Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203Q2891986-05-0606 May 1986 Forwards BNL Technical Rept, Surveillance & Maint..., Based on NRC 851014-18 Insp.No Violations Noted.Items Identified Could Have Impact on Later Project Restart. Evaluation of Rept Recommendations Requested within 60 Days ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued 1997-03-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20133H9201985-05-0909 May 1985 Discusses Ee Kent Allegations Re Quality of Engineering & Const at Plant.Region III Could Quickly Dispose of Matters Held Open in NRC .Meeting to Facilitate Closure Suggested ML20095E2211984-08-0707 August 1984 Forwards Minutes of Monthly Third Party Assessment 840712 Meeting Re Status of Independent Assessment of Underpinning & Remedial Soils Work & Status of Const Implementation Overview Program ML20093H6381984-07-24024 July 1984 Solicits Support in Resolution to Call Public,Congress & Administration Attention to Concern Over Impending Electricity Shortage Due to Unnecessary Cancellations of near-term Plants Under Special Interest Group Pressure ML20090G1971984-07-18018 July 1984 Forwards Draft Topical Rept B-84-148, Idcvp:Control Room HVAC Sys Performance Requirements ML20093J5901984-07-18018 July 1984 Forwards Const Implementation Overview Weekly Rept 57 for 840709-13 ML20093E0781984-07-0606 July 1984 Forwards Const Implementation Overview Weekly Rept 55 for 840625-29 ML20095E2591984-07-0303 July 1984 Forwards Independent Assessment of Underpinning Weekly Rept 93 for 840624-0630.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20095E3051984-07-0202 July 1984 Forwards Const Implementation Overview Weekly Rept 54 for 840618-22.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20093A4091984-07-0202 July 1984 Forwards Summary of 10th General Status Review 840621 Meeting in Ann Arbor,Mi on Confirmed Items & Findings Re Idcvp ML20095E2451984-06-27027 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 92 for 840617-0623.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering Const & QA Personnel Encl ML20092P3621984-06-26026 June 1984 Notifies That 840619 Meeting Re Idcvp Rescheduled for 840628 in Ann Arbor,Mi to Discuss Civil/Structural Confirmed Items ML20092H5461984-06-22022 June 1984 Forwards Rev 5 to Project QA Plan, CPC Midland Idcvp. Signed Document Ack Requested by 840702 ML20095E2891984-06-22022 June 1984 Forwards Const Implementation Overview Weekly Rept 53 for 840611-15.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20095E2291984-06-20020 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 91 for 840610-16.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20092C3021984-06-18018 June 1984 Forwards Nonconformace Identification Rept 037 Re Orientation & Configuration of Support in Hanger Sketch ML20092C4021984-06-14014 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 90 for 840603-09 ML20092C9451984-06-14014 June 1984 Forwards Const Implementation Overview Weekly Rept 52 for Wk of 840604-08 ML20092A5641984-06-12012 June 1984 Forwards Info Re Closed Const Implementation Overview Item 080 Re Certified Personnel Not Listed in Available Certifications ML20095E2751984-06-0808 June 1984 Forwards Const Implementation Overview Weekly Rept 51 for 840528-0601.Rept Includes Summary of Activities & Open Items,Nonconformance Identification Repts & Hold Points ML20091M8761984-06-0707 June 1984 Forwards Open Const Implementation Overview Item 087 Re Liquid Penetrant Exam on Welds ML20091N3251984-06-0707 June 1984 Forwards Const Implementation Overview Nonconformance Identification Rept Nir 023 Re Work Print Station 209,for Info ML20092C9731984-06-0606 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 89 for 840527-0602 & Minutes of Daily Meetings ML20091Q8271984-06-0606 June 1984 Forwards Signed Affidavit & Resumes for Mj Huss & Je Walker. Huss & Walker Assigned to Const Implementation Overview Staff ML20091R6611984-06-0606 June 1984 Forwards Const Implementation Overview Weekly Rept 50 for 840521-25 ML20091J8471984-06-0404 June 1984 Forwards Const Implementation Overview Item/Hold Point Notification Forms for Items 072 & 073 Re ANSI N45.2, Section 7 & B&W QA Manual,Rev 3,respectively ML20091L0321984-06-0404 June 1984 Forwards Resumes & Statements of Independence for Jm Hendrie,Jm Biggs & JW Stanley to Conduct Idcvp ML20091N0281984-06-0404 June 1984 Forwards Closed Const Implementation Overview Item 060 Re Site Auditing ML20091N0421984-06-0404 June 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 022 & 027 ML20091N8001984-06-0101 June 1984 Forwards Closed Const Implementation Overview Items 070 & 086 Re Status Assessment Process & Nonconformance Identification Repts 022 & 023,respectively ML20091J8521984-05-31031 May 1984 Forwards Const Implementation Overview Weekly Rept 49 for 840514-18 ML20091H3931984-05-29029 May 1984 Forwards Open Const Implementation Overview Item 082/hold Point Notification.Audit Forms/Checklists Incomplete & Some Criteria of 10CFR50,App B Not Audited ML20091E7191984-05-24024 May 1984 Forwards Closed Nonconformance Identification Rept 019 Re Fddl Printouts Including Error in Unsolicited Drawings ML20091A2061984-05-23023 May 1984 Notifies of Idcvp 840531 Meeting W/Util & Bechtel in Ann Arbor,Mi to Discuss Status of Response to SEP Confirmed Items & to Obtain Info Re Standby Electric Power Sys Performance Requirements Review,Per 840530-0601 Visit ML20091E5051984-05-23023 May 1984 Forwards Closed Const Implementation Overview Item 063 Re Use of Fsk Prints Not Marked Status Assessment Print or W/Expiration Date ML20091J0021984-05-23023 May 1984 Informs That Tera Personnel Will Meet W/Bechtel in Ann Arbor,Mi on 840530-0601 to Discuss Idcvp Progress & Items Re Standby Electric Power Sys Performance Requirements Review ML20091N8801984-05-22022 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 87, for Wk of 840513-19 ML20092A6691984-05-22022 May 1984 Forwards 840510 Meeting Minutes Re Status of Independent Assessment of Underpinning & Remedial Soils Work ML20091E0691984-05-22022 May 1984 Forwards Tracked Action Item 086 Re Nir 022 & Nir 023. Requests One Reply Clarifying Initial Findings.Current Replies Provide Inaccurate & Conflicting Info ML20091E7521984-05-22022 May 1984 Forwards Closed Const Implementation Overview for Item 059 Re Failure to Maintain Audit Repts ML20091G9611984-05-22022 May 1984 Forwards Minutes of 840510 Meeting Re Third Party Assessment Activities Concerning Underpinning & Remedial Soils Work ML20091B4141984-05-21021 May 1984 Forwards Const Implementation Overview (Cio) Weekly Rept 48 for 840507-11.Rept Includes Summary of Cio Activity,Open Items,Nonconformance Identification Rept Summary & Hold Points ML20091B0711984-05-18018 May 1984 Forwards Const Implementation Overview Nonconformance Identification Rept 025 Re Inprocess Evaluation of Documents Received at Station 219.Item Closed ML20091C5691984-05-18018 May 1984 Forwards Open Const Implementation Overview/Hold Point Notification 085.Asterisked Items May Impact Phase I/Phase II Release ML20091J7711984-05-17017 May 1984 Forwards Open Const Implementation Overview Item 084 Re Verification of Quality Verification Program Activities in Module 800 E-G ML20091J7721984-05-17017 May 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 026 & 024 Re Deficiencies in Drawings, Including Rev 13 to Drawing C-130,Rev 7 to Drawing C-224, Drawing A-871 & Rev 17 to Drawing C-898 ML20091J9331984-05-17017 May 1984 Forwards for Action/Info,Const Implementation Overview Item 083 Hold Point Notification Re Noting on Visible Portion of Cable,Portion of Cable Not Inspected & Reason Why Cable Not Inspected ML20091C5021984-05-17017 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 86 for 840506-12.Minutes of Daily Meetings Encl ML20084R3661984-05-17017 May 1984 Forwards Open Nonconformance Identification Rept 033 Re Svc Water Pumphouse ML20090K5251984-05-16016 May 1984 Forwards Midland Nuclear Plant Units 1 & 2 Idcvp,Twelfth Monthly Status Rept for 840401-30.Next Ocr/Finding Status Review Meeting Will Be Held in mid-June.Meeting Notice & Agenda to Be Issued When Meeting Scheduled 1985-09-16
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20133L8331985-08-0909 August 1985 Forwards Attachment 1 to Revised Exhibit D of Revised Compliance Filing & Application for Authorization to Issue Securities.Plan Is Requirement of Agreements W/Banks to Restructure Outstanding Debt.Related Correspondence ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence 1989-04-28
[Table view] |
Text
,- .' -
- i. ) .)
- STONE & WEBSTER MICHIGAN, INC. '
r P.O. Box 2325. Boston. M AssAcHusETTs 02107 o
United States Nuclear Regulatory Commission October 12, 1983 Midland Site Resident Office Route 7 J.O. No. 14358 Midland, MI. 48640 Ref. MPF 55 Attention: Mr. R. Cook DOCKET No. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSESSMENT OF UNDERPINNING REPORT No. 55 A copy of the Independent Asressment of Underpinning Weekly Report No. 55 for the period of October 2,1983 through October 8,1983 is
, enclosed with this letter. Included as attachments are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance personnel.
If you have any questions with respect to this report, please contact me at (617) 589-2067 f L[
A Stanley Lucks '
Project Manager Enclosures ASL/pd l
l l
8312060167 831130
$DRADOCK 05000329 PDR i
l
J. O. No. 14358 Midland Plant
, Units 1 & 2 Independent Assessment cf Underpinning Weekly Report No. 55 October 2. 1983 through October 8. 1983 Personnel on Site Stone & Webster Michigan, 7nc.
W. Kilker 10/4 - 10/8 B. Holsinger 10/2 - 10/4 P. Majeski 10/2 - 10/4 J. Springer 10/7 - 10/8 A. Scott 10/2 - 10/8 S. Lucks 10/5 J. Allen 10/5 N. Cleveland 10/5 G. Schierberg 10/5 Parsons,Brinckerhoff. Michigan, Inc.
. J. Ratner 10/3 - 10/7 Meetings Attended
' Date Represented Purpose 10/3 - 10/7 Stone & Webster Daily Assessment
- Bechtel Team Meetin5 Consumers Power Parsons 10/3 Bechtel Weekly Inter-organizational Consumers Power Discussion Stone & Webster 10/5 Bechtel Engineering and MPQAD Construction Meeting Consumere Power Stone & Webster -
10/3 Bechtel Discussion of Pit Method Mergentime of Constructing Final Support Consumers Power Wall for Auxiliary Building Stone & Webster 10/7 Bechtel Bi-weekly Consumers Power Project Soils Stone & Webster Meeting
( Held in Bechtel Office Ann Arbor, MI. ) -
- Meeting held at the request of the Assessment Team. Other meetings in the tabulation were attended by one or more Team members for the purpose of assessment or acquiring information.
p -- -m- ,w g p- - - , - -- e-- - e-- - ,e- -
c - - - - - - - - - - -
. 1 2 1 J. O. No. 14358 !> )
Indsp;ndant Assessment of Undsrpinning Midland Plant Units 1 & 2 Consumers Power Company Underpinning and Remedial Soils Activities - Construction E8 Grillage: Load transfer activities are complete. This item will not be l
included in future reports unless additional non-routine activities occur i at this installation location. ,
Pier Kc10: The routine rejacking of the pier is complete. A discussion of this pier will not be included in future reports unless circumstances require non-routine activities at this location.
Pier Kc10-Kc11 : The embed installation was completed and the drift invert concrete placed.
Kc10-Kc9 Drift: The drift excavation was completed. The excavated material consisted of approximately 1 ft. of unreinforced concrete underlain by a mix-ture of sand and clay fill. The installation of the final drift support sets remains to be completed.
Pier E14: The concrete placement was completed and the curing period is under-way. A minor surface repair- of honeycombed concrete was required at the upper construction joint elevation.
W8 Grillage: Lead transfer activities are complete. This item will not be included in future reports unless additional non-routine activities occur at i this' installation location.
Pier Kc3: Repair of the turbine mat patch progressed. However, grout strength verification and disposition of a non-conformance on small voids in the patch grout is required before the upper leveling plate work can be initiated.
Kc2-Kc3 Drift: The drift was completed with the majority of the excavation in unreinforced concrete. Drift invert reinforcing steel is being installed.
UATs: The excavations through the west and east UATs were initiated. The respective corners of the control tower foundation were revealed. Excavation in tue west UAT area was generally in grouted sand while in the east UAT the excavated material was mainly unreinforced concrete. Additional grouting is underway and will be completed prior to excavation of the access pits to piers CT1 or CT12.
SWPS: The dewatering system was activated. Early indications are that it effectively lowers the groundwater level. Installation of the soldier piles is nearly complete. However, work has been temporarily halted pending a determination by Project Engineering of the significance of encountering a boulder near the proposed bearing elevation and being able to displace the boulder with the truck drilling' action. Engineering is evaluating the need to extend the bearing elevation somewhat deeper to the natural soil. Exca*cstion of the underpinning access pit adjacent to the northeast corner of the foundation wall was started. The excavation extended to app-oximate E1 629. l BWST: Nearly half of the reinforcing steel for the Unit 2 tank is in-place while the reinforcing steel installation for the Unit 1 tank has just begun.
a 3
($ _)
J. O. No. 14358
= Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Yard Area: Excavation and lagging of the access pits around the two 36 inch diameter pipe casings were c'ompleted. Continuation of the casing removal requires the mobilization of a drilling rig to inject drilling fluid into the area as the casing is pulled.
Assessment Team Observation - Construction The Assessment Team observations of the concrete placement at pier'E/W14 and the Kc10-11 drift invert, the excavation and lagging of the Kc9-10 drift, the excavation of the CT1/12 access drifts showed that the work is being accomplished in accordance with the project documents. There was some delay in final sign-off of the concrete pour card just prior to initiating placement for pier E14 and Kc10-11 drift invert. The Assessment Team recommendsInspection this activity be completed prior to making the decision to order concrete.
of the so$l grouting exposed in the west UAT excavation indicates -that the i ~ penetration and coverage was excellent. Except for additional soil stabilization, work progress on the UAT work has been delayed by the need to modify the drift supports.
Assessment Team Observation - QA/QC
- 1. During a review of the QC Inspection Reports on the E/W8 grillage beam installation, the Assessment Team noted that Field Engineer's Daily Reports that contained interpretative comments on the Engineer's drawings were attached to the irs. These interpretations were countersigned by the respons-ible Resident ' Engineer ; on the report form. in addition, these Field Engineer's Daily Report forms are controlled; that is, they are assigned a specific number. Subsequently, the QC inspector took these comments, as confirmation of a drawing interpretation ( not a drawing change ) and attached the applicable report form.to the QC Inspection Report. The Assessment Team believes this is an acceptable method of documenting Engineering interpretation of the drawings.
- 2. The Assessment Team reviewed a draft report on an evaluation of US Testing f
) issued by the Contractor's Civil Field Engineering group. Since an audit of l
US Testing by CPCo earlier this year, there has been an on-going effort by both CPCo and Bechtel to foster positive changes in the US Testing organization, l
procedures, training and document control. This recent report is still quite critical of the overall performance of US Testing and offers specific recommend-ations.to improve both the quality and performance aspects of the organization.
l The Assessment Team commends the on-going effort by the Owner and Contractor l
to develop changes at US Testing. Nevertheless , in light of the on-going underpinning / soils remedial work and the upcoming balance of plant construction i
work, the Team feels it is important that the recommendations be acted upon as ,
soon as is practical.
l Work Activity Packages The Assessment Team reviewed Work Activity Packages on the Installation of Cathodic Protection in Q-Soils (WAP59) and the F.epair of the deep Q-Duct Bank (WAP 25).
Questions were submitted to the FSO Constructibility Group for resolution or I clari fication .
l
- . . ? .: .. . . . . -
4 J.O. Ns. 14358 (- } )
. Mid1cnd Plcnt Units 1 & 2
' Independent Assessment of Underpinning Nonconformance Identification Reports NIR No. Description Date -
(Opened) (Closed)'
14 Nut Procurement 8/11/83 15 MPQAD Supervisor 9/19/83 Certification Open Items The following is a listing of all open items from the Daily Meeting Notes '
with Bechtel and the Weeklv Meeting with MPQAD. Carry-over items.from past weeks which have been closed out this week are also listed.
Description Closure Item No.
Discussion on Mechanism open 45-8Q of Identifying Quality Concerns Structural Backfill PCCI Open 48-80 Adequacy Control Document Open W.R. 51,ps.4 Evaluation MPQAD Independent Open 52-40 Welding Inspection Rcview Inadvertent Drilling 55-21 ,
54-24 of Auxiliary Building Strongback BWST Status 55-14 54-27 Plasticized Concrete open 55 .2 Mix Tests SWPS Soldier Piles Open 55-31 .
Project Manager
? reject Engineer
- - - - - , - , _w,.
4~, -
e , - , , - . ,y-
. s. ..
. () )
e Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company o ,
Held at Midland Site Location Midland, Michigan October 3, 1983 Present For: ,
Consumers Power Bechtel MPQAD Stone & Webster G. Murray J. Fisher R. Sevo
- A. Scott J. Gaydos P. Majeski J. Davie J. Darby Parsons
- Part Time None Purpose This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
. Discussion Item 55 UAT Work Status.
The steel walls cf the UAT's have been opened and the drifts to CT 1/12 have begun. ( CLOSED ITEM )
Item 55 Status of Concrete Mix With Superplasticizer.
A. Scott inquired as to status of evaluation of concrete mix with super-plasticizer. J. Gaydos indicated that he is in the process of gathering additicnal data concerning the quantity of superplasticizer versus work-ability and strength as well as gathering other data. He will provide additional information at a future meeting. ( OPEN ITEM )
Item 55 Turbine Building Mat Repair.
J. Fisher indicated that small voids were found around the edges of the turbine building mat repair at Kc3 He indicated that they anticipated repairing the voids when the leveling plate plate is inst'alled. ( OPEN ITEM )
Item 55 Excavation Permit Procedure Revision.
J. Fisher advised that the revised Excavation Permit Procedure was signed out on 10/1. ( CLOSED ITEM )
Item 55 BWST Status.
R. Sevo indicated that the C inspectors for the upcoming BWST work have completed their-training and are ready to perform the necessary inspections.
Training was completed during the morning of 9/30. The delay came about because MPQAD was not aware of a need to train inspectors to a procedure for bending rebar. ( CLOSED ITEM )
Item 55 Additional Exploration Pits at SWPS.
J. Fisher indicated that engineering has requested approximately 15 additional exploratory pits near the SWPS. ( CLOSED ITEM )
k) ]
, Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company ,
Held at Midland Site Location 4
Midland, Michigan October 4, 1983 Present For:
Corsumers Power Bechtel MPOAD Stor.e & Webster G. Murray J. Fisher R. Sevo A. Scott-J. Schaub J. Gaydos P. Majeski E. Cviki Parsons J. Batner Purpose, This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 55 SWPS Status.
J. Pisher advised that dewatering system was activated today to determine the efficiency of the system. ( CLOSED ITEM )
Item 55 Piers CT 1 and CT 12.
J. Schaub advised that the NRC approval to begin work on these piers allows work to proceed only through excavation. Approval has not been received to place rebar. However, approval is expected prior to completion of pier excavation. ( CLOSED ITEM ) -
Item 55 Status of Concrete. Mix With Superplasticizer.
J. Gaydos stated that additional information will be furnished after the 28 day strength tests are available. ( CLOSED ITEM , ITEM 55-2 REMAINS OPEN )
Item 55 Grouting of UAT's.
The effectiveness of the regrouting at the UAT's was discussed. Inspection of exposed face shows that the grouting did not change the color of the soil except in the area of the grout hole. However,the effectiveness of the grouting was evident by physically handling the grouted soil. It is apparent that the soil that has been excavated immediately adjacent to the UAT was adequately penetrated by the grout. ( CLOSED ITEM )
Item 55 Turbine Building Mat Repair Status.
J. Fisher advised that the voids found on the edges of the repair patch will be chipped out and repaired during placement of grout for the upper leveling plate. ( CLOSED ITEM. ITEM 55-3 REMAINS OPEN )
Item 55 Cathodic Protection Installation.
The installation of cathodic protection in non 0 areas is to begin today.
( CLOSED ITEM )
Y.Y Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Locction Midland, Michigan, October 4, 1983 Item 55 SWPS Access Shaft.
The excavation of the SWPS Access Shaft is to begin late this week.
( CLOSED ITEM )
Item 55 Training of QC Inspectors.
P. Majeski asked what actions were being taken by MPQAD nnd FSO to prevent delay of work because the training of QC inspectors is '
incomplete. J. Fisher indicated that several actions have recently been taken to improve communications in this area. QC/QA will attend the weekly subcontractors meetings and the weekly scheduling meeting.
In addition, R. Oliver of MPQAD is providing a list which indicates the procedures for which there are no certified inspectors and a list of all PQCI's in preparation. Finally, other correspondence will be supplied to FSO which indicates that changes to PQCI's are necessary.
These lists and the correspondence will be reviewed by-FSO and used as required to keep MPOAD informed of upcoming work so that trainin6 can be done in a timely manner. ( This item and Item 55-5 CLOSES ITEM 54-27)
Item 55 Certification of coupler Installer.
The Assessment Team questioned the sequence of events that led to the installation of Fox-Howlett couplers on piers E/W 14 by a non-certified craftsman. J. Fisher said.the individual had performed the necessary qualification tests and had been approved by Bechtel for certification.
However, the papers had not been properly forwarded to Mergentime or MPQAD for recording the test results. Therefore, QC wrote an NCR on the non-certified installer. J. Fisher said Bechtel will naturally determine what can be done to avoid this reoccurrence. ( CLOSED ITEM )
! ._ ' )
Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company , ,
Hald at Midland Site Location Midland, Michigan October 5, 1983 e Present For:
Consumers Power Bechtel MPQAD Stone & Webster G. Murray J. Fisher None A. ' Scott J. Schaub J. Gaydos N. Cleveland R. Wheeler E. Cviki J. Allen R. Wieland D. Lavelle J. Schierberg
.M . Blendy S. Lucks
, W. Kilker Parsons J. Ratne" Purpose This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 55 Underpinning and Soils Remedial Work Status.
W. Kilker introduced 3 members of the Assessment Team Senior Management Review group. This group is on-site to be updated on activities that have occurred since their last visit in February,1983 J. Fisher presented an update on the underpinning and soil remedial work status. J. Darby presented a summary of the building instrumentation data including a discussion on upward building movement. ( CLOSED ITEM )
Item 55 Significance of NRC Control of Work Release.
N. Cleveland questioned if the NRC control of work releases has had significant impacts on the work progress. CPCo and Bechtel replied that to date the NRC has released enough work to generally keep the construction forces busy. ( CLOSED ITEM )
Item 55 Cathodic Protection Installation.
J. Fisher said the installation of additional cathodic protection holes has begun. W. Kilker indicated that the assessment team has reviewed the Work Activity Package on the installation within the Q soils area. >
( CLOSED ITEM )
Item 55 FCR on KC Drift Invert.
A. Scott questioned the status of the outstanding FCR ( written 9-29-83 )
on reinforcing steel in the drift. The FCR resolution is forthcoming.however.
Mergentime has indicated that the grillage beam 2 mock-up may be lowered into the hole to evaluate the drift configuration for accessibility. The invert concrete placement will be held-up eending the " beam fit" results.
(CLOSED ITEM )
(I .}
Notes of Daily Meeting
, Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company _
Held at Midland Site Location Midland, Michigan October 5, 1983 Item 55 Standish Fabrication Shop Work Status.
J. Ratner asked if the work was stopped at the shop. D. Lavelle replied that over the weekend the work had been halted to resolve some problems i
with the welding specification. However, work had resumed on 10-3-83
( CLOSED ITEM )
Item 55 Drilling Stop Work Order Status.
i J. Fisher reported that the Stop Work Order on the drilling has been lifted by MPQAD. Work resumes today on the various drilling. operations.
( CLOSES OUT ITEM 54-24 )
k i
e 6
m-G
! > )
..
Notes of Daily M:eting Independent Assessment of Underpinning Midland Plant Units 1 & 2 4
Consumers Power Company Held at Midland Site Location ' ~ ~
Midland, Michigan October 6, 1983
, Present For:
Consumers Power Bechtel MPQAD Stone & Webster G. Murray J. Fisher G. Carpenter A. Scott J. Schaub E. Cviki W. Kilker J. Gaydos Parsons J. Ratner
-Purpose This meeting is held each day to discuss items regarding the Independent !
. Soils Assessment at theMidland Plant, Units 1 & 2.
Discussion
, Item 55 West Access Shaft Level C Waler Beam Seats.
A. Scott questioned why the recently installed beam seats were removed.
J. Fisher replied that FSO had originally proposed to disposition an NCR on an "as-is" basis but subsequently changed to a " rework" disposition.
J. Fisher will provide an explanation. ( OPEN ITEM )
Item 55 SWPS Baseline Instrumentation Dr.ta.
J. Schaub requested that Bechtel use the date of dewatering system activatien
( 10-4-83 ) as the building monitoring baseline date. Any building movement i associated with dewatering would then be included in the settlement data.
( CLOSED ITEM )
- Item 55 SWPS Exploratory Pits.
J. Fisher reported the request to install additional exploratory pits near the SWPS has been withdrawn ( refer to Item 55-6 ). . It appears unlikely that the utility installations will require any additional support. ( CLOSED ITEM )
. Item 55 Phase II SWPS Work.
J. Ratner asked if the Phase II (re-bedding) work is tied into the Phase I work and if a contract has been placed to do that work. J. Fisher said there is no interface between the 2 phases of.the work and that efforts to place a e contract are underway. ( CLOSED ITEM )
~
Item 55 Rs-structuring of Resident Engineering Group.
E. Cviki reported that J. Darby, existing lead resident structural engineer, will confine his duties to building monitoring and procedures. An additional engineer from Bechtel will be assigned shortly to handle FCR and NCR issues.
, ( CLOSED ITEM.,) ,
() 2 s
)
(
Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & S Consumers Power Company Held at Midland Site Location Midland, Michigan October 6,1983 Item 55 Status of US Testing.
In response to a question by J. Ratner, G. Murray said Field Engineering has recently completed an " audit-type report" on U.S. Testing. The report is available for the Assessment Team. ( CLOSED ITEM )
Item 55 SWPS Abandoned Well Exploratory Pit Status.
In response to a question by A. Scott, J. Fisher stated that SWP has prepared a drawing showing the proposed exploratory pit to evaluate the soil conditions in the vicinity of well 502 adjacent to the SWPS foundation wall. Upon approval of the drawins and fabrication of the pit lagging materials, the
. work will proceed. ( CLOSED ITEM )
Item 55 Turbine Building Mat Repair at Pier KC 3 J. Fisher stated the grout repair has been completed and the forms removed.
Visual observations and soundings indicate that the void areas previously detected have been successfully repaired. Installation of the upper leveling plate may now proceed. (CLOSES OUT ITEM 55-3) l l
l e
i
1 I
- o.
- FotasofDailyMestinh.k IndspIndant Ansaasmtnt of Undcrpinning Midland Plant Units 1 & 2
- Consumers Power Company Held at Midland Site Location
- ' Midland, Michigan , ,
October 7,1983 Present For:
Consumers Power Bechtel MPOAD Stone & Webster G. Murray J. Fisher G. Carpenter A. Scott R. Wieland E. Cvikl J. Springer J. Gaydos M. Blendy Parsons J. Ratner Purpose This meeting is held 'each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 55 West Access Shar't Level C Waler Beam Seats.
J. Fisher stated that the NCR was changed to a rework condition because of tolerances that were existingo 'n the waler installation. Until the Level C waler plates are installed for the connection on the Turbine Building and for the connection at the Buttress Access Shaft, the actual level required for the Beam Seats is indeterminate at this time and could possibly not be within the required tolerances. ( CLOSES ITEM 55-22 )
Item 55-31 - Service Water Pump Structure Soldier Piles.
J. Fisher stated that installation of soldier piles was stopped due to problems encountered when installing Soldier Pile No.16 . When drilling, a boulder was encountered and was pushed down leading to a question _
concerning the subgrade. Project Engineering is investigating. (OPEN ITEM)
Item 55 concrete Trucks.
R. Weiland questioned why the concrete trucks did not have the mixer drum turning when not discharging concrete. It was observed on the concrete placement of October 6,1983 that one truck did not have the drum turning for approximately ten minutes. Mr. Wieland stated that Bechtel should directJ.
the concrete supplier to maintain the drums turning to the extent possible.
Gaydos will see that concrete truck drivers are instructed and taught that at all times their drums be revolving.at idle speed when not discharging concrete."
( CLOSED ITEM ) ,
Item 55 Removal of Concrete.
J. Ratner questioned whether or not the Contractor has investigated the procurement of equipment for the breaking and removal of concrete encountered during excavation. J. Fisher stated that the procurement of equipment is on the agenda of the management meeting today at Ann Arbor with the client.
( CLOSED ITEM )
- - , - -