Forwards Five Yr Rept of ECCS Outages
ML20082C716
Person / Time
Site: Limerick Constellation icon.png
Issue date: 03/30/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.17, TASK-TM NUDOCS 9504070127
Download: ML20082C716 (11)


Text

- - - _-

' ttation sues,ert t.psrimsnt.

i NUREG-0737, item ll.K3.17 v

PECO ENERGY if, am"ne,.

965 Chesterbrook Boulevard Wayne. PA 19087 5691 March 30,1996 Docket No. 50-353 -

License No. NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subject. Limerick Generating Station, Unit 2 Five Year Report of Emergency Core Cooling System Outages

)

Gentlemen-This letter is being submitted in response to the requested action specl6ed in NUREG4737,

)

" Clarification of TMl Action Plan Requirements," Action item II.K3.17, " Report on Outages of..

Emergency Core Cooling Systems Licensee Report and Proposed Technical Specincation Changes," for Umerick Generating Station (LGS), Unit 2. By letter dated October 31,1980, the NRC issued NUREG-0737 to licensees of operating power reactors and applicants for operating -

licenses providing specific Three M5e Island (TMI) related action item issues which the NRC recommended for implementation. Specifically, TMI Action item II.K3.17 requested that -

licensees submit a report detaling outage dates and length of outages for all of the Emergency 4

Core Cooling Systems (ECCS) for the last five (5) years of operation. However, since LGS, Units 1 and 2, were not licensed and were under construction at the time the NRC issued NUREG-0737, PECO Energy Company committed to reporting the ECCS outage data for the first Ove (5) year period beginning with the date of commercial operation for each unit. The NRC accepted our schedule for providing this information as documented in the LGS Safety Evaluation Report (SER) NUREG 0901 dated August 1983, Section 15.9, 'TMI Action Plan '

Requirements.". The five (5) year period began for Unit 1 on February 1,1986, when Unit 1 began commercial operation and ended on February 1,1991. The ECCS outage data report for 3

Unit I was subsequently submitted by letter dated AprH 8,1991. The five (5) year period for Unit 2 began on January 8,1990, when Unit 2 began commercial operation and ended on January 8, 1995.

The attached ECCS outage data for LGS Unit 2 covering the period January 8,1990 through January 8,1996, is provided in tabular form and contains the following information as requested in NUREG-0737.

1).

The ECCS outage dates and durations.

2)

The cause of outage 3)

The speclRc ECCS involved in the outage.

4)

Any corrective action taken.

9504byb127i950330' i

PDR ADOCK 05000353

.p E

.PDR g

March 30,1995 Page 2 J

During the five (5) year reporting period, plant Administrative Guulelines (AGs) concoming ECCS outages were developed and implemented based on applications of the LGS Prahahalatb Risk Assessment (PRA) to plant maintenance. These AGs provide 1) decielon making and planning guidance for performing ECCS outages based on the LGS PRA and sound operating judgement; i

2) guidance concoming the prioritization, planning, and scheduling d maintenance on ECCS and related equipment addressed in the LGS PRA; and 3) identification of plant J

l systems / equipment considered to be important to safety on the basis of the LGS PRA. As a result of ' i@,

_! -i and application of these AGs, ECCS outages and durations are kept to l

s-

^

a minimum, thereby enhancing system reliabilty._

j-If you have any questions, or require additional information, please do not healtate to contact us.

j very tndy yours, e

G. A. Hunger, Jr.

i Director - Licensing i

a i

Attachment l

cc:

T. T. Martin, Administrator, USNRC, Region I (w/ attachment) l N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachment)l i.

i I

i l

i i

i j

f f

i 1

d t

r 1

1 i

1 4

l l

1 1

s

t i

t i

l a

i 3

5 i

i l.

f i

5 i

i 1

ATTACHMENT 4

4 l

Umerick Generating Station Unk2 i

(

Emergency Core Cooling System (ECCS)

Inoperability Summary Report 1

i 4

5 i

4 i,

a e

4 i

l

i Page 1 l.

j ATTACHMENT UMERICK GENERATING STATION, UNIT 2 l

' EMERGENCY CORE COOUNG SYSTEM INOPERABluTY

SUMMARY

l i

4 SYSTEM DIOP TBE OPERWERY TBE FORCED /

CAUW/CORAENTS j

AFFECTED MTE DATE PUWedED

'B'CS 11/30/89 1236 12/1/09 0045 Planned Local Laek Rate Testing HPCI 12/1/80 1235 12/2/09 0315 Forood Faulty Umit Switch l

Div 3 ADS 2/2s/90 1325 2/2s/90 2200 Forood Trip Unite for CS/RHR Pump lbnning Alarm Failed HPCl 3/8/90 1515 3/8/90 1946 Forood Broken Air Line to Volvo HV4tHtF028 l

HPCI 3/21/90 1120 3/21/90 1246 Planned Routine Test. Steam Bolence Chamber."

..a; HPCI 3/23/90 1730 3/23/90 1900 Planned Survoulance Testing T CS 3/26/90 0710 3/26/90 0749 Forood Problems with Valve HV 62-2F0158 j

HPCI-4/17/90 1103 4/18/90 0640 Planned Replacement of Defoodve Transmitter l

"D"CS 4/26/90 0400 4/28/90-2130 Planned Preventive Maintenanos ActMties l

"D"LPCI 5/23/90 0000 5/23/90 2140 Planned Preventive Maintenance ActMties l

'N CS 6/14/90 Ce00 6/16/90 0215 Planned Preventive Maintenance ActMties l

'N LPCI 8/1/90 0300 8/2/90 2130 Planned Preventive Maintenance ActMdes HPCI 9/16/90 1712 9/16/90 1820 Forced Troubischoodng of Low AP Reading l

HPCI 9/20/90 0840 9/20/90 1007 Planned Routine Toot - Stoem Belance Chamber Adjustment HPCI 10/1/90 2247 10/1/90 2254 Planned Snubber Replacement ActMeios "NRHR 10/2/90 1130 10/2/90 1627 Planned Proventive Maintenance ActMtlee j

'N RHR 10/3/90 0935 10/3/90 1910 Planned Proventive Maintenance ActMties l

HPCI 10/3/90 1925 10/3/90 1931 Planned Drain Pot Level Swhoh Check l

HPCI 10/17/90 1300 10/17/90 1530 Planned Packing Adjustment to Valve HV-55-2F001

]

i

}

HPCI 12/6/90 0613 12/9/90 0235 Planned Proventive Maintenance ActMties j

i "N CS 12/19/90 0030 12/21/90 1200 Planned Preventive Maintenance ActMties i

1 "N RHR 1/22/91 0110 1/24/91 0530 Planned Proventive Maintenance ActMties a

j T CS 1/24/91 0200 1/25/91 1300 Planned Preventive Maintenanos ActMties

}

'NRHR 1/27/91 1129 1/27/91 1215 Planned Surveillance Testing

'C'RHR 1/27/91 1337 1/27/91 1368 Planned Surveillance Testing

)

"C" RHR 2/11/91 0001 2/12/91 1622 Planned Preventive Maintenance ActMties j

T CS 2/12/91 1006 2/12/91 1150 Planned Surveinanos Testing l

Div 1 ADS 2/13/91 0902 2/13/91 0915 Planned Surveillance Testing 1

l Div 3 ADS 2/13/91 0917 2/13/91 0927 Planned Surveillance Testing "B"RHR 2/28/91 0042 3/1/91 1466 Planned Preventive Maintenance ActMties 4

HPCI 2/25/91 1320 2/25/91 1520 Planned Surveillance Testing j

'N RHR 2/26/91 1005 2/28/91 1030 Planned Surveillance Testing

'B' LPCI 2/28/91 0042 3/1/91 1456 Planned Preventive Maintenance ActMties HPCI 3/1/91 1745 3/1/91 1846 Planned Preventive Maintenance ActMties

i i

Page 2 l-ATTACHMENT I

UMERICK GENERATING STATION, UNIT 2

' EMERGENCY CORE COOUNG SYSTEM INOPERABluTY

SUMMARY

i j

SYSTEM INOP TREE OPERAMEJTY TIME FORCED /

CAUSEpnamgrg AFFECTED DATE MTE PLANNED T LPCI 3/2/91 0924 3/2/91 0949 Planned Surveillance Testing T LPCI 3/5/91 0043 3/6/91 1245 Planned Preventive Maintenance ActMties "N LPCI 3/6/91 1300 3/6/91 1415 Planned Surveillance Testing "D" LPCI 3/7/91 0749 3/7/91 1001 Planned Surveillance Testin0 HPCI 3/8/91 1315 3/8/91 1335 Planned Take Oil Sample From Auxiliary 011 Pump 4

T CS 3/9/91 1005 3/9/91 1058 Planned Surveillance Testing N CS 3/18/91 0430 3/19/91 20e0 Planned Local Laak Rate and Surveillance Testing T CS 3/20/91 0440 3/21/91 2200 Planned Survomance Testing i

"B" LPCI 3/20/91 0921 3/20/91 1029 Planned Survelhance Testing i

7 LPO!

3/20/91 1030 3/20/91 1210 Planned Survomance Testing "B' CS 3/25/91 0115 3/25/91 0530 Planned CS Header Flushing N CS 6/12/91 0500 6/12/91 1817 Planned Proventive Maintenance ActMties j

HPCI 6/17/91 1803 6/17/91 1957 Planned Surveillance Testing i

T CS 6/25/91 0200 6/27/91 2230 Planned Preventive and Corrective Maintenance ActMties

'D"LPCI 8/20/91 2357 8/23/91 2147 Planned Proventive Maintenance ActMties

'N LPCI 9/5/91 1705 9/5/91 1840 Planned Surveillance Testing

  • C" LPCI 9/5/91 1840 9/5/91 1922 Planned Surveillance Testing i

HPCI 9/10/91 0100 9/14/91 1700 Planned Proventive Maintenance l

'N LPCI 10/4/91 1300 10/4/91 1804 Planned Surveillance Testing and Replacement of Trip Unit j

HPCI 10/7/91 0921 10/7/91 0949 Planned Surveillance Testing

'C"LPCI 10/10/91 1030 10/10/91 1130 Planned Replacement of Rosemount Trip Unit

)

"B"LPCI 10/15/91 1911 10/15/91 1929 Planned Surveillance TestinD v LPCI 10/15/91 1930 10/15/91 1946 Planned Surveillance Testing f

'N & 'C' 11/4/91 0400 11/6/91 0100 Forced Repair of Emergency 5 avice Water Pipe Leak j

RHR j

v CS 11/4/91 0400 11/6/91 0100 Forced Repair of Emergency Servios Water Pipe taak

'N LPCI 11/4/91 0400 11/6/91 0100 Forced Repair of Emergency Service Water Pipe Leak -

HPCI 11/13/91 1510 11/14/91 0030 Forced Failure of HPCI to Meet Minimum Flow Criterla During Testing

'D" RHR 11/14/91 1450 11/14/91 1913 Forced High Point Vent Low 1AV/

4

'N RHF.

11/15/91 0000 11/15/91 1135 Forced Vibration Monitoring ActMties N Cs ~

11/25/91 0216 11/27/91 1500 Planned Proventive Maintenance ActMties 1

'N "HR 12/2/91 1030 12/2/91 1100 Planned Surveillance Testing 4

"C"RHR 12/2/91 1411 12/2/91 1434 Planned Surveillance Testing

Page 3 ATTACHMENT UMERICK GENERATING STATION, UNIT 2 EMERGENCY CORE COOUNG SYSTEM INOPERABILITY

SUMMARY

SYSTEM NOP TIME OPERABILITY TIME FORCED /

CAUSE/ry= =~4TS AFFECTED MTE MTE PLANNED HPCI 12/5/91 0955 12/5/91 1353 Planned Surveillance Testing l

HPCI 12/10/91 2147 12/18/91 0513 Forced Torque Switch Setting Adjustments to Valve HV-55 2F003 HPCI 12/10/91 1749 12/10/91 1930 Planned

" VOTES" Testing on Valve HV-55 2F003

'A' LPCI 12/26/91 0330 12/26/91 2207 Planned Blocked to Megger Motor

'A' RHR 12/27/91 0830 12/27/91 0853 Planned Surveillance Testing

'B' CS 12/30/91 0515 12/30/91 1730 Forced Oil Leak from Pump Lower Bearing Oil Plug

  • D"RHR 1/4/92 0650 1/4/92 1358 Forced Trip Card Failure and Replacement "D"CS 1/4/92 0650 1/4/92 1358 Forced Trip Card Failure and Replacen.vrt HPCI 1/4/92 0658 1/4/92 0738 Forced HPCIisolated Due to Troubleshooting Activities for Reactor Pressure Card Failure "C"RHR 1/9/92 1710 1/9/92 1750 Planned Pump, Valve, and Flow Testing HFCI 1/28/92 0315 1/28/92 2230 Planned Preventive Maintenanoo Activities HPCI 1/29/92 1030
  • /IG/L 1200 Planned Surveillance Testing "D"LPCI 2/3/92 1434 2/4/92 2245 Forced Failed Suryslilance Test HPCf 2/5/92 1128 2/6/92 1420 Planned Preventive Maintenance Activities HPCI 2/6/92 1420 2/3/92 2015 Planned Preventive Maintenance Activities
  • D"LPCI 2/9/92 0132 F/9/92 0155 Planned Surveillance Testing "B"LPCI 2/9/92 0051 2/9/92 0131 Planned Surveillance Testing "C"LPCI 2/24/92 0120 2/24/92 0138 Planned Survelilance Testing "A'LPCI 2/24/92 0058 2/24/92 0111 Planned Surveillance Testing HPCI 2/24/92 1440 2/24/92 2000 Forced Invertor Fuse Failure HPCI 2/26/92 1222 2/28/92 2105 Forced invertor Fuse Failure

'B' CS 3/3/92 0010 3/7/92 1130 Planned Proventive Maintenance ActMties HPCI 3/13/92 0800 3/13/92 0917 Planned Surveillance Testing "C" LPCI 3/14/92 1024 3/14/92 1136 Planned Surveillance Testing

'A'LPCI 3/16/92 1205 3/16/92 1210 Planned Surveillance Testing I

HPCI 3/23/92 2126 3/23/92 2301 Planned Surveillance Testing HPCI 4/14/92 0830 4/15/92 1030 Planned

" VOTES" Testing of Valve HV-55-2F001 "A"CS 4/16/92 1105 4/16/92 1512 Planned Emer9ency Service Water System Problems

  • A* & "C" 4/16/92 1105 4/16/92 1512 Planned Emergency Service Water System Problems LPCI
  • A'CS 4/20/92 1425 4/20/92 2055 Planned Emergency Service Water System Problems

'A' & *C' 4/20/92 1425 4/20/92 2055 Planned Emergency Service Water System Problems LPCI HPCI 4/25/92 0655 4/27/92 1350 Planned Emergency Service Water System Problems

Page 4 l

ATTACHMENT UMERICK GENERATING STATION, UNIT 2

' EMERGENCY CORE COOUNG SYSTEM INOPERABluTY

SUMMARY

SYSTEM NOP TIME OPERABERY TREI FORCED /

C W

,TS AFFECTED MTE MTE PUWNED

'B' & 'D' 4/25/92 0655 4/27/92 1350 Planned Emergency Servloe Water System Problems LPCI

'D' LPCI 4/27/92 1857 4/27/92 1902 Planned Surveillance Testing

  • C"LPCI 5/6/92 0037 5/6/92 1715 Forced Faulty PIS Card
  • N CS 5/6/92 0037 5/6/92 1715 Forced Faulty PiS Card "A*CS 5/15/92 1430 5/15/92 2130 Planned Emergency Service Water System inoperable

'N LPCI 5/15/92 1430 5/15/92 2130 Planned Emergency Servloe Water System inoperable

'C' LPCI 5/15/92 1430 5/15/92 2130 Planned Ecrsg.c~y Service Water System inoperable "B' CS 5/25/92 1130 5/25/92 1140 Planned Surveillance Testing HPCI 5/21/92 2104 5/21/92 2247 Planned Surveillance Testing

'A'LPCI 6/8/92 0345 6/8/92 0407 Planned Surveillance Testing

'A'LPCI 6/22/92 1400 6/22/92 2242 Forced Troubleshooting of Valve HV 512F048A

'N LPCI 6/23/92 1200 6/24/92 0445 Planned Removal of Flow Orifice in RHR System

'C'LPCI 6/23/92 1200 6/24/92 0445 Planned Removal of Flow Orifice in RHR System "B"LPCI 6/24/92 1940 6/25/92 0445 Planned Removal of Flow Orifice in RHR System "D" LPCI 6/24/92 1940 6/25/92 0445 Planned Removal of Flow Orifee in RHR System

'B' LPCI 7/8/92 0930 7/8/92 1245 Planned

" VOTES

  • Testing of Suction Valve

'B' LPCI 7/9/92 0449 7/11/92 2010 Planned Maintenance Activities on Motor and Seal Cooler

'C' LPCI 7/9/92 1730 7/21/92 1707 Forced inadequate Flow for Unit Cooler in Room "N LPCI 7/18/92 2115 7/19/92 0000 Planned Emergency Service Water System Heat Transfer Testing "N LPCI 7/19/92 2100 7/20/92 1900 Planned Emergency Service Water System Heat Transfer Testing HPCI 7/22/92 0505 7/25/92 1850 Planned

' VOTES

  • Testing of Vacuum Breaker HPCI 7/30/92 1345 7/30/92 1737 Planned Emergency Service Water System Heat Transfer Testing
  • D"CS 8/17/92 0845 8/21/92 1005 Planned System inspections HPCI 8/22/92 0530 8/22/92 1908 Planned.

" VOTES

  • Testing on Valve HV-55-2F005 "NRHR 8/31/92 0252 9/2/92 0633 Planned Preventive Maintenance Activities

'A' LPCI 9/3/92 0630 9/3/92 1400 Planned Surveillance Testing "B' LPCI 9/6/92 1115 9/6/92 1224 Planned Surveillance Testing

'D'LPCI 9/6/92 1411 9/6/92 1726 Planned Surveillance Testing "D"LPCI 9/15/92 0853 9/15/92 1444 Planned Surveillance Testing

'B' LPCI 9/28/92 1905 10/1/92 1901 Planned Preventive Maintenance Activities HPCI 10/5/92 2339 10/11/92 1849 Planned Proventive Maintenance Activities

'NRHR 11/1/92 0526 11/4/92 1015 Forood Pump Tripped on Overcurrent Motor Lead Falled l

HPCI 11/7/92 2148 11/7/92 2300 Planned Surveillance Testing

Page 5 i.

4 l

ATTACHMENT i

i UMERICK GENERATING STATION, UNIT 2 j

' EMERGENCY CORE COOUNG SYSTEM INOPERABluTY

SUMMARY

j SYSTEM IMOP TIME OPGMBERY TE8E FORCED /

CADOE/OOMMENTS AFFECTED MTE ETE PUNNED HPCI 11/8/92 0053 11/8/92 0143 Planned Surveillance Testing

'B' RHR 11/16/92 0145 11/16/92 2138 Planned Ire of Pump Motor Leeds

'C' RHR 11/17/92 1830 11/18/92 0866 Planned inspection of Pump Motor Leeds

'D'RHR 11/18/92 0904 11/19/92 0300 Planned inspection of Pump Motor Leads T RHR 11/20/92 0500 11/21/92 0537 Planned Reworked Pump Motor Leads "N RHR 11/23/92 0330 11/25/92 0823 Planned Proventive Maintenance AceMiles

{

T RHR 12/5/92 0846 12/5/02 2156 Planned Blocked for Work on Valve HV612F0248 "B"RHR 12/9/92 1525 12/9/92 1563 Forced

@ ism Flush to Reduce Radiation Levels i

T CS 12/15/92 0430 12/17/92 0615 Planned Local Leak Rate Testing

  • C"RHR 12/15/92 1030 12/19/92 1040 Planned Surveillance Testing 4
  • NRHR 12/21/92 2100 12/22/92 0100 Planned Surveillance Testing i

T LPCI 12/22/92 1438 12/22/92 1802 Planned Survemance Testing

'B' RHR 12/23/92 1235 12/23/92 1307 Forced System Flush to Reduce Radiation Levels l

HPCI 12/28/92 1010 12/28/92 1046 Planned Surveillance TestinD

{

HPCI 12/29/92 1145 12/30/92 0647 Planned Preventive Maintenance ActMties "D" RHR 1/8/93 1446 1/8/93 1501 Planned Surveillance Testing I

"D"RHR 1/9/93 0930 1/9/93 1030 Planned Surveillance Testing f

"D'RHR 1/9/93 2106 1/9/93 2215 Planned Surveillance Testing l

'B'RHR 1/9/93 2218 1/9/93 2280 Planned Surveillance Testing "D"RHR 1/12/93 1648 1/12/93 1737 Planned Surveillance Testing

'C'RHR 1/12/93 2012 1/15/93 2236 Planned Proventive Maintenance ActMties HPCI 1/16/93 0202 1/18/93 0347 Planned Survolliance Testing i

"N CS 1/18/93 0000 1/20/93 0150 Planned Surveillance Testing "N CS 2/1/92 2/14/93 2121 Planned Preventive Maintenance ActMties - Refueling Outa0e Planned Proventive Maintenance ActMties Refuelino Outa0e HPCI 2/1/93 2/28/93 Planned Preventive Maintenance ActMties Refueling Outage

'N LPCI 2/1/93 2/28/93 Planned Proventive Maintenance Activities Refueling Outa0e T LPCI 2/1/93 2/28/93

  • C"LPCI 2/1/93 2/17/93 0735 Planned Preventive Maintenance ActMties Refueling Outage Planned Preventive Maintenance ActMties Refueling Outage

'D'LPCI 2/18/93 1440 2/28/93 T CS 2/18/93 1440 2/28/93 Planned Preventive Maintenance ActMties Refueling Outage T CS 3/1/93 0001 3/7/93 2120 Planned Proventive Maintenance ActMties - Refueling Outa08 j

T LPCI 3/1/93 1993 3/11/93 2115 Planned Preventive Maintenance ActMties Refueling Outage

'N LPCI 3/1/93 1993 3/13/93 1412 Planned Preventive Maintenanos ActMties - Refueling Outage "D" LPCI 3/1/93 0001 3/13/93 1412 Planned Preventive Maintenance ActMties Refueling Outace

Page 6 ATTACHMENT UMERICK GENERATING STATION, UNIT 2 EMERGENCY CORE COOUNG SYSTEM INOPERABluTY

SUMMARY

SYSTEM INOP TIME OPEMBERY TBdE FORCED /

CAUGE/CrwaswTS AFFECTED MTE MTE PLANNED HPCI 3/1/93 0001 3/14/93 1412 Planned Preventive Maintenance Activities. Refueling Outage "C" LPCI 3/7/93 1115 3/7/93 1125 Planned Surveillance Testing

'B' CS 3/8/93 1323 3/8/93 1410 Planned Surveillance Testino - Filling and Voating HPCI 3/15/93 2030 3/16/93 0520 Planned

" VOTES" Testing of Valve HV-55-2F001 HPCI 3/22/93 1034 3/22/93 1115 Planned Surveillance Testing HPCI 3/22/93 1336 3/22/93 1409 Planned Survolitance Testing

'C' RHR 4/26/93 0500 5/1/93 1010 Planned inspection of Pump Motor Leeds "C"LPCI 5/1/93 0000 5/1/93 1010 Planned Maintenance Activity. Thermography

  • D-LPCI 5/4/93 0354 5/5/93 0400 Planned Maintenance Activity. Thermography "C"LPCI 5/23/93 1930 5/29/93 0055 Planned Reworked Pump Motor tsads HPCI 6/4/93 0905 6/4/93 0930 Planned Surveillance Testing HPCI 6/14/93 0900 6/14/93 0930 Planned Surveillance Testing HPCI 6/16/93 2140 6/16/93 2211 Planned

" VOTES" Testing of Suction Valve "B"LPCI 6/24/93 1349 6/24/93 1358 Planned Surveillance Testing

'D'LPCI 6/24/93 1407 6/24/C3 1417 Planned Surveillance Testing HPCI 6/25/93 1015 6/25/93 1120 Planned Surveillance Testing Div 3 ADS 6/25/93 1945 6/26/93 1108 Forced Failed Surveillance Test. Replace Faulty Relay "A*CS 7/5/93 1910 7/10/93 0150 Planned Preventive Maintenance Activities HPCI 7/13/93 2000 7/15/93 2035 Planned Preventive Maintenance Activities HPCI 7/16/93 1228 7/17/93 0720 Forced Replace Defective AP Transmitter

  • B'CS 7/18/93 1935 7/22/93 2010 Planned Preventive Maintenance Activities

'A' RHR 8/1/93 0928 8/1/93 0938 Planned Surveillance Testing "A*RHR 8/1/93 1033 8/1/93 1945 Planned

" VOTES" Testing and Preventive Maintenance Activities "B*RHR 8/30/93 0250 9/2/93 232,0 Planned Preventive Maintenance Activities HPCI 9/2/93 2345 9/3/93 2131 Forced Repair Packing Leak in Valve HV-55 2F054 HPCI 9/7/93 1023 9/7/93 1034 Forced Lube Oil Pressure Setpoint Adjustments HPCl 9/15/93 1310 9/15/93 1412 Planned

' VOTES

  • Testing. Equipment Removal HPCI 9/15/93 0755 9/15/93 0945 Planned

" VOTES" Testing. Equipment Rornoval "D"RHR 9/20/93 1038 9/20/93 1300 Forced Pump, Valve and Flow Test Discharge Valve Stuck Open HPCI 9/23/93 1455 9/23/93 2225 Forced Replacement Oil Pump Relief Valve HPCI 10/4/93 2010 10/4/93 2041 Planned Survoihnce Testing HPCI 10/30/93 2005 10/30/93 2030 Planned Surveillance Testing

'8" RHR 11/21/93 0400 11/22/93 0138 Planned inspection Activities. Thermography HPCI 11/27/93 0145 11/27/93 0424 Planned Surveillance Testing

[

Page 7 j

ATTACHMENT UMERICK GENERATING STATION, UNIT 2 i

j EMERGENCY CORE COOUNG SYSTEM INOPERABluTY

SUMMARY

i i

SYSTEM BdOP TadE OPEMBERY TREE FOR(XV CAUSE/COREMBff8 1

MECTED MTE MTE PUfedED HPCI 11/28/93 1986 12/5/93 1240 Planned Proventive Maintenance ActMuse "D"RHR 12/5/93 2304 12/10/93 1640 Planned Proventive Maintenance ActMties and Thermography

'B'RHR 12/10/93 0108 12/10/93 0146 Planned Surveillance Testing Div 1 ADS 12/14/93 1838 12/15/93 2248 Forced Replace Defoodwo Prosaure indloator j

HPCI 12/22/93 1306 12/22/93 1427 Planned Survoulence Testing T RHR 12/28/93 0131 12/28/93 0152 Planned Surveelance Testing "C" RHR 12/28/93 0210 12/28/03 0222 Planned Surveillance Testing HPCI 1/21/94 2124 1/22/94 0250 Planned Surveillance Testing HPCI 1/24/94 1705 1/24/94 1818 Planned SurveiNanos Teodng T & "C" 2/16/94 0210 2/18/94 1715 Planned Emergency Service Water System Outage ActMties RHR T CS 2/16/94 0210 2/18/94 1715 Planned Emergency Servios Water System Outage ActMties HPCI 3/2/94 1806 3/2/94 1840 Planned SurvelHence Testing I

HPCI 3/2/94 2347 3/3/94 0041 Planned Survel Nance Testing T CS 3/14/94 0846 3/14/94 0851 Planned Surveluence Testing HPCI 3/21/94 0936 3/22/94 0015 Planned Surveillance Testing HPCI 3/23/94 1710 3/23/94 1725 Planned Surveillance Testing T RHR 4/14/94 1344 4/14/94 1530 Planned Surveinance Teodng HPCI 4/18/94 1815 4/18/94 1868 Planned Surveillance Teeung HPCI 4/18/94 2056 4/18/94 2227 Planned Surveillance Testing B LPCI 5/9/94 0300 5/11/94 2236 Planned

" VOTES" Testing of Valve HV-51-2F0078 "B*RHR 5/12/94 0845 5/12/94 0920 Planned Surveillance Testing HPCI 5/16/94 0825 5/16/94 1930 Planned

" VOTES

  • Teodng of Valve HV 56-2F001 HPCl 5/17/94 1721 5/17/94 1815 Planned Surveillance Testing HPCI 5/17/94 2045 5/17/94 2136 Planned Surveillance Testing HPCI 5/23/94 1005 5/23/94 1140 Planned Surveillance Testing "D" LPCI 5/26/94 0000 5/26/94 1061 Planned Surveillance Teodng
  • D" RHR 5/26/94 1220 5/26/94 1242 Planned Valve Stroke Testing

'B'RHR 5/27/94 1300 5/27/94 1420 Planned Surveillance Testing HPCI 6/10/94 1333 6/10/94 1741 Planned Surveillance Testing HPCI 6/13/94 1835 6/14/94 0408 Planned Surveillance Teodng "D" RHR 6/18/94 1715 6/18/94 1747 Planned Surveillance Testing

'B'RHR 6/18/94 1751 6/18/94 1820 Planned Surveillance Testing "D"LPCI 7/7/94 1017 7/7/94 1063 Planned Room Unit Cooler inspection Actrvities i

Page8 ATTACHMENT UMERICK GENERATING STATION, UNIT 2 EMERGENCY CORE COOUNG SYSTEM INOPERABILITY

SUMMARY

i SYSTEM NDP TBE OPERABEJTY TBE FORCED /

CAUSE/rmusWTS l

AFFECTED MTE DATE PUWNED i

HPCI 8/8/94 0845 8/8/94 0936 Planned Surveillance Testing HPCI 8/15/94 0342 8/15/94 1830 Planned Mjust Pecking ten Valve HV45-2F042 HPCl 9/6/94 1814 9/6/94 1828 Planned Surveillance Testing HPCI 9/18/94 1553 9/18/94 1800 Planned Surveillance Testing

'N LPCI 9/27/94 0400 9/29/94 0115 Planned Perform Maintenance on Valve HV-512F088A "C" LPCI 9/27/94 0400 9/28/94 0110 Planned Perform Maintenance on Valve 11 2011

'A'CS 9/27/94 0400 9/28/94 0110 Planned Perform Maintenance on Valve 11-2011 HPCI 10/4/94 0224 10/4/94 0251 Planned Surveillance Testing "D" RHR 10/11/94 1335 10/11/94 2107 Planned install Oil Fitting on Motor Bearing Housing

  • C" RHR 10/11/94 0435 10/11/94 2107 Planned Surveillance Testing. Local bak Rate Testing HPCI 10/15/94 0125 10/15/94 0222 Planned Surveillance Testing HPCI 10/17/94 0300 10/17/94 0350 Planned Surveillance Testing

'B" RHR 10/24/94 2330 10/26/94 1818 Planned Preventive Maintenance Activities "B'RHR 10/24/94 0000 10/24/94 1840 Planned Cleaning and Calibrating Breaker HPCI 10/30/94 2200 11/4/94 1016 Planned Preventive Mainionance Activities

'D" RHR 11/14/94 0000 11/18/94 1706 Planned Preventive Maintenance Activities "C" CS 11/20/94 2002 11/23/94 2245 Planned Preventive Maintenance Activities

'8*CS 12/5/94 0110 12/18/94 1048 Planned Preventive Maintenance Activities HPCI 12/13/94 1104 12/13/94 1136 Planned Data Collection on Barometric Condenser "A"LPCI 12/19/94 0400 12/20/94 1445 Planned Preventive Maintenance Activities "C" RHR 12/20/94 1000 12/20/94 1440 Forced Barrier Breach Due to Open Door

'A'RHR 12/22/94 0930 12/22/94 1200 Planned Surveillance Testing - Logic System Functional Test

  • B"RHR 12/27/94 1024 10/27/94 1110 Planned Surveillance Testing

'C' RHR 12/28/94 0038 12/28/94 0947 Planned Surveillance Testing "NRHR 12/28/94 1047 12/28/94 1104 Planned Surveillance Testing "D" PJ4R 12/29/94 1018 12/29/94 1032 Planned Surveillance Testing "C"CS 1/4/95 1320 1/4/95 1352 Forced Troubleshooting of Flow Switch Table Notes.

CS. Core Spray System LPCI. Low Pressure Coolant injection System RHR Residual Heat Removal System (LPCI Mode)

ADS Automatic Depressurization System HPCI. High Pressure Coolant injection System

- Time Unavailable (Refueling Outage)