TABLE 3.3-1 (Continued)
TABLE NOTATIONS i
'Only if the reactor trip breakers happen to be in the closed position and the Control Rod Drive System is capable of rod withdrawal.
bBelow the P-6 (Intermediate Range Neutron Flux Interlock) Setpoint.
l
- Below the P-10 (Low Setpoint Power Range Neutron Flux Interlock) Setpoint.
dAbove the P-7 (At Power) Setpoint t
' Del eted.
'Above the P-8 (3-loop flow permissive) Setpoint.
i
'Above the P-7 and below the P-8 Setpoints.
" Deleted.
'Above the P-9 (Reactor trip on Turbine trip Interlock) Setpoint.
ACTION STATEMENTS ACTION 1 - L'ith the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 2 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
The inoperable channel is placed in the tripped condition a.
within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.
The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1, and Either, THERMAL POWER is restricted to less than or equal to c.
75% of RATED THER*1AL POWER and the Power Range Neutron Flux Trip Setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per Specification 4.2.4.1.
l COMANCHE PEAK - UNITS 1 AND 2 3/4 3-5 Unit 1 - Amendment No. 10,11,15,20,36 Unit 2 - Amendment No. he,22 qso p 020D 9504240240 950418 DR ADOCK 050004 5
L TABLE 3.3-1 (Continued)
ACTION STATEMENTS (Continued)
ACTT.ON 3 With the number of channels OPERABLE one less than the Minimum Channels OPERABLE requirement and with the THERMAL POWER level:
Below the P-6 (Intermediate Range Neutron Flux Interlock) a.
Setpoint, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER shove the P-6
- Setpoint, b.
Above the P-6 (Intermediate Range Neutron Flux Interlock)
Setpoint but below 10% of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 10% of RATED THERMAL POWER.
ACTION 4
- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, suspend all operations involving positive reactivity changes.
ACTION 5
- With the number of OPERABLE channels one less than the Minimum l
Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or within the next hour open the reactor trip breakers and suspend all operations involving positive reactivity changes.
With no channels OPERABLE complete the above actions within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
1 ACTION 6
- With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
The inoperable channel is placed in the tripped condition a.
within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and b.
The Minimum Channels OPERABLE requirement is met; however, l
the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.
ACTION 7
- With less than the Minimum Number of Channels OPERABLE, within I hour determine by observation of the associated permissive annunciator window (s) that the interlock is in its required state for the existing plant condition, or apply l
Specification 3.0.3.
l l
l CDMANCHE PEAK - UNITS 1 AND 2 3/4 3-6 Unit 1 - Amendment No. 44,44,46, 20 Unit 2 - Amendment No. 4,6
-