ML20082R851

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 6.5.1.2 Re Composition & Quorum Requirements for Station Operating Review Committee
ML20082R851
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/10/1991
From:
Public Service Enterprise Group
To:
Shared Package
ML20082R849 List:
References
NUDOCS 9109160274
Download: ML20082R851 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ - _ _ _

+

ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The 50RC shall be composed of the:

Chairman: General Manager -

  • Hope Creek Ope'ratiorrs Member and Vice Chairman Operations Ma'1ager ys vece Member and Vice Chairman: Technical Manager c y m,,,.n MembeW Maintenance Manager Member: I "**d * *ffl >Hr-4 Enginese Member: [p A icall FSystees Engineer Member: Radiation Protection / Chemistry Manager Member: Radiation Protection Engineer or Chemistry Engireer Member: Onsite Safety Review Engineer A0b: 8hl<f! 4oW4 an)9 ALTERNATES ogy.fli7 Egirie r 6.5.1.3 All alternate members shall be appointed in writing by the 50RC Chai man.
a. kvice-Chairmen-shall- M ::eens-of--Station-nanagement. .
b. -No more than two alternates to members shall participate as voting members in 50RC activities at any one nesting,
c. Alternate appointees will only represent their respective department.
d. Alternates for members will not make up part of the voting quorum when the member the alternate represents is also pr$sent.

MEETING FREQUENCY 6.5.1.4 The 50RC shall meet at least once per calendar month and as convened by the 50RC Chaiman or his designated alternate, qu0 RUM

6. 5.1. 5 The quorum of the 50RC necessary for the performance of the 50RC responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and at least four members including alternates.

RESPONSIBILITIES

6. 5.1. 6 The 50RC shall be responsible for:

{ Tp5(gfj a. Review of: (1)411-Sta440n AdmWstrative Scoceduru and changes thereto and (2) Newly created procedures or changes to existing HOPE CPEEK 6-7

)

pDko m o274 220,3n g ADOCK or. coo h4  ;

PDR

. o Insert 1 to D. 6-7 Only designated Vice Chairmen or the General Manager - llope Creek operations may act as Chairman of a SORC meeting.

Insert 2 to D. 6-7 Upper tier administrative procedures within the scope of Regulatory Guide 1.33 (2/78),

t

' "-' ' 4 " T- -

e**P +, eyer p-. ,-p,,, y -