i A
B ALTIMORE OAS AND ELECTRIC CHARLES CENTER
- P O BOX 1475 o GALTIMORE, MARYLAND 21203-1475 4 L DENTON Ot NL ftAL MANAar H July 12,1991 cAtvint cts rs U.S. Nuclear Regulatory Commission Washington,DC 20555 A'ITENTION: Document Control Desk SUlijECT:
Calvert Cliffs Nuclear Power Plant Units 1 & 2: Dockets 50-317 and 50-318 June 1991 Operating Data Reports Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6. Should you have any further questions regarding this matter, please contact Bruce Mrowca at (301) 260 3989, h uly ours, h
?
z RED /LBS/rcu Attachments cc:
D. A. Brune Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T.T. Martin, NRC R. I. Mclean, DNR R.Ilartfield NRC J. Wheelock,INPO J.11. Walter Resident Inspector, NRC
/ny 91071702pa 910630 7 hj' 1
ADOCK0500Q POR
/
\\\\
'U. S. Nucle:r Regulatory Comminion July 12,1991
. Page 2 of 2 bec: ). A. Tiernan/A. J. Slusark C.11. Cruse P. E. Katz R. P. lleibel T. N. Pritcheti M. J. Micrnicki W. A 'Ihornton M. 0avrilas E.1.11aucrcis R. D. Pond, Jr.
S. R. Iluxbnum. Jr.
C, C. Lawrence,111 A. R. "Ihornton.
L B. Runcil J. R. Iemons
. R. M. Douglass R. F. Ash W. R. Corcoran R. E. Denton R. C. DcYoung C. P. Johnson J. J. Connolly F. J. Munno R. E. Nagel E. K.11cwley J. E. Ringsdorf, Jr.
J.F.lehr P. O. Chabot/II. II. Mrowca P. A. File /K. J. Allor
- 1. A. Liberatorc/C. Ilchnke -
II. S. Montgomery D. Song O. L Adams A. II. Anuje G. L Detter G. J. Falibota L D. Oraber D. V. Graf L O. Wenger P. A. Pieringer J. E. Ilaum R. C. Johnson (2)
R. C. L Olsen F. Ycst Technical Librarian File
- oo*************************************************************************
UNIT 1 OPERATING DATA REPORT oco**************************************************************+es.*******
Docket No. 50-317 July 12, 1991 Prepared by Leo Shanley Telephones (301)260-6744 OP. E. RATI. N. G. ST. AT. US i
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD JUNE 1991 1
3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (HET MWe) 845
- 6. MAXIMUM DEPENDABLE-CAP'Y-(GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (HET MWe) 825
- 8. CHANGE'IN CAPACITY RATINGS none i
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASPM9 FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 4,343 141,540
-12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,903.7 99,420.5
.13.-REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE.
0.0 2,882.1 97,171.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
.16. GROSS THERMAL ENERGY GENERATED (MWH) 0-7,407,442 244,438,156
'17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 2,483,927 81,314,694
- 18. NET ELECTRICAL. ENERGY GENERATED (MWH) 0 2,379,863 77,270,040 L19. UNIT SERVICE FACTOR 0.0 66.4 68.7
- 20. UNIT AVAILABILITY FACTOR 0.0 66.4 68.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 66.4 66.2 22.-UNIT CAPACITY FACTOR (USING DER NET) 0.0 64.8 64.6
- 23. UNIT FORCED OUTAGE RATE 0.0
-12.4 9.5
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
. 2 5. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
L July 16, 1991 L
~
_..___._..2.,
3 4'
- UNIT SHUTDOWNS AND POWER REDUCI10NS DOCKETNO-
'50-317 li UNITNAME Cahert Chfk-U1 i
1~
DATE July 12.1901 m
' COMPLETED BY Im Shaniev l
'ITT FPHONE (30112NM744
- f-
. REPORT MONTH - June 1991 ME1110D OF 4:
SHUTIING IJCENSEE CAUSE & CORRECITVE l.
DURATION DOWN-EVENT SYSIEM COMPONTNT ACITON'ID (IIOURS)
REASON 2 REACIlDR3 REPORT
- CODE CODES PREVENT RECURRENCE 4
NO.
DATE
'IYPEI I
91-05 910601 S
720.0.
'B N/A N/A-Costimmed shutdown for scheduled mairstenance I
outage.
J f-i i
('
i l
l l
l
(-
1 p.
Forced 2 Reason-3 Method:
4 Exhibit G-Instructens S:
Scheduled.
A-Equipment Failure (Explaus) 1-Manual for Preparation of Data B-Maintenance orTest.
2-Manual Scram.
Entry Sheets for Ucense C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other(Explain)
E-OperatorTraining & Ucense Exar.rination F-Administrative 5 Exhibit I-Same Source G-Operational Error (Explain) j l
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 July 12, 1991 Completed by Leo Shanley Telephone: (301) 260-6744 JUNE 1991 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
~
DOCKET #50-317 CAINERT CLIFFS - UNIT 1 July 12,1991
SUMMARY
OF OPERATING EXPERIENCE June 1991
'Ihc unit began the month shutdown for a scheduled maintenance outage.
Major work performed during the month included the replacement of Salt Water Pumps, repairs to 12A Reactor Coolant Pump (RCP) and various surveillance tests.
1 Reactor Coolant System (RCS) heatup was commenced on June 30.
RCS heatup was stopped on July 1 to evaluate excess vibrations on 12A RCP.
The unit ended the month in llot Standby (Mode 3), scheduled to return to service on July 16,1991.
1 l
l l
9 July 9, 1991 REFUELING INFORMATION RE0 VEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant Unit No.1.
2.
Scheduled date for next refueling shutdown:
March 6, 1992.
3.
Scheduled date for restart following refueling:
May 17, 1992.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The anticipated changes will effect consistency between the Unit 2 Cycle 9 Tech Specs and the Tech Specs for Unit 1 Cycle 11, 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
November 8, 1991.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217.
(b) 1326.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830.
(b) 2880.
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 1992.
000*************************************************************************
i UNIT 2 OPERATING DATA REPORT Coo *************************************************************************
Docket No. 50-318 July 12, 1991 Prepared by Leo Shanley Telephones (301)260-6744 OPERATING STA.TUS
- 1. UNIT NAME Calvert Cliffs Unit 2-
- 2. REPORTING PERIOD JUNE 1931 3.-LICENSPD THERMAL POWER (MWT) 2700
- 4. NAMEPLA' E RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWo) 860
-7.
MAXIMUM DEPENDABLE CAP'Y ' NET MWe) 825 i
8.' CHANGE.'N CAPACITY RATINGS none
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month -Year-to-Date to Date
' 11. HOURS IN REPORTING PERIOD 720 4,343 124,895
- 12. NUMBER OF-HOURS REACTOR WAS CRITICAL 432.3 1,090.5-88,527.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 424.1 965.9 87,194.8
- 15. ! UNIT RESERVE-SHUTDOWN HOURS 0.0 0.0 0.0 16 GROSS THERMAL ENERGY GENERATED (MWH) 1,086,230 2,226,232 220,615,650
'17. GROSS? ELECTRICAL ENERGY GEN'TED(MWH) 347,409 713,686 72,998,318 18.. NET' ELECTRICAL ENERGY GENERATED (MWH) 332,015 676,557 69,719,128 119. UNIT SERVICE FACTOR 58.9 22.2 69.8
'20. UNIT AVAILABILITY FACTOR 58.9
-22.2 69.8
- 21. UNIT CAPACITY FACTOR (US4..J'MDC NET) 55.9 18.9
'67.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 54.6 18.4 66.1
' 23. UNIT FORCED OUTAGE RATE 41.1 32.9 5.8
~24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
-Maintenance / Test, October 4, 1991 for 50 days
~
. 25. IF UNIT IS SHUTDOWN AT.END 0F REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A-t l'
l
.i
l UNIT SIItTFDOWNS AND POWER REDUCTIONS DOCKETNO.50-31R UNITNAME Calvert Clifb-U2 DATE Jufv12.1991 COMPLETED BY I co Sha*v TF1 FPHONE 00f1244711 REPORTMONTH June 1991 METIIOD OF I
SIIIJTIING LICENSEE CAUSE & CORRECITVE DURATION DOWN EVENT SYSIBf COMPONENT ACIldN TO I
(liOURS)
REASONI REACTUR3 REPORT #
CODED CODES PREVENT RECURRE? ICE NO.
DATE TYPEI 91-12 910615 F
295.9 A
1 91-006 AA H'EXCH
- 1) Unit shutdown was required ty Technical Specifications when both Control Room HVAC l
units were determined to be inoperable-l
- 2) 11 CR HVAC was dow.n for repairs and 12 CR HVAC became overloadcx1 due to the heavy load and presence of non-condensable gases in the system.
i
- 3) Proceduresare being changed and a l
Reliability Task Force has been formed to j
address the HVAC system reliability.
l 4
1 i
i 1 F:
Forced 2 Reasore 3 Method:
4 Exhibit G-Instructions i
S:
Scheduled A-Equipment Failure (Explain) 1-\\tanual for Preparation of Data B-Maintenance or Test 2-Ma:tual Scram.
EntrySheets for Ucense C-Refueling 3-Autematie Scram.
Ewnt Report (LER) File D-Regulatory Restriction 4-Othen (Explain)
E-Operator Training & License Examinata F-Administrative 5 Exhibit I-Same Source G-Operational Error (Explain)
i AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffo Unit No. 2 JULY 12, 1991 Completed by Leo Shanley Telephone (301) 260-6744 JUNE 1991 Average Daily Power Level Average Daily Power Level Day (MWo-Not)
Day (MWo-Not) 1 835 17 0
2 833 18 0
3 832 19 0
4 831 20 0
5 836 21 0
6 838 22 0
7 841 23 0
8 844 24 0
9 844 25 0
10 844 26 0
11 843 27 0
12 840 28 189 13 838 29 641 14 837 30 745 15 524 16 0
DOCKET #$0-318 CALVERT Cl.IITL UNIT 2 July 12, IWI
SUMMARY
OF OPERATING EXPERIENCE June 1991 The unit began the month at 100% (840 MWe).
A shutdown was commenced at 1400 on June 15 due to a loss of Control Room Air Conditioning (CR llVAC) operability,12 CR IIVAC became overloaded while 11 CR llVAC was being prepared for post maintenance testing. The shutdown was required by Technical Specihcations.
The generator was taken offline at 1632 and the reactor was shutdown at 1750. Cold Shutdown was reached at 1130 on June 16.
Repairs were made to the llVAC units and RCS heatup was commenced on June 25. The reactor was taken critical at 1735 on June 27 and the generator was paralleled to the grid at 0026 on June 28.
Power ascension was delayed to repair a Steam Generator steam now transmitter and 21 IIcatcr Drain Tank liigh Lcvel Dump. The unit reached 96% (740 MWe) at 1810 on June 29.
The unit ended the month at %% (740 MWe) with repairs being made to #21 Ileater Drain Tank liigh level Dump.
t
July 9, 1991 BELUIUNG INf0RMATlfft_REDUE11 1.
Name of facility: Calvert Cliffs Nucicar Power Plant Unit No. 2.
2.
Scheduled date for next refueling shutdown:
March 5, 1993.
3.
Scheduled date for restart following refueling:
May 17, 1993.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not identified at this time.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
November 17, 1992.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, (a) 217.
(b) 1326.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage caaacity, and (b) the site of any increase in licensed storage capacity t1at has been requested or is planned, in number of fuel assemblies.
(a) 1830.
(b) 2880.
9.
The projected date of the last refueling that can be discharged to the Spent fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 1992.
l L
.