ML20082B315
| ML20082B315 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/10/1983 |
| From: | Dietz C CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| BSEP-83-3677, IEB-83-02, IEB-83-2, RO-2-83-97, NUDOCS 8311210127 | |
| Download: ML20082B315 (1) | |
Text
!
Do
@;Tplecopied 11-10-83 v"p,,
^',7.,
Carolina Power & Light Company
'/f
- >Y ',
~
4g, Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 November 10, 1983 FILE: B09-13510C SERIAL:
BSEP/83-3677 Mr. James P. O'Reilly, Administrator U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.
Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324 LICENSE NO. Di'R-62 CONFIRMATION FACSIMILE OF AN IMMEDIATELY REPORTABLE EVENT (2-83-97)
Dear Mr. O'Reilly:
This confirms the telephone conversation at 1470 on November 10, 1983, between Mr. R. M. Poulk, Jr., Carolina Power & Light, and Mr. A. K. Hardin of your office, concerning an immediately reportable event por Technical Specification 6.9.1.Sc.
While performing inspections on the Unit No. 2 recirc piping required by IE Bulletin 83-02 and the NRC order to Carolina Power & Light Company dated August 26, 1983, it was determined that three welds had indications of IGSCC.
l The location and size of these indications are as follows:
Weld Length Depth System 2B32-22"-BM-1 1.2" 7%
Recirculation 2E11-20"-A2 0.95" 19%
RWCU Evaluation or corrective action for these three indications is still in progress and will be addressed in the 14-day report.
Very truly yours, c_9'g C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/pms/LETPS1 8311210127 831114 Enclosure PDR ADOCK 05000324 S
PDR CO Tp/".'CLE cc:
Mr. R. C. DeYoung gp-NRC Document Control Desk ll0
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.