

b i

i I

m s.

=

a

A

.+

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: _ Catawba. Unit 2 2.

Scheduled next refueling shutdown:__Q_ctober 1991 c

3._

Scheduled restart following refueling: December 1991 THE PROJECT MANAGER 1: AS BFRN AD',ISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. - THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED.IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations (new or different design or supplier, unroviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 204 8.

Present licensed fuel pool capacity:_J311 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: September 20LL_

DUKE POWER COMPANY DATE: September 13, 1991 Name of

Contact:

J.

A Feavis Phone:

704-373-7567

-