MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20034E2721992-11-23023 November 1992 Partial Response to FOIA Request for Documents Re NRC Papers at Hoover Library.Records Subj to Request in App a Are Being Withheld in Part (Ref FOIA Exemption 5) ML20101Q4331991-10-30030 October 1991 Partial Response to FOIA Request Re Investigation of Zack Co Done by Nrc.App E Records Encl & Are Being Made Available in Pdr.App D Records Already Available in Pdr.App F Records Withheld in Entirety (Ref FOIA Exemption 6 & 7) ML20044A9881990-07-11011 July 1990 Responds to Re Util Application to Conduct Onsite Disposal of Dredging Spoils.Concerns of Michigan Eco-Watch Will Receive Appropriate Attention ML20044B0011990-03-29029 March 1990 Expresses Alarm Re Application for Disposal of Dredged Discharge Canal Sediment.Investigation of Activity Level Requested ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl 1997-03-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20133H9201985-05-0909 May 1985 Discusses Ee Kent Allegations Re Quality of Engineering & Const at Plant.Region III Could Quickly Dispose of Matters Held Open in NRC .Meeting to Facilitate Closure Suggested ML20095E2211984-08-0707 August 1984 Forwards Minutes of Monthly Third Party Assessment 840712 Meeting Re Status of Independent Assessment of Underpinning & Remedial Soils Work & Status of Const Implementation Overview Program ML20093H6381984-07-24024 July 1984 Solicits Support in Resolution to Call Public,Congress & Administration Attention to Concern Over Impending Electricity Shortage Due to Unnecessary Cancellations of near-term Plants Under Special Interest Group Pressure ML20093J5901984-07-18018 July 1984 Forwards Const Implementation Overview Weekly Rept 57 for 840709-13 ML20090G1971984-07-18018 July 1984 Forwards Draft Topical Rept B-84-148, Idcvp:Control Room HVAC Sys Performance Requirements ML20093E0781984-07-0606 July 1984 Forwards Const Implementation Overview Weekly Rept 55 for 840625-29 ML20095E2591984-07-0303 July 1984 Forwards Independent Assessment of Underpinning Weekly Rept 93 for 840624-0630.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20095E3051984-07-0202 July 1984 Forwards Const Implementation Overview Weekly Rept 54 for 840618-22.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20093A4091984-07-0202 July 1984 Forwards Summary of 10th General Status Review 840621 Meeting in Ann Arbor,Mi on Confirmed Items & Findings Re Idcvp ML20095E2451984-06-27027 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 92 for 840617-0623.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering Const & QA Personnel Encl ML20092P3621984-06-26026 June 1984 Notifies That 840619 Meeting Re Idcvp Rescheduled for 840628 in Ann Arbor,Mi to Discuss Civil/Structural Confirmed Items ML20095E2891984-06-22022 June 1984 Forwards Const Implementation Overview Weekly Rept 53 for 840611-15.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20092H5461984-06-22022 June 1984 Forwards Rev 5 to Project QA Plan, CPC Midland Idcvp. Signed Document Ack Requested by 840702 ML20095E2291984-06-20020 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 91 for 840610-16.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20092C3021984-06-18018 June 1984 Forwards Nonconformace Identification Rept 037 Re Orientation & Configuration of Support in Hanger Sketch ML20092C9451984-06-14014 June 1984 Forwards Const Implementation Overview Weekly Rept 52 for Wk of 840604-08 ML20092C4021984-06-14014 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 90 for 840603-09 ML20092A5641984-06-12012 June 1984 Forwards Info Re Closed Const Implementation Overview Item 080 Re Certified Personnel Not Listed in Available Certifications ML20095E2751984-06-0808 June 1984 Forwards Const Implementation Overview Weekly Rept 51 for 840528-0601.Rept Includes Summary of Activities & Open Items,Nonconformance Identification Repts & Hold Points ML20091N3251984-06-0707 June 1984 Forwards Const Implementation Overview Nonconformance Identification Rept Nir 023 Re Work Print Station 209,for Info ML20091M8761984-06-0707 June 1984 Forwards Open Const Implementation Overview Item 087 Re Liquid Penetrant Exam on Welds ML20091R6611984-06-0606 June 1984 Forwards Const Implementation Overview Weekly Rept 50 for 840521-25 ML20092C9731984-06-0606 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 89 for 840527-0602 & Minutes of Daily Meetings ML20091Q8271984-06-0606 June 1984 Forwards Signed Affidavit & Resumes for Mj Huss & Je Walker. Huss & Walker Assigned to Const Implementation Overview Staff ML20091N0421984-06-0404 June 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 022 & 027 ML20091J8471984-06-0404 June 1984 Forwards Const Implementation Overview Item/Hold Point Notification Forms for Items 072 & 073 Re ANSI N45.2, Section 7 & B&W QA Manual,Rev 3,respectively ML20091L0321984-06-0404 June 1984 Forwards Resumes & Statements of Independence for Jm Hendrie,Jm Biggs & JW Stanley to Conduct Idcvp ML20091N0281984-06-0404 June 1984 Forwards Closed Const Implementation Overview Item 060 Re Site Auditing ML20091N8001984-06-0101 June 1984 Forwards Closed Const Implementation Overview Items 070 & 086 Re Status Assessment Process & Nonconformance Identification Repts 022 & 023,respectively ML20091J8521984-05-31031 May 1984 Forwards Const Implementation Overview Weekly Rept 49 for 840514-18 ML20091H3931984-05-29029 May 1984 Forwards Open Const Implementation Overview Item 082/hold Point Notification.Audit Forms/Checklists Incomplete & Some Criteria of 10CFR50,App B Not Audited ML20091E7191984-05-24024 May 1984 Forwards Closed Nonconformance Identification Rept 019 Re Fddl Printouts Including Error in Unsolicited Drawings ML20091J0021984-05-23023 May 1984 Informs That Tera Personnel Will Meet W/Bechtel in Ann Arbor,Mi on 840530-0601 to Discuss Idcvp Progress & Items Re Standby Electric Power Sys Performance Requirements Review ML20091E5051984-05-23023 May 1984 Forwards Closed Const Implementation Overview Item 063 Re Use of Fsk Prints Not Marked Status Assessment Print or W/Expiration Date ML20091A2061984-05-23023 May 1984 Notifies of Idcvp 840531 Meeting W/Util & Bechtel in Ann Arbor,Mi to Discuss Status of Response to SEP Confirmed Items & to Obtain Info Re Standby Electric Power Sys Performance Requirements Review,Per 840530-0601 Visit ML20092A6691984-05-22022 May 1984 Forwards 840510 Meeting Minutes Re Status of Independent Assessment of Underpinning & Remedial Soils Work ML20091E0691984-05-22022 May 1984 Forwards Tracked Action Item 086 Re Nir 022 & Nir 023. Requests One Reply Clarifying Initial Findings.Current Replies Provide Inaccurate & Conflicting Info ML20091N8801984-05-22022 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 87, for Wk of 840513-19 ML20091E7521984-05-22022 May 1984 Forwards Closed Const Implementation Overview for Item 059 Re Failure to Maintain Audit Repts ML20091G9611984-05-22022 May 1984 Forwards Minutes of 840510 Meeting Re Third Party Assessment Activities Concerning Underpinning & Remedial Soils Work ML20091B4141984-05-21021 May 1984 Forwards Const Implementation Overview (Cio) Weekly Rept 48 for 840507-11.Rept Includes Summary of Cio Activity,Open Items,Nonconformance Identification Rept Summary & Hold Points ML20091C5691984-05-18018 May 1984 Forwards Open Const Implementation Overview/Hold Point Notification 085.Asterisked Items May Impact Phase I/Phase II Release ML20091B0711984-05-18018 May 1984 Forwards Const Implementation Overview Nonconformance Identification Rept 025 Re Inprocess Evaluation of Documents Received at Station 219.Item Closed ML20084R3661984-05-17017 May 1984 Forwards Open Nonconformance Identification Rept 033 Re Svc Water Pumphouse ML20091C5021984-05-17017 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 86 for 840506-12.Minutes of Daily Meetings Encl ML20091J9331984-05-17017 May 1984 Forwards for Action/Info,Const Implementation Overview Item 083 Hold Point Notification Re Noting on Visible Portion of Cable,Portion of Cable Not Inspected & Reason Why Cable Not Inspected ML20091J7711984-05-17017 May 1984 Forwards Open Const Implementation Overview Item 084 Re Verification of Quality Verification Program Activities in Module 800 E-G ML20091J7721984-05-17017 May 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 026 & 024 Re Deficiencies in Drawings, Including Rev 13 to Drawing C-130,Rev 7 to Drawing C-224, Drawing A-871 & Rev 17 to Drawing C-898 ML20090K5251984-05-16016 May 1984 Forwards Midland Nuclear Plant Units 1 & 2 Idcvp,Twelfth Monthly Status Rept for 840401-30.Next Ocr/Finding Status Review Meeting Will Be Held in mid-June.Meeting Notice & Agenda to Be Issued When Meeting Scheduled 1985-09-16
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20044B0011990-03-29029 March 1990 Expresses Alarm Re Application for Disposal of Dredged Discharge Canal Sediment.Investigation of Activity Level Requested ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20155G0001986-04-23023 April 1986 Forwards Info in Response to 860327 Request Re Reactor Vessel Closure Region Thermal Stress During Natural Circulation Cooldown (Generic Issue 79).W/nine Oversize Drawings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl 1990-03-29
[Table view] |
Text
)
/RIHG1 PAL STAFF STONE & WEBSTER MICHIGAN, INC. W
/M;+P l
- )/HI-i P.O. box 2325. BOSTON, M ASSACHUSETTS O2107 1/ R/'
E.9 g
z.
~$,
h M,
V
'5M1 Fha /& 13 Mr. J. G. Keppler, Administrator, Region III October 26, 1983 Nuclear Regulatory Commission J C. No. 14509 799 Roosevelt Road NRC File #83-10-26 Glen Ellyn, IL 60137 RE: DOCKET NO. 50-329/330 MIDLAND PLANT - UNITS 1 AND 2 OVERVIEW OF THE CONSTRUCTION COMPLETION PROGRAM REPORT NO. 19 A copy of the Construction Implementation Overview Report No.19 for the period October 17, 1983 through October 21, 1983 is enclosed with this report. One Management Review Committee meeting was held during this reporting period.
Evaluations of CCP activities, as appropriate are attached.
In addition, matrices of Open Items, Hold Points, and NIRs are attached.
Very ruly yours, S. W. Baranow Program Manager SWB/ka l
cc: JJHarrison, US NRC, Glen Ellyn, IL RCook, US NRC, Midland (Site)
DLQuamme, CPCo', Midland (Site)
RBKelly, S&W APAmbruso, S&W e
Y 8312060194 831130 PDR ADOCK 05000329 G
pyg OCT 311983
i LI
)
Report No. 19 October 17, 1983 through October 21, 1983 Personnel on Site St.one & Webster Michigan, Inc.
A. Amoruso J. Chawla J. Seely S. Baranow D. Cooke W. Sienkiewicz F. Bearham J. Langston A. Smith J. Barr T. Parker J. Thompson R.Carpeggiani R. Scallan' -
C. Larsen (temporary)
Meetings Atten'ded Date
-Attendees Purpose October 19, 1983 Consumers Power Company Readiness for Status Management Review Comittee Assessment Stone & Webster CIO Bechtel Power Company MPQAD October 17, 1983 Consumers Power Company Daily Staff Management through Bechtel Power Company Meetings
-October 21 r1983 Stone & Webster CIO---
MPQAD October 17, 1983 Consumers Power Company Bi-Weekly Staff and Bechtel Power Company Meetings with Team i
and October 20, 1983 Stone & Webster CIO Supervisors MPQAD October 20, 1983 Consumers Power Company Welding Evaluation
~Bechtel Power Company Program (HVAC Welds)
Zack MPQAD Stone and Webster CIO
, October 21, 1983 Consumers Power Company Weekly Sub-Contractor i
Bechtel Meeting
,Zack Stone & Webster CIO Dctober 21, 1983 Consumers Power Company Development of a Bechtel Ugified Commitment MPQAD Tracking System Stone and Webster CIO e
1
=
U
)
<a l
I JOB NO. 14509 l
MIDLAND NUCLEAR POWER PLANT REPORT N0. 19 PAGE 2 Meetings October 19, 1983 - Management Review Committee Meeting. Agenda items discussed were:
- Identification of civil commodit.ies
\\
- MPQAD inspection / construction interface
, CIO is providing details of agenda items under separate cover.
October 17, 1983 through October 21, 1983 - during this period, CIO attended dally staff management meetings and bi-weeklymeetings with staff and team supervisors.
October 20, 1983-HVAC Welding Evaluation Program Meeting. Revision I of g
the. Photon procedures were distributed to and reviewed by the attendees.
Testing parameters, responsibilities'and traceability of assigned project numbers to test pieces were discussed. There are approximately 90 welds which were removed from structural supports which were removed from i
structural supports which will be tensile tested at CPCo (Jackson) Laboratory in Jackson, Michigan. CIO has been requested by CPCo to provide surveillance inspection of this testing. To accomplish this tas_k, CIO has developed attribute checklist MP-MIS-Z-039 " Program to Evaluate Past Welding to Photon i
Procedures:
Subjects discussed at the daily staff management meetings were:
(
- Delays in dispositioning/ closing NCRs
4 O
)
.l.
JOB NO.
14509 MIDLAND NUCLEAR POWER PLANT REPORT NO. 19 PAGE 3
[
- Progress with procedure issuance
(
- Other~ administrative activities
- Manpower loading Subjects discussed at the bi-weekly meetings with staff, team supervisors and support personnel were:
- Need for " Hands on" experience with procedures -
N
- Staffing to support Module 340, activities
- Delays in document control drawing issue
- Other administrative activities such as overtime October 21, 1983 - Weekly subcontract status meeting. Subjects discussed were:
f Bechtel Power Company
- Numberof NCRs related to Plant Unit 2 which are to be cleared befor.e the end of 1983.
- Status of Zacks weld tensile testing program l
- Cause of increase of Field Change. Requests (FCR)
Zack HVAC
- Piping Stystem, 20LC system
- Increase of NCRs related to installation drawings f
- MB-FP-16 Training Procedure
[
Transco
- Backup data for restraints noted on punch lists
- Punch List for Plant Unit 2
L.)
)
i*
JOB N0.
14509 MIDLAND NUCLEAR POWER PLANT REPORT NO. 19 PAGE 4 CTIVITIES Training Records The CIO evaluation of sampling inspections performed on approximately 1993 individual training records has been completed and documented on l
Checklist No. MP-MIS-001E. Records of Teams 5,6,8,9.12,17,20,25,26, (27/28),29,30,31,(32/33 and the HBO Team 32/33 Staff were covered.
NIR.006 will be issued describing'the discrepancies identified.
GENERAL The US NRC, Consumers Power Company, and Stone and Webster met on October 13, 1983 to discuss CIO activities. The monthly meeting was open to the public. Minutes of the meeting have been sent to the Region'III, NRC and Consumers Power Company, s
e B
~*
9 e*
4
=
e o
9 e
s
)
(,
STONEANDWEBSTERENGINEERINGCORPORkTION QCI 15.01 n 4.1 fttac NONCONFORMANCE IDENTIFICATION REPORT oAGE 1 0F 1 DATE OF NONCONFORMANCE:
SEPTEMBER 27, 1983 NIR NUMBER 005 IDENTIFICATION / LOCATION OF ITEMS:
j
-MP0AD - RECORDS FILE SECTION DESCRIPTION OF NONCONFORMANCE:
A sample inspection of 6 of 45 MPQAD Personnel Training Records revealed that the Personnel Certification Focn QA-116-1, Attachment D is not available in the record file as required by Procedure B-3M-1.
j PERSONNEL
- 1) B. E. FREIMARK - 365-64-4818
- 4) D. W. GASKILL
- 278-54-0575
- 2) T. G. NELSON
- 276-56-6857
- 5) B. D. HINES
- 365-52-6895
- 3) S. REVICH
- 379-84-0876
- 6) J. R. AD0M0WSKI - 368-46-9164
/>.laldre M, Ou
?Imie.,
PROGRAMiGR
[hM INITIATOR q)
DATE S,o 4,,,L e
- 2 7 /9 F_3 DATE O -.#, /f B U
CORRECTIVE ACTION BY:
MP0AD
. IDENTIFY ORGANIZATION TAKING CORRECTIVE ACTION CIO has verified that the correct foms for Level II certification are on file for the 6 MPQAD personnel noted above. This NIR can be considered closed.
i iERIFICATION SAT VUNSAT NEW NIR#
~
3 CONCjlRRENCE INITIATOR h J[ M. d..*,
PROGRAM MGR d M N/A DATE
/o-3o-93 N
DATE DATE/*/ #.5 REMARKS
2 STONE & WEllSTER MICllIGAN, INC.
i CONSTRUCTION IMPl.EMENIATinN UVERVIEW 1
NIR LUG SUM 4ARY i
DATE
' DATE DATE I
NIH MPQAD NO.
NCR HO.
SUBJECT OF DISP. BY CLOSED REMARKS ISSUE MPQAD i
0AR NO.
NIRTssued us closed-no cor-
- l N/A Training Records 8/15/83 8/15/83 8/17/83
' r'dc'tive action 001 required l
002 QAR Foms from both procedures C-3M and RT 00005 B-3M-1-are intemixed in training 10/4/83 10/12/83 records 4
i l
i 003 OAR Yearly vision examination was exceeded 10/4/83 10/12/83 RT 00006 OAR 0JT training records not available in RT 00007 training records. Revision number not 10/4/83 10/12/83 I
004 listed on DJT Record l
Memo to CPCo ad-Personnel Certification Fora QA-116-1, vising th.it NIR-005 i
0AR RT 00011 Attachment D is unavailable in record 10/4/83 10/12/83 10/20/83 can be closed out.
l 005 Records.for Level 11 files -
certifications have been verified by CIO-
)
t i
l QCI 15.01 I
ATTACllHENT 4.3 I
REV. 2 1
. i a
t a
D M/
tne em su oco dD d
es
-n o
l
~
sC n
u/
e tn p
ae O
p MO ee st mDa p/
st en Re m ou WD co TN
.A CL NP I
e N
t 5
,O ga
~
NI nD o3 AT d/
N8 GA t
IR an
/
HES ne t8 CNN im r1 IEO gu o/
.l MGI ic eI p7 0T ro e
RCA OD R
E V
TRR SAE BES ELB WCO U
&NO I
EDC NN OA TL O
SD tM nS I
M e/
mD pA iQ s
uP n
qM o
E i
t r
a om v
da r
nr e
eg s
Vo b
r O
wP e
in vo ei rt a oc ti f
dier ee
,',NV no i
tr 0
a e 3
vb 0
r m e u sN b
O il; iI ii
!l
];
lI
,1 44 lll1!jj!;I
- i(;l
STONE & WEBSTER MICHIGAN, INC.
CONSTRUCTION IMPLEMENTATION OVERVIEW HOLD POINT LOG StM4ARY 4
ORIGINATING CPCo RESPONSE STATUS CLOSE-00T SUBJECT DOC /DATE DOC /DATE OPEN/ CLOSED DOC /DATE i
NO.
1, l
001 Adequacy of drawings A8 - large bore pipe
. Report No. 6 Letter Closed Report No. 9 t
8/15/83 hangers. CIO established Hold Point when MPQAD 7/25/83 8/9/83
~
1 l
issued 2 NCRs against the use of red-lined drawings which were voided by Project Engineering.
l i
l 002 Material traceability of installed hangers (E3).
Report ha. 6 Letter Closed Report No. 9 CPCo response dated 7/1/83 indicated report on
-7/25/83 8/9/83 8/15/83 i
material traceability was to be issued in a timely manner. Due to uncertainty of when the report would be issued, a Hold Point was e,stablished by C,IO.
s Report No. 6 Letter Closed Report No. 9
.i -
003 Has a program been developed and responsibilitie established for personnel assigned to process 7/25/83 8/9/83 8/15/83 nonconformances?
Has a meeting been held with Project Engineering to discuss methodology of processing non-i conformhnces?
a, e
l
STONE & WEBSTER MICHIGAN, INC.
CONSTRUCTION IMPLEMENTATION OVERVIEW HOLD F0 INT LOG
SUMMARY
i ORIGINATING CPCo RESPONSE STATUS CLOSE-00T SUBJECT DOC /DATE DOC /DATE OPEN/ CLOSED DOC /DATE NO.
Report No. 18 Open CPCo'h5dcommittedtodeve'IopaVendor Equipment Verification Program. Program is 10/17/83 004 l
required before implementation of Phase II.
4 l
NIRs 002, 003, 004 and 005 issued as a result Report No. 18 Open 005 10/17/83' of sampling inspections of 45 MPQAD Training Records. Corrective action must be completed before any inspections can be performed by the 45 personnel in question.
s
^
,s 1
Open Evaluation of Management Review of results of Report No. 19 l
006 10/24/83 Phase I activities. Evaluation of Management Review Committee plans and procedures for Phase 11 implementstion.
5
- s t
l l
~
.