Text
- -__
TENNESSEE VALLEY? AUTHORITY
/ a*
~
- ;r, MWet996 S64f6%SEeweygp r
e rj t10'! 25 PY;*N BLRD-50-438/83-57 BLRD-50-439/83-50 U.S. Nuclear Regulatory Commission Region-II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - DISAGREEMENT IN MODE ANALYSIS DATA I
- BLRD-50-438/83-57, BLRD-50-439/83 FIRST INTERIM REPORT t
The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on October 24, 1983 in accordance with 10 CFR 50 55(e) as NCR BLN CEB 8307. Enclosed is our first interim report. We expect to submit our next report by December 21, 1984.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Nanaa;er Nuclear Licensing Enclosure Mr. Richard C. DeYoung, Director (Enclosure) oc:
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20E55 Records Center (Enclosure)
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l
l P"ICIAL COPY 8312010256 831122
.GFF PDR ADOCK 05000438 S
PDR 1983-TVA 50m ANNIVERSARY f
An Equal Opportunity Employer
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2
/
DISAGREEMENT IN MODE ANALYSIS DATA BLRD-50-438/83-57, BLRD-50-439/83-50 NCR BLN CEB 8307 10 CFR 50.55(e)
FIRST INTERIM REPORT Descriotion of Deficiency Mode analysis data for problem N4-1(2)ND-H that was developed by TVA's Division of Engineering Design (EN DES) Bellefonte Design Project (BLP) does not agree with the existing mode analysis data used at the interface points with the other connecting problems. The original mode analysis that was developed by Teledyne Engineering Service (TES) for TVA's Civil Engineering Support Branch (CEB) Reports also does not agree at the problem interface points. Due to the inadequacies that exist against the content of the TES analysis (CEB reports) and the lack of control of all these CEB reports, dealing with operating mode evaluations, all problems may be affected.
Interim Progress The existing operating mode analysis reports are in the process of being controlled in accordance with CEB Engineering Procedure (EP) 21.38. All operating mode reports will be revised and issued by Bellefonte Design Project (BLP). BLP is presently scheduling this work.
.