ML20081F102

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Pages Re Traversing in-core Probe Sys
ML20081F102
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/14/1995
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20081F101 List:
References
NUDOCS 9503210529
Download: ML20081F102 (3)


Text

-

)

1

)

U l

ATTACHMENT 1 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 Docket Nos. 50-277 50-278 Ucense Nos. DPR-44 DPR-56 Facility Operating License Change Request 94M, Supplement 1

" Traversing in-core Probe System Upgrade' Ust of Revised Pages Unit 3 181 186 i

l l

i 9503210529 950314 PDR ADOCK 05000277 P

PDR i

~'

~..

Unit 3L TABLE 3.7.1 (Cont'd.)

i PRIMARY CONTAINMENT ISOLATION VALVES A

i Number of Power j

Operated Valves Maximum-Action on-Operating.

Normal Initiating Group Valve Identification Inboard Outboard Time ~(sec.)

Position Signal

~

2D Drywell equipment drain dis-2 5

O GC'-

charge isolation valves 2D Drywell floor drain discharge 2

5-O GC i

isolation valves 2D Traveling in-core probe 3

NA C

.SC:

4A HPCI steam line drains 2

NA O

GC SA RCIC steam line drains 2

NA O

GC:

4 SA RCIC condensate pump drain ~

2 NA O

GC 4A HPCI condensate pump drain 2

NA C

SC ':

2D Torus water l filter pumps 2

NA O

GC.

suction isolation valves i

l 4B HPCI Turbine Exhaust' Vacuum' 1

15 O

GC-Breaker Isolation Valve-i l

SB RCIC Turbine Exhaust Vacuum 1

15-O.

GC' Breaker Isolation. Valve 4

HPCI steam line exhaust-drain 2

NA O

GC' 4

HPCI steam line warm-up*'

2 NA C

SC-e Effective upon completion of installation, approved by Amendment No.- -

-181-2.

c.

. 2-

.s..=..

W

+

'PBAPS Unit 3

^

TABLE 3.7.4 i

-C PRIMARY CONTAINMENT TESTABLE ISOLATION VALVES 6

Pen No.

Notes t

22 A0-2969A (Unit #2); A0-3969A (Unit #3) 1,2,4,5 Check Valve 1,2,4,5 23 MO-2373 (Unit #2); MO-3373 (Unit #3) 1,2,4,5 24 MO-2374 (Unit #2); MO-3374 (Unit #3) 1,2,4,5 "i

25, 205B A0-2502A (Unit #2); A0-3502A (Unit #3) 1,2,4,5,9,12L A0-2505'(Unit #2); A0-3505 (Unit #3) 1,2,4,5 A0-2519 (Unit #2);'AO-3519 (Unit #3) 1,2,4,5 A0-2520 (Unit #2); A0-3520 (Unit #3) 1,2,4,5,9,12 A0-2521A-(Unit #2); A0-3521A (Unit-#3) 1,2,4,5 A0-2521B (Unit #2); A0-3521B (Unit #3) 1,2,4,5,9,12 A0-2523 (Unit #2); A0-3523 (Unit #3) 1,2,4,5 i

Check Valve 9-26A; Two Check Valves 1,2,4,5 l

I 26 A0-2506 (Unit #2); A0-3506 (Unit #3) 1,2,4,5,9,12 A0-2507 (Unit #2); A0-3507 (Unit #3) 1,2,4,5 A0-2509 (Unit #2); A0-3509-(Unit #3) 1,2,4,5,9,11 l

A0-2509 (Unit #2); A0-3509 (Unit #3) 1,2,4,5 A0-2510 (Unit #2); A0-3510 (Unit #3) 1,2,4,5 A0-4235 (Unit #2); A0-5235 (Unit #3) 1,2,4,5 SV-2671G (Unit #2); SV-3671G (Unit #3) 1,2,4,5 SV-2978G (Unit #2); SV-3978G (Unit #3) 1,2,4,5 i

SV-4960B (Unit #2); SV-5960B (Unit #3) 1,2,4,5 SV-4961B (Unit #2); SV-5961B (Unit #3) 1,2,4,5 SV-4966B (Unit #2); SV-5966B (Unit #3) 1,2,4,5 SV-8100 (Unit #2); SV-9100 (Unit #3) 1,2,4,5 SV-8101 (Unit #2); SV-9101 (Unit #3) 1,2,4,5 i

32C, D ILRT System Two Globe Valves 1,2,4,5,13 i

35E, to G TIP Ball Valves 1,2,4,5 TIP Shear valves 19 35C SV-109; Check Valve 1,2,4,5 i

37A to D CRD Insert; HCJ 18 38 CV-3-32A; CV-3-32B; CV-3-33 1,2,4,5 CV-3-35A; CV-3-35B; CV-3-36 1,2,4,5' CRD Withdrawal; HCU 18 39A MO-10-31B 1,2,4,5,9,10 MO-10-26B 1,2,4,5 SV-4949B (Unit #2); SV-5949B (Unit #3) 1,2,4,5-Check Valve 1,2,4,5 39B MO-10-31A 1,2,4,5,9,10 MO-10-26A 1,2,4,5 SV-4949A (Unit #2); SV-5949A (Unit #3) 1,2,4,5 Check Valve 1,2,4,5

-186-

-.