ML20082Q201
| ML20082Q201 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/04/1991 |
| From: | Krieger R SOUTHERN CALIFORNIA EDISON CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20082Q202 | List: |
| References | |
| NUDOCS 9109120003 | |
| Download: ML20082Q201 (2) | |
Text
- _ _ _ _ _ _ - _ _.
Southom Califomia Edison Company S AN ONOF $.E NUCL E Af4 OE NE 14 AllNO DTA fiON P. O. [FJ K 120 SAN CLE' it.NTB, C AliFORNIA9.'674 0150 R. W. MRIEGER
~ " ~ ~ ~
g,,
September 4 1991 U.
S.
Nuclear Regulatory Commission, Region V Mr. L.
B. Martin, Regional Administrator 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368
Subject:
Docket Nos. 50-361 and 50-362 Operator Requalification Program Evaluation San Onofra Nuclear Generating Station, Units 2 and 3
Reference:
Letter, H.
E.
Morgan (SCE) to J.
B.
Martin (NRC), dated May 20, 1991
Dear Mr. Martin:
The referenced letter indicated, in pa::t, that the 1990 operating examinations for Unita 2 and 3 operators were not performed within the time requirements specified in 10 CFR SS.59(a).
As a result of this discrepency, SCE performed a Quality Assurance (QA) evaluation of the Nuclear Training Department (NTD) for compliance with other 10 CFR 55.59 training requirements.
In telephone conversations between Messrs.
L. Miller (NRC) and R.
L.
Sandstrom (SCE) on August 12 and 13, 1991, Mr. Miller requested that SCE send a copy of the QA report documenting the evaluation of NTD.
Accordingly, enclosed is a copy of the QA report.
If you require any additional information, please so adviso.
Silcerely,
/
Q L/ M t.
Enclosure cc:
C.
W.
Caldwell, USNRC Senior Reuident Inspector, Units 1,
2 and 3 Lew Miller, USNRC Region V USNRC Document Control Desk 100033 9109120003 910904 PDR ADOCK 05000361
/
y PDR j
i
!?
i
-,1 n..-
i
-i i
1 i
j.:;
j j'
ENCLOSURE f
l-QUALITY ASSURANCE EVALUATION REPORT OF NTD 10 CFR 55.59 TRAINIliG REQUIREMEllTS e
?
9 4
t
')
l l
I d
i G
D
,-i
-