TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 1,00 est t,S et Tower II
~
December 5,1983 BLRD-50-438/82-20 BLRD-50 1839/82-18 U.S. Nuclear Regulatory Coinnission Region'II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - OMISSIONS TO AUXILIARY FEEDWATER PUMP DRAWINGS - BLRD-50-438/82-20, BLRD-50-439/82 SIXTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Intpector R. V. Crlenjak on February 25, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8207 This was followed by our interim reports dated March 25, July 20: Saptember 7, and December 14, 1982 and April 6, 1983 Enclosed is our sixth interim report. We expect to submit our next report by November 21, 1984.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills Manager Nuclear Licensing Enclosure-cc (Enclosure):
Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 q
OFFICIAL COP 3;
/j[.[
B312130369 831205 PDR ADOCK 05000438 g
S PDR In 1983-TVA SOm ANNIVERSARY An Equal Opportunity Employer
e
~
4 ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 OMISSIONS TO AUXILIARY FEEDWATER PUMP DRAWINGS NCR BLN BLP 8207 10 CFR 50.55(e)
BLRD-50-438/82-20, BLRD-50-439/82-18 SIXTH INTERIM REPORT
~
Description of Deficiency The auxiliary feedwater ( AFW) pumps were purchased without vent, drain, and turbine bearing cooling water interconnecting piping.
Connections to the pumps and turbines were supplied by the respective manufacturers with the understanding that TVA would provide the necessary piping design drawings and materials to meet TVA's and.the pump specifications. The vents,' drains, and turbine bearing cooling -
water interconnecting piping were not designed.
Interim Progress The auxiliary feedwater pump vents, drains, and turbine cooling water interconnecting piping is currently under analysis (problems N4-1(2)CA-I,
-J, and -K) for seismic qualification. As a result of the preliminary analysis, physical drawings (3BWO418-CA) and design criteria diagrams (DCD) (3BWO618-CA) are being revised.
S
)