Proposed Tech Spec 6.0 Re Administrative Controls
ML20082B678
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/08/1991
From:
GEORGIA POWER CO.
To:
Shared Package
ML20082B673 List:
References
NUDOCS 9107160283
Download: ML20082B678 (4)


Text

_

6.0 ADMINISTRATIVECONTRQLS 6.1 RESPONSIBillTY 6.1.0 The General Manager-Nuclear Plant shall provide direct executive oversight over all aspects of Plant Hatch.

l 6.1.)

The Assistant General Manager-Plant Operations (AGM-PO) shall be responsible for overall unit operation, except for the RadiologirM Environmental Monitoring Program as described below and for dehgation in writing of the succession of this responsibility during his tbsence. Certain plant support functions shall be the responsibility of the Assistant General Manager-Plant Support (AGM-PS).

6.1.2 The General Manager-Nuclear Plant or his designee shall be responsible l

for the Radiological Environmental Monitoring Proc, ram as described in the Specification 3/4.16 of Unit.I and.for the writing of the Annual Radiological Environmental Surveillance Report.

6.1.3 Each of the above-mentior.ed indivicuals is responsible for the accuracy of the procedures needed to implement his responsibilities.

6.2 ORGANIZAT104 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS Onsits and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant, a.

Lines of authority, responsibility, and communication shall be established and defined for the highest management levels through intermediate levels to and including all operating organization positions. These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Plant Hatch Unit 2 updated FSAR, b.

The AGM-PO shall be responsible for overall unit safe opm ethn and l

shall have Control over those onsite activities necessary for iafe operation and maintenance of the plant, c,

The Vice President-Nuclear shall have corporate responsibility he overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining and providing technical support to the plant to ensure nuclear I

l safety.

l l

l i

l HATCH - UNIT 1 6-1 K:\\wp\\techsp\\h\\6-0Vil55. pro \\l38-155 9107160283 910708 PDR ADOCK 05000321 PDR p

i

=

I l

l 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.0 The General Manager-Nuclear Plant shall provide direct executive oversight over all aspects of Plant Hatch.

6.1.1 The Assistant. General Manager-Plant Operations (AGM-PO) shall be l

responsible for overall unit operation, except for the Radiological Environmental Monitoring Program as described bels and for delegation in writing of the succession of this responsibility during his absence.

Certain plant support functions shall be the responsibility of the Assistant General Manager-Plant Support (AGM-PS).

6.1.2 The General Manager-Nuclear Plant or his designee shall be responsible l

for the Radiological Environmental Monitoring Pru eam as described in the Specification 3/4.16 of Unit I and for the writing of the Annual Radiological Environmental Surveillance Report.

6.1.3 Each of the above-mentioned individuals is re+:nsible for the accuracy of the procedures needed to implement his respons.ib))ities.

6,2 ORGANIZATION 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant, a.

Lines of authority, responsibility, and communication shall be established and defined for the highest management levels -through intermediate levels to and including all operating organization positions. These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation.

These requirements shall be documented in the Plant Hatch Unit 2 updated FSAR.

b.

The AGM-P0 shall be responsible for overall unit safe operation and l

shall have control over those onsite activities necessary for safe operation and maintenance of the plant, The Vice President-Nuclear shall have corporate responsibility c.

--for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining and providing technical support to the plant to ensure nuclear safety.

HATCH - UNIT 2 6-1 K:\\wp\\techsp\\h\\6-0U2138. pro \\l38-94

6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.0 The General Manager-Nuclear Plant shall provide direct executive over. sight over all aspects of Plant Hatch.

6.1.1 The Assistant General Manager-Plant Operations (AGM-PO) shall be l

responsible for overall unit operation, except for the Radiological Environmental Monitoring Program as described below and for delegation in writing of the succession of this responsibility during his absence.

Certain plant support functions shall be the responsibility of the Assistant General Manager-Plant Support (AGM-PS).

6.1.2 The General Manager-Nuclear Plant or his designee shall be resocasible l

for the Radiological Environmental Monitoring Program as described in the Specification 3/4.16 of Unit I and for the writing of the Annual Radiological Environmental Surveillance Report. -Tht-Genera & Manager = W:!cu-944R or M L des 4 nee shall review-the-proposeddhanges to plant-systems or equipment, 9

Wee 64 hat-wch-changes-aft-4 den t+f4td-by-t he -Ne t-Re v i Beard ' PRS 1 n hW"g a pot +nt444-+adkkgkal erwi ronmental-4epatt, 6.1.3 Each of the above-mentioned individuals is responsible for the accuracy of the procedures needed to implement his responsibilities.

6.2 ORGANIZATION 6.2.1 OFFSITE AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nucicar power plant.

Lines of authority, responsibility, and communication shall be a.

established and defined for the highest management levels through intermediate levels to and including all operating organization positions.

These relationships shall bc documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation.

These requirements shall be documented in the Plant Hatch Unit 2 updated FSAR.

b.

The AGM-P0 shall be responsible for overall unit safe operation and l

shall have control over those onsite activities necessary for safe operation and maintenance of the plant.

The Vice President-Nuclear shall have corporate r4sponsibility c.

for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operatir,g, maintaining and providing technical support to the plant to ensure nuclear safety.

HATCH - UNIT 2 6-1 Proposed TS/0356q/138-94

l o

6,0 ADMINISTRATIVE CONTROL 5 6.1

  1. tSPON51BillTY 6.1.0 The General Manager-Nuclear Plant shall provide direct executive oversight over all aspects of Plant Hatch.

6.1.1 The Assistant General Manager-Plant Operations (AGM-PO) shall be l

responsible for overall unit operation, er. cept for the Radiological Environmental Monitoring Program as described beloi and for delegation in writing of the succession of this responsibility during his absence. Certain plant support functiot.5 shall be the responsibility of the Assistant General Mar.ager-Plant Support (AGM-PS).

6.1.2 The General Manager-Nuclear Plant or his designee shall be responsible f or the Radiological Environmental Monitoring Program as described in the Specification 3/4.16 of Unit I and for the writing of the Annual Radiological Environmental Surveillance Report, he 50 :r:1 ".:t g:- L;: lear Pl:t; Or * 't de44 r.se the!' revJee tSe pr4 pated-changet t: p!:nt ej:te : Or :W :nt, 9

.provided-that s uc h theng:6-4ra ih m d b; t'

  • !:st 3:& S::rd (PP.S) :s-e hJr.g.-4-pote444! red!0!: glee! enr i :rr::t:1 ' ;;;t.

r 6.1.3 tech of the above-mentioned indivicuals is responsible for the ac' curacy of the procedures needed to implement his responsibilities.

6,P ORGAN 17ATION 6.2.1 QFFSITF AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and of fsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.

Lines of authority, restsnsibility, and connunication shall be c.

established and defined for the highest management levels through intermediate levels to and including all operating organ tation positions.

These relttionships shall be documented.cio updated, as appropriate, in the f arm of organi:ation charts, functional descriptions of depa tmental responsibilities and relationships, and job descriptions fo' key personnel positions, or in equivalent forms of documentation.

These requirements shall be documented in the Plant Hatch Unit 2 updated FSAR.

b.

The AGM-PO shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant, The Vice President-Nuclear shW have corporate responsibility f or c.

overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining and providing technical support to the plant to ensure nuclear safety.

\\

HATCH - UNIT 1 6-1 Proposed TS/0353a/138-155 i