ML20081L303
| ML20081L303 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/10/1983 |
| From: | Curtis C, Nix H GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| GM-83-1089, NUDOCS 8311160077 | |
| Download: ML20081L303 (13) | |
Text
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
o OPERATING OATA HEPORT DOCKET NO.
50-321 DATE 11-10-83 COMPLETED BY: C. M. Curtis TELEPHONE (912) 367-7851 OPERATING STATUS Notes 1.
thit Name: E. I. Hatch Nclear Plant thit 1 Hours reactor was critical exceeds 2.
Reporting Period: 10-83 hours in reporting period due to the 3.
Licensed Thermal Power (MWt): 2436 change from Daylight Savings Time.
4.
Nameplate Rating (Gross MWe): 809.3 5.
Design Electrical Rating (Net MWe): 777.3 6.
Maximum Dependable Capacity (Gross MWe): 801.2 7.
Maximum Dependable Capacity (Net MWe): 764.7 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9.
Power Level to hhich Restricted, If Any (Net MWe)
- 10. Reasons for Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 7295 68663
- 12. mmber of Hours Reactor was Critical 745.0 5954.5 48907.0
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 74).0 5701.0 45852.0
- 15. Lhit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1258896 11977445 96225808
- 17. Gross Electrical Energy Generated (MWH) 400560 3871520 31141010
- 18. Net Electrical Energy Generated (MWH) 378449 3678454 29564669
- 19. thit Service Factor 100.1 78.2 66.8
- 20. thit Availability Factor 100.1 78.2 66.8
- 21. thit Capacity Factor (using MDC Net) 66.5 65.9 56.3
- 22. thit Capacity Factor (using DER Net) 65.4 64.9 55.4
- 23. thit Forced Outage Rate 0.0 5.4 18.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
b 26. thits in Test Status (Prior to Commercial Operation):
Forecast Achieved N
$A INITIAL _ CRITICALITY 8311160077 831110 INITIAL ELECTRICITY PDR ADOCK 05000321 CDMMERCIAL OPERATION R
AVERAE DAILY UNIT POWER LEVEL DOCKET NO.
50-321 DATE:
11-10-83 COMPLETED BY: C. M. Curtis TELEPHONE (912) 367-7851 NONTH 10-83 DAY AVERAE DAILY POWER LEVEL DAY AVERAE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 500 17 507 2
507 18 510 3
460 19 511 4
505 20 511 5
501 21 514 6
506 22 506 7
506 23 510 8
511 24 515 9
496 25 515 10 509 26 514 11 511 27 516 s 12 506 28 518 506 29 514 l
13
.^
14 311
}D 536 31 513 1
15
- v $12 16 511' 7
3 (9/77) 1
h.
50-321 D
UNIT SHUTDOWNS AND FOWER P. EDUCTIONS U1 NA.f Hatch 1 11-10-83 DATE October COMPLETED BY C.M. Curt-ici _
REFORT MONTri TELEPilONE 912-367-785I i
O E
E m
'Cause & Corrective
' ~,p^$g 3
$Y3 Licensee E-e, g
ig s
jg5 Event U
E-3 Action to No.
Date -
Prevent Recurrence yu 35 5
j #3 g Repori #
mO F
4 6
83-75
'831001 F
745 F
5 NA IC FUELXX Inad reduction due to leaking fuel problems.
"83-76 831001 S
4.2 ?
B 5
NA HA
'IURBIN Inad reduction due to weekly turbine tent.
9 83-77 831001-'
S 4.3 11 5
la FD OrxmOD Ioad reduction due to control rod exer-cise.
83-78 831003 F
17.2 B
5 NA CB PUMPXX Ioad reduction to work on IFPT & "B" circ H O punp.
2 83-79 831009-S 3.3 B
5 NA HA
'IURBIN Ioad reduction due to weekly turbine test Hk~ '
TURBIN Load reduction due to: Weekly turbine tef t.
83-80 831014
.S-4.5 B
5 NA 83-81 831022
.S 7.0 H
5 NA RB CONRCD Ioad reduction due ?4 control rod exer-cise.-
t i
2 3
4 Method:
Exhibit G Instructions F: Forced Reason:
S: Sch:duled Aciuipment'Failur:(Expkin) 1 M.inu:1
. fur Preraration of Data E..hinte.mance ci Test 2 Lacal S:t:m.
Entry Sh:ets for Licensee c.' Refueling 3 Auturnsti: Scram.
Esent Report (LER) File (NUREG-D P.egulatory Restriction 4 -Continuations 0161)
E Operator Training & Ucense Examination 5-Ioad Reduction I
F-AdministtatIve 9-Othcr (Explain)
Exhibit I Same Source G Operational Error (Explain)
(9/77)-
li Other (Explai:.)
^
50-321 DOCKET NO.
UNIT SliUTDOWNS AND F0WER REDUCTIONS UNIT NAME DATE 11-10-83 October COMPLETED BY C.M. Curtis
- REPORT MONTri TELEPlf0NE 912-367-7851 '
l I
w.
l E
E m
.53 i
$E5 Licensec E~r, y, -
'C:.use & Currective u
s.3 Action to No.
Date -
g 3g g
jg5 Event t#v?
ju Prevent Recurrence
$5 5
jdg Report #
6 831022 S
4.5 B
5 NA IIA
'IURBIN Inad reduction due'to weekly turbine 83-82 l:
test.
83-83 831029 S
2.0 B
5 NA liA
'IURBIN Ioad reduction due to weekly turbine test.
8 4
l 1-I 2
3 4
F: Farced Reason:
Plethod:
Exhibit G. Instructions j
S: S:heduled
.. E:;uip.m.:nt Teitur:(Exp!:in) 14hnu1
. for Preparation of Data B.I.bintenan:e cf Test 24.'ancal S:t:m.
Entry Sh:ets for Licensee
- c. Refueling 3.Auturnatic Scram.
Esent Report (LER) File (NUREG-D Regulatory Restriction 4 -Continuations 0161)
E-Operator Training & Ucense Examination 5-Ioad Pcduction S
F. Administrative 9-Other (Explain)
G Operational Error (Explain)
Ex!tibit I.Same Source (9/77) 11 O:her(Explain)
~
- - _ - _ - _ - - - - _ _ _ _ _ - _. -. ~ _ _ _ _ _ _ -. _ - - _ - - - _. _
NARRATIVE REPORT UNIT 1 October 1st 0000 Load held to 65% due to leaking fuel problems.
October 1st 0029 Load reduction for weekly turbine testing.
Oc tober 1st 0233 Control rod exercise performed.
October 1st 0442 Increasing power weekly turbine testing complete.
October 3rd 0850 Load reduction to work on RFPT &
"6" circ H2O pump.
October 3rd 0950 Increasing reactor power.
October 9th 0025 Load reduction for weekly turbine testing.
October 9th 0200 Increasing power weekly turbine testing complete.
October 14th 2118 Load reduction for weekly turbine testing.
October 15th 0150 Increasing power weekly turbine testing complete.
October 22nd 1851 Control rod exercise performed.
October 22nd 2120 Weekly turbine testing in progress.
October 23rd 0145 Increasing power weekly turbine testing complete.
October 29th 0030 Load reduction for weekly turbine testing.
October 29th 0230 Increasing power weekly turbine testing complete.
HATCH 1 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1983 NUMBER DATE COMPLETED DESCRIPTION j
83-5764 10-1U-83 RHR sample line valves indication lights; roll wiring between terminal boards YY and T87 & ZZ & T88 (all in lH11-P601) per DCR 83-75. Redline wiring to verify wiring is correct per DCR 83-75 & H-17819.
82-7512 09-29-83 Unit 1 turbine lube oil cond. fire protection system.; perform functional test as follows:
functional test shall consist of performing section(s) H of procedure HNP-1-3357E &
filling in the required data on the attached sheets. Ref:
82-5922 10-17-83 Technical Support Center; calibrate instruments on the filter (X75-0001) train assembly.
X75-dPI-R001,
-R002, -R003A,
-B,
-R004 &
dPIS-R005.
83-6659 10-06-83 Backwash valve discharge pipe; the discharge pipe for P41 F313A&B has holes in it.
Please enclose & pump with sealant until permanent repairs can be made. (Ref:
DCR a3-185)
I OPERATING DATA REPORT DOCKET Nu.
50-366 DATE 11-10-83 COMPLETED BY: C. M. Curtis TELEPHONE (912) 367-7851 OPERATING STATUS Notes 1.
Unit Name: E. I. Hatch mclear Plant thit 2 2.
Reporting Period: 10-83 3.
Licensed Thermal Power (MWt): 2436 4.
Nameplate Rating (Gross MWe): 8.17.0 5.
Design Electrical Rating (Net HWe): 784.0 6.
Maximum Dependable Capacity (Gross MWe): 803.9 7.
Maximum Dependable Capacity (Net MWe): 774.5 8.
If manges Occur in Capacity Ratings (Items W mber 3 through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons for Restrictions, If Any:
This Month Yr-to-Oate Cumulative
- 11. Hours In Reporting Period 744 7296 36433 12.. Wmberlof Hours Reactor was Critical 692.0 4600.2 25751.3
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 679.2 4312.9 24468.0
- 15. Unit Reserve Shutdown Hours 0
0 C
- 16. Gross Thermal Energy Generated (MWH) 1515696 8509916 52115599
- 17. Gross Electrical Energy Generated (MWH) 517610 2852790 17129260
- 18. Net Electrical Energy Generated (MWH) 495376 2700507 16288833
- 19. Unit Service Factor 91.3 59.1 67.2
- 20. thit Availability Factor 91.3 59.1 67.2
- 21. thit Capacity Factor (Using MDC Net) 86.0 47.8 57.7
- 22. thit Capacity Factor (using DER Net) 84.9 47.2 57.0
- 23. Unit Forced Outage Rate 8.8 19.8 13.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown at End of Report Period, ' Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-366 DATE:
11-10-83
~
COMPLETED BY: C. M. Curtis TELEPHONE (912) 367-7851 MONTH 10-83 DAY.
~ AVERAGE DAILY POWER LEVC.L DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 539 17 774 2
683 18 776 13 769 19 777 4
782 20 775
'. 5 '
779 21 744 6
785 22 722
- 7-773 23 775 8
564 24 786 9.
683
-25 786 10 758 26 420 11 784 27
-14 12 781 28
-12 13~
778 29 155 14 788 30 625 15' 782 31 752 16 771-(9/77)
50-366 DOCKET NO.
Hatch 2 UNIT SEUTDO'.'.'NS AND FOWE?. REDUCTIONS UNIT NAh!E DATE 11-10-83 COMPLETED BY C' M- ('nr*
October REPORT MONTil TELEPHONE 912 m7-7ac;1
'Cause & Corrective
.! ?
3
.E Licensee E3, N. >.
Date -
g; g
g
_g g 5 Event n2 E-3 Action to
--o Prevent Recurrence div yU
$5 5
jdig Report #
6 I
83-34 831001 S
18.0 H
5 NA CB PLNPXX Ibwer ascension from scram due to trips on both reactor recire ptzrps.
83-35 831002 S
1.4 B
5 NA HA
'IURBIN Ioad reduction due to weekly turbine test.
83-36 831002 S
lO.7 H
5 la RB OON10D Ioad reduction due to rod pattern ad-justment.
83-37 831007 S
3.5 B
5 NA Im
'IURBIN Ioad reduction due to weekly turbine test.
I 83-38 831007 S
46.8 H
'S NA RB COGOD Ioad reduction due to rod pattern ad-
{
i justment.
i~
83-39 831016 S
-1.8 B
5 NA HA
'IURBIN Ioad reduction due to weekly turbine test.
83-40, 831021-S 3.8 B
5 NA HA TUFBIN Ioad reduction due to weekly turbine test.
l i 83-41 831022 S
8.0 H
5 la RB C0tm0D Ioad reduction due to control rod exercise.
I i
3 4
I 2
P!:: hod:
Exhibit G - Instructions F: Farced R nson:
lenu 1
. fur Prep ration of Data 5: S:heduled A E:;uip.m:nt'Failur:(Explain)
E.'.!:inte.sance ciTest M.!a.1eal S:t:m.
Entry Sh:ets for t.ieensee 3-A.pernatic S: ram.
Event Report (LER) File (NUREG-I C Refueling 4 -Con'cinuations 0161)
D Regulatory Restriciion E-Operator Training & License Examination 5-Ioad Pcduction 5
F-Administrative 9-Other (Explain)
Exhibit I-Same Source G-Opera'ional Error (Explain)
~
(9/77) 11 O:her(Exp!ain) s
i i
i I
i DOCKET NO.
50 466 UNIT SliUTDOWNS AND FOWER REDUCTIONS UNIT N A.'.!E
' h '-h DATE 11-10-83 October COMPLETED BY E M-NO REFORT MONTil TELEPl!ONE 417-C - W 1 w.
.39
"[
.E4 Licensec Eg vl -
'Cause & Corrective h,
Action to N< e.
Date.
g 3g n
jg 5 5 Event u -'2 Prevent Recurrence g3 E 5
j$g Report #
$0 yU Q
l 3.6 H,
5 NA m
PLNPXX Ioad reduction due'to preparation for 83-42 831026 S
drywell equi znent drain simp ptmp l
outage.
83-43 831026 F
65.8 H
2 NA MA PUMPXX Manual scram for above outage.
83-44 8310 29 S.
35.5 11 5
NA-MA PLNPXX Power ascension from above outage.
t I
i 3
4 I
2 Plethod:
Exhibit G - Instructions F: Forced Reason:
1 Manual
. for Preparation of Data S: S:h:duled A Equip.wnt'Failur:(Explain)
EJ.!:intenance ci Test 2-Manual S:t:m.
Entry Sh:ets for Licensee 3 Auturnstic Scram.
Event Report (LER) File (NUREG-
- c. Refueling D Regulatory Restriction 4 -Continuations -
0161)
E-Operator Training & Ucense Examination 5-Ioad Peduction 5
F Administrative 9-Other (Explain)
Exhibit I.Same Source G Operational Error (Explain)
(9/77) li Other(Explain)
i NARRATIVE REPORT UNIT 2 Octcber 2nd 0320 Load reduction for weekly turbine testing & rod pattern adjustment.
October 2nd 0445 Weekly turbine testing complete.
October 7th 2045 Load reduction for weekly turbine testing.
October 7th 2110 Rod pattern adjustment load reduced.
October 8th 0012 Weekly turbine testing complete.
October 16th 0230 Load reduction for weekly turbine testing.
October 16th 0420 Weekly turbine testing complete increasing load.
October 21st 2030 Load reduction for weekly turbine testing.
October 22nd 0005 Control rod exercise in progress.
October 22nd 0018 Weekly turbine testing complete.
October 26th 1106 Decreasing load to prepare for drywell equipment drain sump pump outage.
October 26th 1439 Reactor manually scrammed for above outage.
October 28th 1939 Reactor critical.
October 29th 0830
. Unit tied to system grid.
~
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1983 NUMBER DATE COMPLETE DESCRIPTION 83-4266 09-12-83 Post Accioent Sampling Detector LN2 Fill Line; eliminate tubing run outside PASS room to locate LN2 cylinder at penetration to PASS room. Ref: FOR 79-476-99 & DCR 79-476.
82-2575 10-17-83 Orywell Pneumatic System Supply Line High Pressure Switch; terminate cable PMA90Z11 & engrave & install annunciator window Z17/Z27 "DW Pneu. System Supply Line Hi Pressure" at P 1 2H11-P700. Verify logic module is installed in cab.
2H21-P237. This is partial design package. Ref:
OCR 81-112 & Bechtel sketches 8-E-81-112-8, 9,
10, 11 all Rev. A&
8-E-81-112-5, Rev. A.
83-3329 09-01-83 Reactor Pressure Vessel; perform-GE procedure RPV l
1.2.6 for internal vessel inspection of cladding.
83-3318 09-27-83 Feed Water Sparger, Vessel Internals; remove & replace the damaged sparger &
bracket & vessel support bracket, grind & flap as required. Also perform'FT on both brackets. Work to be accomplished in accordance with general electric repair procedure. Ref: OCR 83-98.
83-2865 07-12-83 States Block T.B.-AA; states block seems to be broken.
Links will not open nor close. Please replace states blocks. Ref: OCR 81-139.
/
Georgia Power Company Post Office Box 439 Daxley, Georgia 3t513 Telephone 912 367 7781 912 537-9444 m
Georgia Power Edwin 1. Hatch Nuclear Plant November 10, 1983 GM-83-1089 PLANT E.
I. HATCH NHC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321, and for Hatch Unit 2, Docket #50-366.
/
A C
H.
C.
Nix General Manager HLS/hh h
??4(