First Interim Deficiency Rept Re Front Covers Separated from Bailey Meter Modules.Initially Reported on 831004.Modules Will Be Returned to Bailey for Rework.Next Rept Will Be Submitted by 840206.Also Reported Per Part 21
ML20081H030
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 11/01/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8311070282
Download: ML20081H030 (2)


Text

u

?*

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol 400 Chestnut Street Towg 4g,.E November 1,1983 S

BLRD-50-438/83-52 BLRD-50-439/83-45 U.S. Nuclear Regulatory Comission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLSFONTE NUCLEAR PLANT UNITS 1 AND 2 - FRONT COVERS SEPARATED FROM BAILEY METER MODULES - BLRD-50-438/83-52, BLRD-50-439/83 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector Linda Watson on October 4,1983 in accordance with 10 CFR 50.55(e) as NCR BLN 2454. Enclosed is our first interim report. We expect to submit our next report by February 6,1984. We consider 10 CFR Part 21 applicable to this deficiency.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing Enclosure oc (Enclosure):

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 gpGi Babcock & Wilcox Co.

P.O. Box 1260 0"' D CI M Lynchburg, VA 24505 Attention:

Mr. H. B. Barkley p cl

  1. ff W 2?8!S"J 8aa as 1983-TVA 50 AN NIVERS ARY S

PDR An Equal Opportunity Employer

ENCLOSURE s

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FRONT COVERS SEPARATED FROM BAILEY METER MODULES BLRD-50-438/83-52, BLRD-50 !!39/83-45 NCR 2454 10 CFR 50.55(e)

FIRST INTERIM REPORT Description of Deficiency While inspecting Bailey Meter Company (Wickliffe, Ohio) modules at BLN, TVA's Division of Construction (CONST) personnel discovered that front cover plates for several class 1E modules in control cabinets for the Non-nuclear Instrumentation (NNI) and Essential Controls Instrumentation (ECI) system had become separated from the frame body of the module. The front cover plate i's attached to the frame body by means of two spot welds at the top and bottom of the front cover plate. These spot welds had been broken and had caused the front plate cover to separate from the module. The cause of the failure -is' not known'at this time.

Interim Progress TVA's recommended corrective action is to return the modules to Bailey Meter Company (subvendor) for rework. Babcock and Wilcox (Lynchburg, Virginia), who is the vendor for this equipment, has been' requested, via TVA letter K-7973 to review the subject NCR and respond to TVA with a root cause, corrective action and action to prevent recurrence. We expect to provide ~the NRC with more information in our next report, b