Proposed TS Surveillance Requirement 4.6.2.1.d, Containment Spray Sys
ML20081J476
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/21/1995
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20081J467 List:
References
NUDOCS 9503270304
Download: ML20081J476 (2)


Text

.

I J

Attcchment IV to CO 95-0003 Page 1 of 2 l

l I

t ATTACHMENT IV PROPOSED TECHNICAL SPECIFICATION CHANGES P

t

)

9503270304 950321 PDR ADOCK 05000482 p

PDR

.. ~ -

f Attachment IV to CO 95-0003 Page 2,cf 2 t

(

i i,

CONIAINMENT SYSTEMS i

I 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS I

CONTAINMENT SPRAY SYSTE,M i

LIMITING CONDITION FOR OPERATION t

i 3.6.2.1 Two independent Containment Spray Systems shall be OPERABLE with each Containment Spray System capable of taking suction from the RWST and transfer-ring suction to the containment sump.

l APPLICABILITY: MODES 1,2,3, and 4.

t ACIl0N:

t With one Containment Spray System inoperable, restore the inoperable Contain-ment Spray System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT

[

STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable Containment Spray Sys-

~

tem to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within I

the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

(

I SURVEILLANCE tlEQUIREMENTS

[

4 6.2.1 Each Containment Spray System shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying that each valve (manual,

[

power-operated, or automatic) in the flow path that is not locked, y

sealed, or otherwise secured in position, is in its correct position;

b. By verifying, that on recirculation flow, each pump develops a discharge pressure of greater than or equal to 250 psig when j

tested pursuant to Specification 4.0.5;

c. At least once per 18 months during shutdown, by:
1) Verifying that each automatic valve in the flow path actuates to its correct position on a Containment Pressure-High-3 (CSAS) test signal, and
2) Verifying that each spray pump starts automatically on a Containment Pre ure-High-3 (CSAS) test signal.

l i

d. At least once per.E^ years by performing an air or smoke flow test l

through each spray header and venfying each spray nozzle is unobstructed.

i L

WOLF CREEK - UNIT 1 3/4 6-13 L